This document outlines the design assumptions and concepts for a highway project involving the construction of a 24.6km main line with 14 interchanges and 3 toll plazas. It discusses the preliminary alignment and design packages divided into 6 sections. The key design assumptions covered include the concrete grade, reinforcement cover, traffic live load, and structural design codes. The document also provides details on the proposed bridge structures including superstructure and substructure elements, span configurations, and bridge articulation.
This document outlines the design assumptions and concepts for a highway project involving the construction of a 24.6km main line with 14 interchanges and 3 toll plazas. It discusses the preliminary alignment and design packages divided into 6 sections. The key design assumptions covered include the concrete grade, reinforcement cover, traffic live load, and structural design codes. The document also provides details on the proposed bridge structures including superstructure and substructure elements, span configurations, and bridge articulation.
This document outlines the design assumptions and concepts for a highway project involving the construction of a 24.6km main line with 14 interchanges and 3 toll plazas. It discusses the preliminary alignment and design packages divided into 6 sections. The key design assumptions covered include the concrete grade, reinforcement cover, traffic live load, and structural design codes. The document also provides details on the proposed bridge structures including superstructure and substructure elements, span configurations, and bridge articulation.
Besi - Ul u Kl ang Sdn. Bhd. Ti ngkat 3 Bl ok G, Excel l a Busi ness Park, J al an Ampang Put ra, Taman Ampang Hi l i r, 55100 Kual a Lumpur. Mai n Consul tant : Sepakat Seti a Perundi ng Sdn. Bhd. Wi sma SSP, Level 8- 18, No 1, J l n SR 8/3 Serdang Raya, 43300 Seri Kembangan, Sel angor. 3 1 INTRODUCTION 2 DESIGN ASSUMPTIONS 4 DESIGN PACKAGES DESIGN CONCEPTS SRI PETALING SG. BESI ALAM DAMAI CHERAS KAJANG CHERAS HARTAMAS BKT TERATAI PERMAI TASIK TAMBAHAN PKN AMPANG KOSAS BKT ANTARABANGSA AMPANG POINT TMN HILLVIEW ULU KELANG Main Line 24.6 km Interchanges 14 nos. Toll Plazas 3 nos.
BUKIT ANTARABANGSA BUKIT BELACAN TMN KOSAS TMN PUTRA TMN BUKIT PERMAI PANDAN INDAH TMN BUKIT SEGAR CHERAS HARTAMAS BDR TASIK SELATAN TAMAN CONNAUGHT ALAM DAMAI BKT JALIL SRI PETALING TASIK PERMAI TASIK TAMBAHAN JALAN LOKE YEW MIDDLE RING ROAD 2 (MRR2) AKLEH DUKE GRAND SAGA PLUS BESRAYA KESAS TAMAN DAGANG DBKL MPAJ MPKj 92% 8% Alignment Composition Elevated At-grade SECTION A SECTION B Overall Alignment (Section A) Sri Petaling Interchange Sg. Besi Interchange Alam Damai Interchange Cheras Kajang Interchange Cheras Hartamas Interchange Toll Plaza No.1 And Rest & Service MRR2 to Ampang Alignment on Geological Map (Section A) Granite Quartzite and phyllite Limestone Schist Vein quartz Phyllite lens 3 1 INTRODUCTION 2 DESIGN ASSUMPTIONS 4 DESIGN PACKAGES DESIGN CONCEPTS 1. Superstructure :- i. Span Configuration Short to medium span = 30.0m (U-Beam) Medium span = 40.0m (T-Beam) Special crossing = > 50.0m (Segmental B.G. & Balanced Cantilever B.G.)
ii. Bridge Articulation 1 module consist of 4 to 5 spans with continuous deck (link deck) concept Precast beams seated on elastomeric rubber bearings 1 module consist of 4 to 5 spans Bridge Structure / Bridge Type 1. Superstructure :- iii. Continuous Deck System (CDS) Continuity with structurally continuous top slab, short lengths of the top slab are locally separated from the top of the beams (BA 57/01) Superstructure is constructed in the usual manner by simply supported ends of precast beams on separate bearings Span by span easy construction Continuity with structurally continuous top slab Proposed CDS Bridge Structure / Bridge Type (iv) Parapet - Reinforced concrete parapet designed to TL-4 impact - Aesthetic faade or shape can be designed to suit
(v) Rain Water Down Pipe (RWPD) - uPVC RWDP class D to be used. - RWDP not to cast in the bridge pier. Bridge Structure / Bridge Type 2. Substructure :- i. Pier type T-shape pier Portal pier Staggered portal pier Double decker pier
ii. Cross head Precast segmental crosshead (post-tensioned) Cast in-situ cross head
iii. Column shape Rectangle shape with emboss/grooves (H < 25.0m) Hollow core pier with emboss/grooves (H > 25.0m)
iv. Foundation Bored piles (non-displacement piles) Caisson piles Bridge Structure / Bridge Type 3 1 INTRODUCTION 2 DESIGN ASSUMPTIONS 4 DESIGN PACKAGES DESIGN CONCEPTS (i) Design Code & References 13.BS5400 Part 9: 1983 Code of Practice for Design of Concrete Bridges Bridge Bearings, BSI 14.BD28/87 Early Thermal Cracking 15.BS6779 Parapets for Vehicle Containment on Highways 16.BS5950 Structural Use of Steel 17.BS8004:1998 Foundations 18.BD30/87 Backfilled Retaining Walls and Bridge Abutments. 19.BD31/01 The Design of Buried Concrete Box and Portal Frame Structures. 20.BD52/93 The Design of Highway Bridge Parapets. 21.BD57/95 Design of Durability 22.BD74/00 Foundations 23.BA24/87 Early Thermal Cracking of Concrete (Advice Note). 24.BA26/94 Expansion Joints for use in Highway Bridge Decks 25.CIRIA Guide 1: A Guide to the Design of Anchor Blocks for Post Tensioned Prestressed Concrete. 26.AASHTO LFRD Bridge Design Specification 4th Edition, 2007 27.Guide Specification for Design and Construction of Segmental Concrete Bridges (AASHTO) 2003 Interim Edition 1. BD15/92 General Principles for the Design and Construction Bridges: Use of BS5400: PT1: 1998 BD20/92 Bridge Bearing Use of BS5400: Part 9 :1983 BD37/01 Loads for Highway Bridges, Department of Transport and Traffic Highway and Traffic. 2. BD58/94 Part 9 & 10 for the Design of Concrete Highway Bridges and Structures with External and Unbonded Prestressing. 3. BS5400 Part 1: 1998 for General Statement Steel, concrete and composite bridges, BSI 4. BS5400 Part 4: 1990 Code of Practice for Design of Concrete Bridges Steel, Concrete and Composite Bridges, BSI 5. BD24/92 The Design of Concrete Highway Bridges and Structures, Use of BS5400: Part 4: 1990 6. BD33/94 Expansion Joints for Use in Highway Bridge Decks. 7. BD42/96 Design of Integral Bridge 8. BD60/04 Vehicle Collision Load 9. BS8006 Code of Practice4 for Reinforced Soil and Other Fills 10.BS8002 Code of Practice for Earth Retaining Structures 11.BS8110 Part 1 Structural Use of Concrete Code of Practice for Design and Construction 12.BS 4449:1997 - Specification for carbon steel bars for the reinforcement of concrete. DESIGN ASSUMPTION (ii) Concrete Grade Structural Element Minimum Cube Strength (N/mm2) Aggregate Size (mm) Superstructure Precast Element 50/55/60 20 In-Situ Superstructure 50 20 In-Situ Continuity Stitches 40 20 Parapet 40 20 Bearing Plinth 50 20 Pier Crosshead & Column 40/50 20 Abutment, bases & Pile Cap 40 20 Bored Piles 40 20 Precast Pile (Minimum) 60 20 Caisson 40 20 Blinding 20 20 DESIGN ASSUMPTION (iii) Cover to Reinforcement and Exposure Condition Element Cover Detail (mm) Exposure Condition Piles (Bored Cast In-Situ) 75 Severe Pile caps 50/75 (soffit) Severe Columns, crosshead and diaphragm 50 Severe Abutment and approach slab 50 Severe Cast in-situ deck slab (soffit) 40 Severe Cast in-situ deck slab (top) 40 Severe Post-tensioned beam (site casting) 45 Severe Pre-tensioned beam external face 35 Severe Pre-tensioned internal face 25 Moderate Bearing plinth 50 Severe Parapets 50 Severe DESIGN ASSUMPTION (iv) Class Categories of Prestressed Concrete Structure Class 1 Under Load Combination 1 - HA load only Class 2 Under Load Combination 2 to 5 HA or HA+30HB
(v) Traffic Live Load
HA & HB Loading Bridges shall be designed for HA loading combined with HB loadings and pedestrian live load where appropriate in accordance with BD37/01 and BD24/92. The following shall be adopted in the analysis and design.
I. Serviceability Limit State SLS Load Combination 1: Type HA+KEL loading for prestress design Class 1 (zero tension) and crack width check for reinforced concrete section. SLS Load Combination 2 to 5: Type HA+KEL, or Type HA+KEL in combination with 30 units of HB to prestress design Class 2 for all bridge structures.
II. Ultimate Limit State ULS Load Combination 1 to 5: Type HA+KEL, or Type HA+KEL in combination with 45 units of HB. DESIGN ASSUMPTION (v) Crack width The serviceability limit state of crack for the reinforced concrete components shall follow the requirements as specified in Clause 6.3.2.4 of BS5400-Part 4. The maximum design crack width shall not exceed 0.25mm based on the nominal / actual concrete covers whichever is more.
(vi) Centrifugal force, longitudinal force, wind load, temperature load The above mentioned forces shall be designed in accordance with BD 37/01. Partial load factor shall be in accordance with BD 37/01.
(vii) Creep & shrinkage The above mentioned forces shall be designed in accordance with BS 5400, Part 4. The relative humidity is to be assumed at 70%.
(viii) Earthquake loading In view of the lack of standard and code of practice specifically available for Malaysia, it is recommended that a PGA of 0.03g be adopted for this project. This is based on the values widely adopted by current construction industry.
(viii) Vehicle collision load For collision force to piers within 4.5m of a carriageway shall design in accordance to BD 60/04, The Design of Highway Bridges for Vehicle Collision Loads. For collision force to piers greater than 4.5m from the edge of a major carriageway with a safety fence shall design in accordance to BS 5400 Part2 Cl 6.9. DESIGN ASSUMPTION 3 1 INTRODUCTION 2 DESIGN ASSUMPTIONS 4 DESIGN PACKAGES DESIGN CONCEPTS (Preliminary Alignment & Bridge GA) Item Package Name A1 A2 A3 A4 A5 A6 1 Lead Consultant SSP 2 Detailed Design Consultant (DDC) SSP JURUTERAS PSCE SSP EDP AMIN & TEH 3 Chainage (KM) 0 2.4 2.4 4.2 2.4 6.0 6.0 7.8 7.8 9.6 9.6 11.0 4 Scope of Preliminary Design Preliminary Alignment & Bridge General Arrangement 5 Scope of Detailed Design 1) Road Works (including widening of existing roads) 2) Bridge & Structure 3) Geotechnical (Bridge Foundation) 4) Drainage (for bridge / viaduct) 5) Relocation (or protection) of existing drainage, water pipe and sewer pipe 6) Toll Buildings & Infra 7) Toll Building & Toll Plaza (M & E Services) 8) Street Lighting (for bridge / viaduct) (including soffit lighting & high mast lighting) 9) Relocation of existing Street Lighting 10) Relocation (or protection) of existing power and tele-communication cables) 11) Relocation of TNB Overhead Transmission Cable 6 Topographic Nature Built-Up Areas & Rolling Terrain Built-Up Areas & Rolling Terrain Built-Up Areas & Rolling Terrain Built-Up Areas & Rolling Terrain Built-Up Areas & Rolling Terrain Built-Up Areas & Hilly Terrain Item Package Name A1 A2 A3 A4 A5 A6 7 Traffic Management KESAS, MRR2, KLSH & BESRAYA MRR2 Jalan 1/118B, Jalan Alam Damai & Persiaran Alam Damai Jalan Alam Damai, Persiaran Alam Damai & Jalan 1/144A Cheras Kajang Highway Jalan Bandar Baru Segar Utama & Jalan Bukit Segar Jaya 8 Upgrading of Existing Road MAJOR (Widening of KESAS & MRR2 for construction of piers at median & shoulder) MAJOR (Widening of MRR2 for construction of piers at median & shoulder) MAJOR (Existing Alam Damai will be modified to underpass adjacent to Toll Plaza & construction of pier at median & shoulder of existing road) MAJOR (Existing Alam Damai will be modified to underpass adjacent to Toll Plaza & construction of pier at median & shoulder of existing road) NOMINAL (Construction of Acceleration & Deceleration on both side of Cheras Kajang Highway) NOMINAL (Traffic Light Junction at Jln Bandar Baru Segar Utama & Jln Bukit Segar Jaya for ramp connection with SUKE) 9 Interfacing Issues between Packages & other Highways Sri Petaling Interchange & Sg. Besi Interchange (KESAS, MRR2, KLSH & BESRAYA) MRR2 Jalan 1/118B, Jalan Alam Damai & Persiaran Alam Damai Alam Damai Interchange (Jalan Alam Damai & Persiaran Alam Damai) & Jalan 1/144A Cheras Kajang Interchange (Cheras Kajang Highway) Cheras Hartamas Interchange (Jln Bandar Baru Segar Utama & Jln Bukit Segar Jaya) Package A1 Layout Plan CHAINAGE CH.0 CH.2400 PACKAGE A1 LOCATION SRI PETALING I/C & SG.BESI I/C LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD Package A1 Mainline Profile Crossing ERL, STAR LRT, KTM KESAS Hwy To Sg Besi To Ulu Kelang Elevated Viaduct Summary Package Alignment Chainage Superstructure Type Span Configuration Substructure Type
A1 Ch 0 - 2400 Mainline Ulu Kelang Bound Ch. 950- 1330 SBG 60+100+100+6 0+60+60 T Pier (Precast segmental x- head), Portal Pier, Single Pier Supporting SBG Structure & Special Crossing. Ch. 2045- 2280 Special Crossing 65+105+65 U-Beam & T- Beam U- (30m), T- (>30,<40) Bkt Jalil Bound Ch. 900- 1230 SBG 50+50+50+60+ 60+60 Ch. 2000- 2220 Special Crossing 60+100+60 U-Beam & T- Beam U- (30m), T- (>30,<40) Sri Petaling I/C MS10, MS20, MS30, MS40, MS60 Ramps U-Beam & Voided Slab U- (30m), VS- (30m) T Pier, Portal Pier. MS50 Ramps SBG 40+40+40+55+ 60+60+ 60+60+60 Single Pier Supporting SBG. Sungai Besi I/C MB10, MB20, MB30 Ramps U-Beam & Voided Slab U- (30m), VS- (30m) T Pier, Portal Pier. Bridge Foundation Estimated Pile Length BH REF COORDINATES APPROXIMATE BH CHAINAGE APPROXIMATE CHAINAGE Pier ID PILE DIAMETER, D (mm) WORKIN G LOAD, WL (kN) ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) E N BH 18 146.851 -12125.972 CH 1500 CH1300 - 1600 CH1225 - 1600 BP5 BP13 SP6 SP15 2500 38000 65m in Hard Soil 95m BH 22 184.062 -12041.878 CH 1600 CH1600 - 1950 CH1600 - 1900 BP14 BP22 SP16 SP23 2200 32000 16m in Limestone 36m BH36 724.736 -11770.507 CH2200 CH2360 AP1 AP4 2200 23820 11.0 in Limestone 23.0 JP1 JP5 2200 24250 11.5 in Limestone 23.5 Main Line: Sri Petaling Interchange
Pile size, mm dia. Pile Type Estimated working load, kN BH REF ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) 1 MS10 900 Bored pile 4250 BH3 17.0 in very hard soil 41.0 2 MS20 900 Bored pile 4250 BH25 4.0 in Limestone 22.0 3 MS30 900 Bored pile 4250 BH12 15.0 in very hard soil 42.0 4 MS40 1200 Bored pile 8500 BH4 24.0 in very hard soil 46.5 5 MS50 1200 Bored pile 8500 BH19 25.0 in very hard soil 47.5 6 MS60 900 Bored pile 4250 BH13 4.5 in Limestone 28.5 Sungai Besi Interchange
Pile size, mm dia. Pile Type Estimated working load, kN BH REF ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) 1 MB10 900 Bored pile 4250 BH32 5.0 in Limestone 17.0 2 MB20 900 Bored pile 4250 BH30 4.5 in Limestone 12.0 3 MB30 900 Bored pile 4250 BH34 5.0 in Limestone 17.0 Bridge Foundation Estimated Pile Length Interchange: Main Line Ulu-Kelang Bound 30m span U-12 Beams Main Line Both Bound Special Crossing Cast In-situ Box Girder (65m+105m+65m) Main Line Sg. Besi Bound 30m span U-12 Beams Main Line Ulu-Kelang Bound Precast Segmental Box Girder 60+60+60 Main Line Ulu-Kelang Bound Precast Segmental Box Girder 60+60+60 CHAINAGE CH.2400 CH.4200 PACKAGE A2 LOCATION MRR2 LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT JURUTERAS ENGINEERS SDN BHD Package A2 Layout Plan Package A2 Mainline Profile Along MRR2 To Sg Besi To Ulu Kelang Package Alignment Chainage Superstructure Type Span Configuration Substructure Type
A2 Ch 2400 4200 Mainline Ulu Kelang Bound Ch. 2400- 4200 U-Beam & T- Beam U- (30m), T- (>30,<40) T Pier (Precast segmental x-head). Bkt Jalil Bound Elevated Viaduct Summary BH REF COORDINATES APPROXIMATE BH CHAINAGE APPROXIMATE CHAINAGE PIER ID PILE DIAMETER, D (mm) WORKING LOAD, WL (kN) ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) E N BH37 711.250 -11522.108 CH2360- CH2520 AP5 2200 26560 13.0 in Limestone 26.5 JP6 JP10 2200 28500 14.0 in Limestone 27.5 AP6 AP9 2200 28500 14.0 in Limestone 27.5 BH38 715.995 -11420.693 CH2520 CH3060 AP10 AP23 2200 30040 14.0 in Limestone 36.5 JP11 JP25 2200 30040 14.0 in Limestone 36.5 BH40 1043.074 -10890.923 CH3060 CH3280 AP24 AP29 2500 38090 15.5 in Siltstone/Sandston e 56.0 or 55.0 in hard soil 92.5 JP26 JP31 2500 38090 15.5 in Siltstone/Sandston e 56.0 or 55.0 in hard soil 92.5 BH41 1169.623 -10826.079 CH3280 CH3560 AP30 AP38 2200 30810 7.5 in Granite 44.0 JP32 JP40 2200 30810 7.5 in Granite 44.0 BH43 1453.598 -10753.018 CH3560 CH3660 AP39 - AP41 2200 27900 7.5 in Granite 21.0 JP41 JP43 2200 27900 7.5 in Granite 21.0 BH44 1528.471 -10646.438 CH3660 CH 3800 AP42 AP44 2500 37300 13.0 in Granite 55.0 59.5 in hard soil 94.0 JP44 JP47 2500 37300 13.0 in Granite 55.0 59.5 in hard soil 94.0 BH45 1650.572 -10556.56 CH3800 CH4140 AP45 AP54 2200 28700 8.0 in Granite 30.5 JP48 JP57 2200 28700 8.0 in Granite 30.5 Bridge Foundation Estimated Pile Length Main Line: Main Line Both Bounds 30m span U-12 Beams CHAINAGE CH.4200 CH.6000 PACKAGE A3 LOCATION ALAM DAMAI LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT PRODUKIF SEPAKAT CONSULTING ENGINEERING SDN BHD Package A3 Layout Plan Package A3 Mainline Profile To Sg Besi To Ulu Kelang Package Alignment Chainage Superstructure Type Span Configuration Substructure Type
A3 Ch. 4200 - 6000 Mainline Ulu Kelang Bound Ch. 4200- 6000 U-Beam & T-Beam U- (30m), T- (>30,<40) T Pier (Precast segmental x- head), Staggered Portal Pier, Double Decker Pier. Bkt Jalil Bound Elevated Viaduct Summary BH REF COORDINATES APPROXIMATE BH CHAINAGE APPROXIMATE CHAINAGE PIER ID PILE DIAMETER, D (mm) WORKING LOAD, WL (kN) ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) E N BH46 1920.648 -10469.745
CH4240 CH4600 AP59 AP70 1650 15000 5.0 in Granite 30.5 9000 3.0 in Granite 28.5 BH48 2395.162 -10413.586
CH4600 - CH4940 AP71 AP79 1650 18500 7.0 in Granite 19.0 13000 5.0 in Granite 17.0 BH49 2513.615 -10487.854
CH4940 - CH5320 AP80 AP91 1650 16000 5.5 in Granite 32.5 10000 3.0 in Granite 30.0 Bridge Foundation Estimated Pile Length Main Line: Main Line Both Bounds 30m span U-12 Beams 40m span T Beams
CHAINAGE CH.6000 CH.7800 & TP1 PACKAGE A4 LOCATION ALAM DAMAI LEN SENG LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD Package A4 Layout Plan Package A4 Mainline Profile Toll Plaza 1 To Sg Besi To Ulu Kelang Package Alignment Chainage Superstructur e Type Span Configuration Substructure Type
A4 Ch. 6000 7800 Mainline Toll Plaza Ch. 6020 - 6700 U-Beam U- (20, 30) Double Decker, Toll Plaza Pier Ulu Kelang Bound Ch 6700 7800 U-Beam
U-Beam
Double Decker, Hollow Core Pier. Bkt Jalil Bound Ch 6700 7800 Alam Damai I/C MA10, MA40 Ramps U-Beam & T- Beam U- (30m), T- (>30m, <40) T Pier, Hollow Core Pier, Portal Pier. Elevated Viaduct Summary BH REF COORDINATES APPROXIMATE BH CHAINAGE APPROXIMATE CHAINAGE PIER ID PILE DIAMETER, D (mm) WORKING LOAD, WL (kN) ESTIMATED SOCKET LENGTH, (m) ESTIMATE D PILE LENGTH, bcl (m) E N Toll plaza CH6260- CH6780 TP1 TP15 BH57 4284.935 -11121.723 CH6780 - CH6860 AP127 AP130 1650 16000 6.0 in Granite 18.0 10000 3.5 in Granite 15.5 BH58 4457.439 -11051.700 CH6920 - CH7580 AP132 AP148 1650 18500 6.0 in Granite 24.0 13000 4.0 in Granite 22.0 BH64 5212.436 -10690.780 CH7880 CH7420 7900 AP144 -AP155 1200 7000 3.0 in Granite 30.0 Bridge Foundation Estimated Pile Length Main Line: Alam Damai Interchange
Pile size, mm dia. Pile Type Estimated working load, kN BH REF ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) 1 MA10 1500 Bored pile 10000 BH57 4.0 in Granite 16.0 4 MA40 1500 Bored pile 10000 BH58 3.5 in Granite 21.5 Bridge Foundation Estimated Pile Length Interchange: Main Line / Toll Plaza 30m span U-12 Beams
PROPOSED REALIGMENT BY PUBLIC - MANDARINA Proposed East West Link (EWL) Expressway by Taman Bukit Mandarina 2 Residence : on 18 th Oct. 2012; Selangor State appointed UTM Prof. Dr. Othman Che Puan as independent cosultant to carry out comparative study on the alignment, on 07 th Feb. 2013; the report was presented to UPEN, it was concluded that the original SUKE alignment is a better option compared to EWL.
EAST WEST LINK PROPOSED ALAM DAMAI INTERCHANGE ALAM DAMAI TOLL PLAZA & INTERCHANGE RAMPS TO PERSIARAN ALAM DAMAI PROPOSED REALIGMENT BY PUBLIC ALAM DAMAI DAMAI 23 (2 storeys Shop Lots
4 storeys Shop Lots (Under Construction) (With 2 lanes Ramp Toll) To acquire: 28 shop lots (2 storeys) 21 nos. of terrace houses 1 construction areas Damai 23 Shop Lots under construction
PROPOSED RAMPS TO JALAN ALAM DAMAI WITH RAMP-TOLL CHAINAGE CH.7800 CH.9600 PACKAGE A5 LOCATION CHERAS KAJANG I/C & FOREST RESERVE LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT EDP CONSULTING GROUP SDN BHD Package A5 Layout Plan Package A5 Mainline Profile Crossing Cheras Kajang Hwy Forest Area To Sg Besi To Ulu Kelang Package Alignment Chainage Superstru cture Type Span Configuration Substructure Type
60+100+60 Single Pier Supporting Special Crossing. Bkt Jalil Bound - U-Beam & T-Beam U- (30m), T- (>30m, <40) T Pier, Hollow Core Pier, Portal Pier. Ch. 7920 - 8140 Special Crossing 60+100+60 Single Pier Supporting Special Crossing. Cheras Kajang I/C MK10, MK20, MK30, MK40, MK50 Ramps U-Beam & Voided Slab U- (30m), VS- (30m) T Pier, Portal Pier, Hollow Core Pier. Elevated Viaduct Summary BH REF COORDINATES APPROXIMAT E BH CHAINAGE APPROXIMATE CHAINAGE PIER ID PILE DIAMETER , D (mm) WORKIN G LOAD, WL (kN) ESTIMATED SOCKET LENGTH, (m) ESTIMATED PILE LENGTH, bcl (m) E N BH64 5212.436 -10690.780 CH7880 CH7420 7900 AP144 -AP155 1200 7000 3.0 in Granite 30.0 BH 67 5195.718 -10602.625 CH 7980 CH7900 8020 BCP1 BCP2 1200 7000 4.0 in Granite 19.0 BH 70 5156.615 -10515.240 CH 8100 CH8020 8120 BCP3-BCP4 1200 7000 3.5 in Granite 15.5 BH 72 5174.268 -10434.413 CH 8140 CH8120 8180 AP156 1200 7000 3.5 in Granite 24.0 BH 74 5216.026 -10361.218 CH 8200 CH8180 8220 AP157 1200 7000 3.5 in Granite 12.5 BH 75 5256.393 -10317.487 CH 8240 CH8220 8260 AP158 1200 7000 3.5 in Granite 9.5 BH 76 5256.448 -10252.312 CH 8320 CH8260 8300 AP159 1200 7000 3.5 in Granite 13.0 BH 77 5140.376 -10221.072 CH 8400 CH8300 8520 AP160- AP165 1200 7000 3.0 in Granite 31.5 BH 79 5029.842 -10080.072 CH 8560 CH8520 8820 AP166 - AP 172 1200 7000 2.0 in Granite 33.5 BH 81 4990.014 -9808.321 CH 8900 CH8820 8980 AP 173 1200 7000 2.5 in Granite 34.0 BH 84 5056.787 -9747.469 CH 9200 CH8980 9380 AP174- AP183 1200 6500 3.5 in Granite 20.0 BH 88 5445.465 -9489.165 CH 9520 CH9380 9680 AP184 AP191 1200 6500 2.0 in Granite 30.2 Bridge Foundation Estimated Pile Length Main Line: Main Line 40m span T Beams 30m Span U12-Beam
Main Line Special Crossing Cast In-situ Box Girder (60m+100m+60m) Ramp 30m span Voided Deck 30m Span U12-Beam
PROPOSED ACQUISITION OF JBTN HUTAN DAERAH , SELANGOR PEJABAT & QUARTERS JBTN HUTAN JBTN. HUTAN OFFICE & QUARTERS EXISTING ROAD TO BKT SEGAR PROP. NEW ROAD TO BKT SEGAR Proposed affected forestry assets to be acquire due to: the existing access road will not have sufficient clearance height to occomadate new ramp by SUKE, The proposes new road will utilise acquired forest.
CONSTRUCTION OF HIGH MAIN LINE &RAMPS PEJABAT & QUARTERS JBTN HUTAN HIGH MAIN LINE SPANING OVER CHERAS KAJANG HIGHWAY CONSTRUCTION OF HIGH MAIN LINE &RAMPS PEJABAT & QUARTERS JBTN HUTAN MRT To Sg Besi To Ulu Kelang CHAINAGE CH.9600 CH.11000 PACKAGE A6 LOCATION FOREST RESERVE LEAD CONSULTANT & PRELIMINARY DESIGN CONSULTANT SEPAKAT SETIA PERUNDING (SDN) BHD DETAILED DESIGN CONSULTANT AMIN & TEHSDN BHD Package A6 Layout Plan Package A6 Mainline Profile Forest Area Join to Section B To Sg Besi To Ulu Kelang Package Alignment Chainage Superstruc ture Type Span Configuration Substructure Type