BSNL GU CG Project BSS - Plan Prepared by : vivek d ghate. Tender is a turnkey implementation for 0.2ML of the 2G / 3G network in the CG comprising of (a)Planning, financing, engineering, supply, installation, testing, commissioning and annual maintenance of GSM UMTS based cellular network together with 3GPP R8 Core, IN, VAS, Radio and (b)The supply, installation
BSNL GU CG Project BSS - Plan Prepared by : vivek d ghate. Tender is a turnkey implementation for 0.2ML of the 2G / 3G network in the CG comprising of (a)Planning, financing, engineering, supply, installation, testing, commissioning and annual maintenance of GSM UMTS based cellular network together with 3GPP R8 Core, IN, VAS, Radio and (b)The supply, installation
BSNL GU CG Project BSS - Plan Prepared by : vivek d ghate. Tender is a turnkey implementation for 0.2ML of the 2G / 3G network in the CG comprising of (a)Planning, financing, engineering, supply, installation, testing, commissioning and annual maintenance of GSM UMTS based cellular network together with 3GPP R8 Core, IN, VAS, Radio and (b)The supply, installation
Size35-47pt ColorTheme of Blue Subtitle: TypeArial Color24-28pt ColorWhite Internal Only BSNL GU CG Project BSS - Plan Prepared by : Vivek D Ghate
Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorWhite Text(2-5 Level) TypeArial Size24-18pt ColorWhite Internal Only Index
Introduction
Equipment and Location Details
Current Project Status
Project plan
Proposed Network Diagram
Required Solution for SWAP
Manpower and Outsource Team Status
Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Project Background The Tender is a turnkey implementation for 0.2ML of the 2G/3G network in the CG comprising of
(a)Planning, financing, engineering, supply, installation, testing, commissioning and annual maintenance of GSM UMTS based cellular network together with 3GPP R8 Core, IN, VAS, Radio and
(b)The supply, installation, testing and commissioning of infrastructure and associated items for Core/Radio sites. Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Equipment Details Sl No Node Location Configuration Capacity 1 BSC Raipur TYPE II 1600 TRX 4 RNC Raipur TYPE II 220 Node B 6 OMCR Raipur TYPE I 3000Cells / 7500TRX Sl No Description Equipment Model Radio Type Qty 1 Node-B [1/1/1]-Indoor BS8800A S1/1/1 1*RSU82+1*RSU40 70 2 Node-B [1/1/1]-Outdoor BS8900A S1/1/1 1*RSU82+1*RSU40 21 4 BTS-Indoor-4/4/4 BS8800 4/4/4 1*RSU82+1*RSU60E 70 5 BTS-Outdoor-4/4/4 BS8900A 4/4/4 1*RSU82+1*RSU60E 21 Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Current Project Status Sl No Activity Status Remarks 1 BSC/RNC Site Visit and Site Survey Done Approval Pending 2 Submission of power requirement (AC, DC) Done 3 Product Documentation Submission Done 4 RAN HLD Submission Done 5 Existing Core and SGSN Data Collection Done 6 SPC for ZTE BSC and RNC Done Approval Pending 7 RAN DLD preparation WIP Drafted, waiting for IP Plan 8 Verification of packing list WIP
9 Spare Parts for RAN requirement Done Approval Pending 10 Training of BTS Node B WIP Engineer busy on RFI 11 Requirement for Local Purchase for BSC/RNC Commissioning Done Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Project Rollout Plan iBSC iBSC SITE ROLL OUT Schedule (WBS) 50 days 1 Telecom Installation Works 15 days
1.1 iBSC Indoor Installation 10 days 1.2 Physical Debugging of iBSC 5 days 2 Commissioning of iBSC 8 days 2.1 Software Configuration 5 days 2.2 Software Debugging 3 days 3 Integration and Pre AT 10 days 4 Final Acceptance Test 10 days RNC RNC SITE ROLL OUT Schedule (WBS) 50 days 1 Telecom Installation Works 15days
1.1 RNC Indoor Installation 10 days 1.2 Physical Debugging of RNC 5 days 2 Commissioning of RNC 8 days 2.1 Software Configuration 5 days 2.2 Software Debugging 3 days 3 Integration and Pre AT 10 days 4 Final Acceptance Test 12 days Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Project Rollout Plan Ctd BTS NodeB SITE ROLL OUT Schedule for GBT sites 7 days 1 BTS Indoor Installation 1 days 2 BTS Outdoor Installation 1 days 3 Commissioning 1 day 4 ACCEPTANCE TEST 1days SITE ROLL OUT Schedule for GBT sites 7 days 1 Node B Indoor Installation 1 days 2 Node B Outdoor Installation 1days 3 Commissioning 1 day 4 ACCEPTANCE TEST 1days Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Proposed Connectivity Diagram Note:
This Diagram will change
once our core elements
are live MPLS/ Transmission Network BSC RNC LSW TYPE II RAIPUR, CHATTISSGARH OMC- R 1 *G E e le c 6 * G E e le c 6 * G E e l e c TYPE 2 TYPE 2 LSW TYPE II MGW (ALU) 1*GE elec SGSN CAT-B 6*GE elec OMC- S 1 *G E e le c ZTE GGSN, Pune 10G E 1 0 G E 4 * G E o p tic a l 4 *G E o p tic a l 4 * G E o p tic a l 4 * G E o p tic a l 6 *G E e le c 6 * G E e le c 1 * G E e le c 1*GE elec 1 *G E e le c 6*G E elec 8*GE elec 2*XGE Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Required Solution for SWAP Sr No Pendency Detail 1 Required Transmission details for NodeB/BTS Integration from TX Team. 2 IP RAN detail plan from IP Team. Theme1 Theme2 Theme3 Theme4 Title: Type: Arial Bold Size32pt ColorThe theme blue Subtitle: TypeArial Size28pt ColorBlack Text(2-5 Level) TypeArial Size24-18pt ColorBlack Internal Only Manpower and Outsource Team Status Present Manpower Status Manpower Requirement Sl No Name Desig Sl No Profile Req From 1 Mohammad Aslam Sr. Engineer 1 RNC Engineer Last July 3 Ritesh Jha BTS Engineer 3 OMCR Engineer July 20 4 Chirag Kashyap Cluster Lead 4 OMCR Engineer Required 5 Amit Ranjan BTS Enginineer 6 Nisha Kumari OMCR Engineer Present Outsource Status Outsource Team Requirement Sl No Team Profile Nos Sl No Team Profile Req From 1 Ritesh Kumar NA 1 BSC Installation Team Aug mfirst week
2 Chirag Kashyap NA 2 RNC Installation Team Aug first week 3 Amit Ranjan NA 4 Nisha Kumari NA Internal Only