Professional Documents
Culture Documents
This alternative mode of transportation provides: 10 day Free storage at NCT 1 and 2 with no retroactive effect Natural discount of 53% for Arrastre and Wharfage Reliability and dependability of the SCTEX, TPLEX and NLEX Tollroads
PORT USE COST COMPARISON (IMPORT) CLARK LOCATORS AND BATAAN SUMMARY OF COST SAVINGS AND ADVANTAGES
i.
Import Cargoes a)
Percentages 52.93%
40 footer
b)
Php 4,536.64
Savings Php 20.77 Php 31.17
5 days extra of Free storage
53.05%
Percentages 3.57% 3.57%
c)
Storage
Subic has 10 days real free storage without retroactive effect on charges. The amount is fixed everyday without 10% increase base on principal per container.
d)
Trucking Cost and other incidental charges (Without Increase Mla daytime truck ban)
20 footer 40 footer Php Php 2,090.00 2,090.00
e)
Trucking Cost and other incidental charges (With Increase Mla daytime truckban)
20 footer Php Php 21,540.00 21,540.00
40 footer
f)
Php
19,450.00
Php
19,450.00
i.
b) Wharfage
40 footer Php 15.65 0.00%
c)
Storage
Subic has 10 days real free storage without retroactive effect on charges. The amount is fixed everyday without 10% increase base on principal per container.
d)
Trucking Cost and other incidental charges (Without Increase Mla daytime truckban)
40 footer Php 5,724.15
e)
Trucking Cost and other incidental charges (With Increase Mla daytime truckban CLARK LOCATORS)
40 footer Php 21,540.00
f ) Trucking Cost and other incidental charges (With Increase Mla daytime truckban BATAAN LOCATORS)
40 footer Php 33,574.15
52.93% 53.05%
Wharfage
20" 40"
Php 560.90 Php 841.37 10 days Free 11th day Php 511.65 Php 1,023.30 Php 1,151.55
3.57% 3.57%
Note: Manila will add 12% VAT on all charges while Subic is a Non VAT charges
MANILA STORAGE CHARGES AFTER THE FREE -STORAGE PERIOD (FSP) OF FIVE (5) DAYS IN PHP
11th - 15 th day
16th - 20 th day
21th - 25 th day
20 ft
Php 529.43
Php
577.56
Php 625.69
Php 673.82
Php 721.95
40 ft
Php 1,058.86
Php
1,155.12
Php 1,251.38
Php 1,347.64
Php 1,443.90
45 ft
Php
1,191.19
Php
1,299.48
Php 1,407.77
Php 1,516.06
Php
1,624.35
MANILA
SUBIC
REMARKS
X Ray
same
Cleaning/THC/Docs fee
per box
same
INLAND BROKERAGE CHARGES Bank Charge Forms/Stamps E-taps CSF Lodgement Fee Telegram per document Php 90.00 Php 90.00 n/a n/a Php 90.00 Php 90.00 per document same
Php 5,000.00
Php 5,000.00
Php Php Php Php 14,000.00 14,000.00 12,000.00 12,000.00 Php Php Php Php 19,090.00 19,090.00 17,000.00 17,000.00
MANILA 20 ft COST DIFF. vs. TRUCKBAN per box Php 19,450.00 40 ft Php 19,450.00 20 ft
Php 21,540.00
SUBIC
20 ft
COST DIFF. vs. MANILA per box Php 2,090.00
40 ft
Php 2,090.00
SUBIC/SBMA
TEU
SAVINGS
Percentage
1,614.16 3,708.50
53.05% 53.06%
10 days Free 11th day Php Php Php 127.80 256.05 286.20
5 days free
Note: Manila will add 12% VAT on all charges while Subic is a Non VAT charges
MANILA STORAGE CHARGES AFTER THE FREE -STORAGE PERIOD (FSP) OF FIVE (5) DAYS IN PHP
7th - 11 th day 12th - 16 th day 17th - 21 th day 22nd - 26 th day 27th 31stday 32nd day and beyond
20 ft
Php 120.30
Php 132.33
Php 144.36
Php 156.36
Php 168.42
Php 180.45
40 ft
Php 240.60
Php 264.66
Php 288.72
Php 312.78
Php 336.84
Php 360.90
45 ft
Php 268.80
Php 295.68
Php 322.56
Php 349.44
Php 376.32
Php 403.20
Description
Arrastre Wharfage
Unit
Per Box Per Box
Weigh-in
THC / docs fee Bank Charge Forms/Stamps AEDS Boat Note (as Applicable) Processing/Brokerage
Per Box same SHIPPING LINE CHARGES Per Box same INLAND BROKERAGE CHARGES
Per Document Per Document
same
Php 3,000.00
Trucking
Per Box
FOR CLARK SUBIC 40' Footer COST DIFF. vs. TRUCKBAN per box Php
40' Footer COST DIFF. vs. MANILA per box Php 5,724.15
For Shipping Lines Natural deep harbor from approach channel to berthing position at NCT 1 and 2 Post Panamax Ship-To-Shore Cranes performing 25 moves / hour / crane Minimal or dredging required for bigger and longer vessels Accommodate longer and bigger container vessels For Shipper/Consignees Natural 53% discount on Arrastre and Wharfage, combined 10 day free storage, without retroactive effect Reliable, Dependable and Sustainable overall logistics solution Time value accountability Minimiize or eliminate Overhead costs in logistics, administration and production costs Forwarders/Brokers/Haulers/Truckers Accreditation improvements at Freeport Zone More productivity per day/per trip Less maintenance cost Maximize profitability Government Agencies Increase utilization, productivity and improved service at Freeport Zone
THANK YOU