RTWP Issue Resolution

MH Circle

Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Possible reasons of High UL RSSI
Internal Causes
RBS Internal Interference
Faulty or loose components Cable, connectors and/or diplexers
Faulty Antenna/TMA/ASC
Incorrect parameter settings
Incorrect installation
Traffic load
External Causes
GSM Cross Band Interference
High sites
External interference

UL RSSI (RTWP) Possible Reasons
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

In House Checks
Following Activity Should Done For Maintain High RTWP Cell
Check all RF Parameter
Check NBRs are defined properly (both 3G-3G and 3G-2G)
Check SC Collision
Check Propagation Delay Report for checking overshooting .
Check Interference
Check Site configuration
Give the soft reset
Scratch Site and recreate
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Checks During Field Visit
If We not found any improvement after In House activities , the following activities are done
during the field visit :

Check the Az, Tilts are as per the design.
See possibility of optimization from Az and Tilt point of view.
Check if we are using Dual Band Antenna common for GSM and UMTS. Then possibility of
intermodulation can be worked out.
Check Parameter Setting is as per the cable length.
Check all the connector ,feeder cable and Jumper cable with site master .
Conduct the Sweep test for the lines.
Check main and diversity connection .
Swap the Problematic sector to any other sector for check problem shift or not.
a) Cable Swap
b) RU Swap
c) FU Swap

Check the clutter like any reflecting body or any interference point (e.g. glass building ,water body
,big hording board , railway line , etc.). If found reorient antenna .
Check repeater near by site .

If nothing is found in the above exercise, the do the spectrum drive test to know the interference
point and interference direction from any external source.

Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Site Fixed in Past
PUNE 32 X
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Note : We see that when RTWP improves , Call Drop decreases .
PUNE32X Pre-Post Data
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Following Activity Done at PUNE32X For Maintain RTWP

1.Check all RF Parameter
2.Check SC Collision
3.Check Site configuration
4. Scratch Site and recreated
5.Check Propagation Delay Report for checking overshooting .

We not found any improvement after Done this activity So we Go for field visit .
Following activity done at field

1.Check all the connector ,feeder cable and Jumper cable .
2.Swap PUNE32X with PUNE32Y ,Now problem sift to PUNE32Y.
3. So we again check cables of PUNE32X with Site Master , Nothing was found .
4.Check the clutter and found that one metal hoarding board is in front of PUNE32X.
5.So ,We reorient PUNE32X for 10 -15 Degree .

Finally after Reorientation RTWP is back to normal.

Activity Done at PUNE32
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

CULPRIT CELLS
The list of culprit cells is attached herewith.
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RTWP Cluster Snap Shot
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RGOA101 RTWP CELLS-Same Cluster
Most of the GOA cells are shooting towards water body. Reorientation during field visit
Can be checked.
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RNSK101 RTWP CELLS-Same Cluster
Since most of the sites are in same cluster.
Worst Site DULE18 and DULE01 can be taken first.
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RNSK101 RTWP CELLS-Same Cluster
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RPUN102 RTWP CELLS-Same Cluster
Since most of the sites are in same cluster.
Worst Site PUN109 and PUN415 can be taken first.
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

RPUN102 RTWP CELLS-Same Cluster
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Recommendations
IDEA team can prioritize the following Cells to begin with :
DULE 18
DULE 01
LATR 10
PUN415
PUN109
Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

Ways of Working
Field team should take all required equipment :
A) sweep tester
B) spectrum analyzer
C) DT team
D) Necessary tools for the optimization
FIELD team should inform MS SPOC at least one day in advance with regard to the plan
of visit.
Since this can be a time consuming effort, the Field team should plan to stay at one site /
cluster at least for a day and need to work in close consultation with MS RF SPOC.
With every Swap , RF team will monitor the stats at least for 1 hour to have the
conclusive results and plan the next recommendation.
MS SPOC for the activity is Mr Krishna Kant (9890370361) .
Please take pictures for Antennas, Cabinet, Clutter (360 Degree Panaromic) for future
reference and reporting purposes.
Share Logs/reports of Sweep tests for analysis.


Slide title
70 pt



CAPITALS









Slide subtitle
minimum 30 pt

You might also like