Aggregate Planning

Dealing with the Problem Complexity


through Decomposition
Aggregate Planning
Master Production Scheduling
Materials Requirement Planning
Aggregate Unit
Demand
End Item (SKU)
Demand
Corporate Strategy
Capacity and Aggregate Production Plans
SKU-level Production Plans
Manufacturing
and Procurement
lead times
Component Production lots and due dates
Part process
plans
(Plan. Hor.: 1 year, Time Unit: 1 month)
(Plan. Hor.: a few months, Time Unit: 1 week)
(Plan. Hor.: a few months, Time Unit: 1 week)
Shop floor-level Production Control
(Plan. Hor.: a day or a shift, Time Unit: real-time)
Aggregate Planning Problem
Aggregate Planning
Aggregate
Unit Demand
Aggregate
Unit Availability
(Current Inventory
Position)
Aggregate
Production Plan
Required
Production Capacity
Aggr. Unit
Production Reqs
Corporate Strategy
Aggregate Production Plan:
Aggregate Production levels
Aggregate Inventory levels
Aggregate Backorder levels
Production Capacity Plan:
Workforce level(s)
Overtime level(s)
Subcontracted Quantities
Product Aggregation Schemes
Items (or Stock Keeping Units - SKUs): The final products delivered to the
(downstream) customers
Families: Group of items that share a common manufacturing setup cost;
i.e., they have similar production requirements.
Aggregate Unit: A fictitious item representing an entire product family.
Aggregate Unit Production Requirements: The amount of (labor) time
required for the production of one aggregate unit. This is computed by
appropriately averaging the (labor) time requirements over the entire set of
items represented by the aggregate unit.
Aggregate Unit Demand: The cumulative demand for the entire set of items
represented by the aggregate unit.
Remark: Being the cumulate of a number of independent demand series, the
demand for the aggregate unit is a more robust estimate than its constituent
components.
Computing the Aggregate Unit
Production Requirements
Washing machine
Model Number
Required labor time
(hrs)
Item demand as % of
aggregate demand
A5532 4.2 32
K4242 4.9 21
L9898 5.1 17
3800 5.2 14
M2624 5.4 10
M3880 5.8 06
Aggregate unit labor time = (.32)(4.2)+(.21)(4.9)+(.17)(5.1)+(.14)(5.2)+
(.10)(5.4)+(.06)(5.8) = 4.856 hrs

Pure Aggregate Planning Strategies
1. Demand Chasing: Vary the Workforce Level
D(t) P(t) = D(t)
W(t)
PC WC HC FC
D(t): Aggregate demand series
P(t): Aggregate production levels
W(t): Required Workforce levels
Costs Involved:
PC: Production Costs
fixed (setup, overhead)
variable (materials, consumables, etc.)
WC: Regular labor costs
HC: Hiring costs: e.g., advertising, interviewing, training
FC: Firing costs: e.g., compensation, social cost

Pure Aggregate Planning Strategies
2. Varying Production Capacity with Constant Workforce:
D(t) P(t)
O(t)
PC WC OC UC
U(t)
S(t)
SC
W = constant
S(t): Subcontracted quantities
O(t): Overtime levels
U(t): Undertime levels
Costs involved:
PC, WC: as before
SC: subcontracting costs: e.g., purchasing, transport, quality, etc.
OC: overtime costs: incremental cost of producing one unit in overtime
(UC: undertime costs: this is hidden in WC)

Pure Aggregate Planning Strategies
3. Accumulating (Seasonal) Inventories:
D(t) P(t)
I(t)
PC WC IC
W(t), O(t), U(t), S(t) = constant
I(t): Accumulated Inventory levels
Costs involved:
PC, WC: as before
IC: inventory holding costs: e.g., interest lost, storage space, pilferage,
obsolescence, etc.

Pure Aggregate Planning Strategies
4. Backlogging:
D(t) P(t)
B(t)
PC WC BC
W(t), O(t), U(t), S(t) = constant
B(t): Accumulated Backlog levels
Costs involved:
PC, WC: as before
BC: backlog (handling) costs: e.g., expediting costs, penalties, lost sales
(eventually), customer dissatisfaction

Typical Aggregate Planning Strategy
A mixture of the previously discussed pure options:
D
PC WC HC FC OC UC SC IC BC
P
W
H
F
O
U
S
I
B
+
Additional constraints arising from the company strategy; e.g.,
maximal allowed subcontracting
maximal allowed workforce variation in two consecutive periods
maximal allowed overtime
safety stocks
etc.
Io
Wo
Solution Approaches
Graphical Approaches: Spreadsheet-based simulation
Analytical Approaches: Mathematical (mainly linear
programming) Programming formulations
Analytical Approach:
A Linear Programming Formulation
min TC = S
t
( PC
t
*P
t
+WC
t
*W
t
+OC
t
*O
t
+HC
t
*H
t
+FC
t
*F
t
+
SC
t
*S
t
+IC
t
*I
t
+BC
t
*B
t
)
s.t.
t, P
t
+I
t-1
+S
t
= (D
t
-B
t
)+B
t-1
+I
t

t, W
t
= W
t-1
+H
t
-F
t

t, (u_l_r)*P
t
(s_d)*(w_d)
t
*W
t
+O
t

t, P
t
, W
t
, O
t
, H
t
, F
t
, S
t
, I
t
, B
t
0
(
) Any additional policy constraints
Prod. Capacity:
Material Balance:
Workforce Balance:
Var. sign restrictions:
Time unit: month / unit_labor_req. /shift_duration (in hours) /
(working_days) for month t
Demand (vs. Capacity) Options or
Proactive Approaches to
Aggregate Planning
Influencing demand variation so that it aligns to available
production capacity:
advertising
promotional plans
pricing
(e.g., airline and hotel weekend discounts, telecommunication
companies weekend rates)
Counter-seasonal product (and service) mixing: Develop
a product mix with antithetic (seasonal) trends that level
the cumulative required production capacity.
(e.g., lawn mowers and snow blowers)
=> The outcome of this type of planning is communicated
to the overall aggregate planning procedure as (expected)
changes in the demand forecast.