BSNL GU CG Project
BSS - Plan
Prepared by :
Vivek D Ghate

Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorWhite
Text(2-5 Level)
TypeArial
Size24-18pt
ColorWhite
Internal Only
Index

Introduction

Equipment and Location Details

Current Project Status

Project plan

Proposed Network Diagram

Required Solution for SWAP

Manpower and Outsource Team Status



Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Project Background
The Tender is a turnkey implementation for 0.2ML of the 2G/3G
network in the CG comprising of

(a)Planning, financing, engineering, supply, installation, testing,
commissioning and annual maintenance of GSM UMTS based
cellular network together with 3GPP R8 Core, IN, VAS, Radio
and

(b)The supply, installation, testing and commissioning of
infrastructure and associated items for Core/Radio sites.
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Equipment Details
Sl No Node Location Configuration Capacity
1 BSC Raipur TYPE II 1600 TRX
4 RNC Raipur TYPE II 220 Node B
6 OMCR Raipur TYPE I 3000Cells / 7500TRX
Sl No Description Equipment Model Radio Type Qty
1 Node-B [1/1/1]-Indoor BS8800A S1/1/1 1*RSU82+1*RSU40 70
2 Node-B [1/1/1]-Outdoor BS8900A S1/1/1 1*RSU82+1*RSU40 21
4 BTS-Indoor-4/4/4 BS8800 4/4/4 1*RSU82+1*RSU60E 70
5 BTS-Outdoor-4/4/4 BS8900A 4/4/4 1*RSU82+1*RSU60E 21
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Current Project Status
Sl No Activity Status Remarks
1 BSC/RNC Site Visit and Site Survey Done Approval Pending
2 Submission of power requirement (AC, DC) Done
3 Product Documentation Submission Done
4 RAN HLD Submission Done
5 Existing Core and SGSN Data Collection Done
6 SPC for ZTE BSC and RNC Done Approval Pending
7 RAN DLD preparation WIP Drafted, waiting for IP Plan
8 Verification of packing list
WIP

9 Spare Parts for RAN requirement Done Approval Pending
10 Training of BTS Node B WIP Engineer busy on RFI
11 Requirement for Local Purchase for BSC/RNC Commissioning Done
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Project Rollout Plan
iBSC
iBSC SITE ROLL OUT Schedule (WBS) 50 days
1
Telecom Installation Works 15 days

1.1 iBSC Indoor Installation 10 days
1.2 Physical Debugging of iBSC 5 days
2 Commissioning of iBSC 8 days
2.1 Software Configuration 5 days
2.2 Software Debugging 3 days
3 Integration and Pre AT 10 days
4 Final Acceptance Test 10 days
RNC
RNC SITE ROLL OUT Schedule (WBS) 50 days
1
Telecom Installation Works 15days

1.1 RNC Indoor Installation 10 days
1.2 Physical Debugging of RNC 5 days
2 Commissioning of RNC 8 days
2.1 Software Configuration 5 days
2.2 Software Debugging 3 days
3 Integration and Pre AT 10 days
4 Final Acceptance Test 12 days
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Project Rollout Plan Ctd
BTS
NodeB
SITE ROLL OUT Schedule for GBT sites 7 days
1 BTS Indoor Installation 1 days
2 BTS Outdoor Installation 1 days
3 Commissioning 1 day
4 ACCEPTANCE TEST 1days
SITE ROLL OUT Schedule for GBT sites 7 days
1 Node B Indoor Installation 1 days
2 Node B Outdoor Installation 1days
3 Commissioning 1 day
4 ACCEPTANCE TEST 1days
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Proposed Connectivity Diagram
Note:

This Diagram will change

once our core elements

are live
MPLS/ Transmission
Network
BSC RNC
LSW TYPE II
RAIPUR, CHATTISSGARH
OMC- R
1
*G
E
e
le
c
6
*
G
E
e
le
c
6
*
G
E
e
l e
c
TYPE 2 TYPE 2
LSW TYPE II
MGW (ALU)
1*GE elec
SGSN
CAT-B
6*GE elec
OMC- S
1
*G
E
e
le
c
ZTE
GGSN,
Pune
10G
E
1
0
G
E
4
*
G
E
o
p
tic
a
l
4
*G
E
o
p
tic
a
l
4
*
G
E
o
p
tic
a
l
4
*
G
E
o
p
tic
a
l
6
*G
E
e
le
c
6
*
G
E
e
le
c
1
*
G
E
e
le
c
1*GE elec
1
*G
E
e
le
c
6*G
E elec
8*GE elec
2*XGE
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Required Solution for SWAP
Sr No Pendency Detail
1 Required Transmission details for NodeB/BTS Integration from TX Team.
2 IP RAN detail plan from IP Team.
Theme1
Theme2
Theme3
Theme4
Title:
Type: Arial Bold
Size32pt
ColorThe theme
blue
Subtitle:
TypeArial
Size28pt
ColorBlack
Text(2-5 Level)
TypeArial
Size24-18pt
ColorBlack
Internal Only
Manpower and Outsource Team Status
Present Manpower Status Manpower Requirement
Sl No Name Desig Sl No Profile Req From
1 Mohammad Aslam Sr. Engineer 1 RNC Engineer Last July
3 Ritesh Jha BTS Engineer 3 OMCR Engineer July 20
4 Chirag Kashyap Cluster Lead 4 OMCR Engineer Required
5 Amit Ranjan BTS Enginineer
6 Nisha Kumari OMCR Engineer
Present Outsource Status Outsource Team Requirement
Sl No Team Profile Nos Sl No Team Profile Req From
1 Ritesh Kumar NA 1 BSC Installation Team
Aug mfirst week

2 Chirag Kashyap NA 2 RNC Installation Team Aug first week
3 Amit Ranjan NA
4 Nisha Kumari NA