Chapter 6
Integer Linear Programming
MT 235 2
Integer Linear Programming
All-Integer Linear Program
All variables must be integers
Mixed-Integer Linear Program
Some, but not all variables must be integers
0-1 Integer Linear Program
Integer variables must be 0 or 1, also known as
binary variables
MT 235 3
Integer Programming All Integers
Northern Airlines is a small regional airline. Management is now
considering expanding the company by buying additional aircraft. One of
the main decisions is whether to buy large or small aircraft to use in the
expansion. The table below gives data on the large and small aircraft that
may be purchased.

As noted in the table, management does not want to buy more than 2 small
aircraft, while the number of large aircraft to be purchased is not limited.

How many aircraft of each type should be purchased in order to maximize
annual profit?
Small Large Capital Available
Annual profit $1 million $5 million
Purchase cost $5 million $50 million $100 million
Maximum purchase quantity 2 No maximum
MT 235 4
Define Variables - Northern Airlines
Let:
S = # of Small Aircraft
L = # of Large Aircraft
MT 235 5
General Form - Northern Airlines
Max
1S + 5L

s.t.
5S + 50L <= 100

S <= 2

S, L >= 0 & Integer
MT 235 6
Northern Airlines Graph Solution
0
0.5
1
1.5
2
2.5
0 0.5 1 1.5 2 2.5 3
S
L
Small AC
LP Relaxation
(2, 1.8)
Budget
MT 235 7
Northern Airlines Graph Solution
0
0.5
1
1.5
2
2.5
0 0.5 1 1.5 2 2.5 3
S
L
Small AC
Rounded
Solution
(2, 1)
Budget
MT 235 8
Northern Airlines Graph Solution
0
0.5
1
1.5
2
2.5
0 0.5 1 1.5 2 2.5 3
S
L
Budget
Small AC
Optimal
Solution
(0, 2)
MT 235 9
MT 235 10
MT 235 11
MT 235 12
MT 235 13
Integer Linear Programming
All-Integer Linear Program
All variables must be integers
Mixed-Integer Linear Program
Some, but not all variables must be integers
0-1 Integer Linear Program
Integer variables must be 0 or 1, also known as
binary variables
MT 235 14
Integer Programming Mixed Integer
Hart Manufacturing, a mixed integer production problem:

Hart Manufacturing makes three products. Each product goes through three manufacturing
departments, A, B, and C. The required production data are given in the table below. (All data are
for a monthly production schedule.)

Production Department Product 1 Product 2 Product 3 Hours available
A (hours/unit) 1.5 3 2 450
B (hours/unit) 2 1 2.5 350
C (hours/unit) 0.25 0.25 0.25 50
Profit Contributions per Unit $25 $28 $30
Setup Costs per production run $400 $550 $600
Max Production per production run (Units) 175 150 140
MT 235 15
General Form Hart Manu.
Let:
X
1
= units of product 1
X
2
= units of product 2
X
3
= units of product 3
Y
1
= 1 if production run, else = 0
Y
2
= 1 if production run, else = 0
Y
3
= 1 if production run, else = 0
MT 235 16
General Form Hart Manu.
Max
25X
1
+ 28X
2
+ 30X
3
400Y
1
550Y
2
600Y
3

s.t.
1.5X
1
+ 3X
2
+ 2X
3
<= 450 Dept. A
2X
1
+ X
2
+ 2.5X
3
<= 350 Dept. B
.25X + .25X + .25X <= 50 Dept. C
X
1
<= 175Y
1

X
2
<= 150Y
2

X
3
<= 140Y
3
X
i
>= 0
Y
i
= integer 0,1

MT 235 17
MT 235 18
MT 235 19
MT 235 20
MT 235 21
MT 235 22
Integer Linear Programming
All-Integer Linear Program
All variables must be integers
Mixed-Integer Linear Program
Some, but not all variables must be integers
0-1 Integer Linear Program
Integer variables must be 0 or 1, also known as
binary variables
MT 235 23
0-1 Integer Linear Program (Binary
Integer Programming)
Assists in selection process
1 corresponding to undertaking
0 corresponding to not undertaking
MT 235 24
0-1 Integer Linear Program (Binary
Integer Programming)
Allows for modeling flexibility through:
Multiple choice constraints
k out of n alternatives constraint
Mutually exclusive constraints
Conditional & co-requisite constraint
MT 235 25
Integer Programming - Binary
Integer Programming

CAPEX Inc. is a high technology company that faces some important capital budgeting decisions over the next four
years. The company must decide among four opportunities:

1. Funding of a major R&D project.
2. Acquisition of an existing company, R&D Inc.
3. Building a new plant, and
4. Launching a new product.

CAPEX does not have enough capital to fund all of these projects. The table below gives the net present value of each
item together with the schedule of outlays for each over the next four years. All values are in millions of dollars.


R&D Project
Acquisition of
R&D Inc. New Plant
Launch New
Product
Capital
Available
Net Present Value (NPV) 100 50 30 50
Year 1 10 30 5 10 40
Year 2 15 0 5 10 60
Year 3 15 0 5 10 80
Year 4 20 0 5 10 70
MT 235 26
General Form CAPEX Inc.
Let:
X
1
= 1 if R&D Project funded, else = 0
X
2
= 1 if acquire company, else = 0
X
3
= 1 if build new plant, else = 0
X
4
= 1 if launch new project, else = 0

MT 235 27
General Form CAPEX Inc
Max
100X
1
+ 50X
2
+ 30X
3
+ 50X
4

s.t.
10X
1
+ 30X
2
+ 5X
3
+ 10X
4
<= 40 Yr 1
15X
1
+ 0X
2
+ 5X
3
+ 10X
4
<= 60 Yr 2
15X
1
+ 0X
2
+ 5X
3
+ 10X
4
<= 80 Yr 3
20X
1
+ 0X
2
+ 5X
3
+ 10X
4
<= 70 Yr 4
X
i
= 0,1

MT 235 28
MT 235 29
MT 235 30
MT 235 31
MT 235 32
Review Problems
Electrical Utility
Distribution Co.
Alpha Airlines

MT 235 33
Integer Programming - Review
Electrical Utility, a mixed integer set-up problem:

A problem faced by an electrical utility each day is that of deciding which generators to start up
in order to minimize total cost. The utility in question has three generators with the
characteristics shown in the table below. There are two periods in a day, and the number of
megawatts needed in the first period is 2900. The second period requires 3900 megawatts. A
generator started in the first period may be used in the second period without incurring an
additional startup cost. All major generators (e.g. A, B, and C) are turned off at the end of the
day. (Assume all startups occur in time period 1.)

Generator Fixed Startup Cost
Cost Per Period Per
Megawatt Used
Maximum Capacity
In Each Period
(MW)
A $3,000 $5 2,100
B $2,000 $4 1,800
C $1,000 $7 3,000
MT 235 34
General Form Electrical Utility
Let:
X
A1
= Power from Gen A in Period 1
X
B1
= Power from Gen B in Period 1
X
C1
= Power from Gen C in Period 1
X
A2
= Power from Gen A in Period 2
X
B2
= Power from Gen B in Period 2
X
C2
= Power from Gen C in Period 2
Y
A
= 1 if Generator A started; else = 0
Y
B
= 1 if Generator A started; else = 0
Y
C
= 1 if Generator A started; else = 0


MT 235 35
General Form Electrical Utility
Min
5(X
A1
+X
A2
) + 4(X
B1
+X
B2
) + 7(X
C1
+X
C2
) + 3000Y
A
+ 2000Y
B
+ 1000Y
C

s.t.
X
A1
+ X
B1
+ X
C1
>= 2900
X
A2
+ X
B2
+ X
C2
>= 3900
X
A1
<= 2100Y
A

X
A2
<= 2100Y
A

X
B1
<= 1800Y
B

X
B2
<= 1800Y
B

X
C1
<= 3000Y
C

X
C2
<= 3000Y
C

X
ij
>= 0
Y
i
= 0, 1
MT 235 36
MT 235 37
MT 235 38
MT 235 39
MT 235 40
MT 235 41
Integer Programming - Review
Distribution Company, a integer transportation problem:

A distribution company wants to minimize the cost of transporting goods from its warehouses A, B, and C to
the retail outlets 1, 2, and 3. The costs (in $s) for transporting one unit from warehouse to retailer are given
in the following table.
The fixed cost of operating a warehouse is $500 for A, $750 for B, and $600 for C, and at least two of them
have to be open. The warehouses can be assumed to have adequate storage capacity to store all units
demanded, ie., assume each warehouse can store 525 units.
Retailer
Warehouse 1 2 3
A $15 $32 $21
B $9 $7 $6
C $11 $18 $5
Demand 200 150 175
MT 235 42
General Form Distribution Co.
Let:
X
ij
= units shipped from i to j
Y
A
= 1 if warehouse A opens, else = 0
Y
B
= 1 if warehouse B opens, else = 0
Y
C
= 1 if warehouse C opens, else = 0


MT 235 43
General Form Distribution Co.
Min
500Y
A
+ 750Y
B
+ 600Y
C
+ 15X
A1
+ 32X
A2
+ 21X
A3
+ 9X
B1
+ 7X
B2
+ 6X
B3
+ 11X
C1

+ 18X
C2
+ 5X
C3

s.t.
X
A1
+ X
B1
+ X
C1
= 200
X
A2
+ X
B2
+ X
C2
= 150
X
A3
+ X
B3
+ X
C3
= 175
X
A1
+ X
B1
+ X
C1
<= 525Y
A

X
A2
+ X
B2
+ X
C2
<= 525Y
B

X
A3
+ X
B3
+ X
C3
<= 525Y
C

Y
A
+ Y
B
+ Y
C
>= 2

X
ij
>= 0

Y
i
= 0, 1

MT 235 44
MT 235 45
MT 235 46
MT 235 47
MT 235 48
Integer Programming - Review
Alpha Airlines, a integer scheduling problem:

Alpha Airlines wishes to schedule no more than one flight out of Chicago to each of the following cities:
Columbus, Denver, Los Angeles, and New York. The available departure slots are 8 A.M., 10 A.M., and
12 noon. Alpha leases the airplanes at the cost of $5000 before and including 10 A.M. and $3000 after 10
A.M., and is able to lease at most two per departure slot. Also, if a flight leaves for New York in a time
slot, there must be a flight leaving for Los Angeles in the same time slot. The expected profit contribution
before rental costs per flight is shown below (in K$)
Time Slot
Cities
8:00 AM 10:00 AM 12:00 Noon
Columbus 10 6 6
Denver 9 10 9
Los Angeles 14 11 10
New York 18 15 10
MT 235 49
General Form Alpha Airlines
Let:
X
ij
= 1 if flight to i occurs in time slot j, else = 0
Y
j
= number of planes leased for time slot j

MT 235 50
General Form Alpha Airlines
Max
10X
C1
+ 6X
C2
+ 6X
C3
+ 9X
D1
+ 10X
D2
+ 9X
D3
+ 14X
L1
+ 11X
L2
+ 10X
L3
+ 18X
N1
+ 15X
N2
+
10X
N3
5Y
1
5Y
2
3Y
3

s.t.


X
C1
+ X
C2
+ X
C3
<= 1
X
D1
+ X
D2
+ X
D3
<= 1
X
L1
+ X
L2
+ X
L3
<= 1
X
N1
+ X
N2
+ X
N3
<= 1
X
C1
+ X
D1
+ X
L1
+ X
N1
= Y
1

X
C2
+ X
D2
+ X
L2
+ X
N2
= Y
2
X
C3
+ X
D3
+ X
L3
+ X
N3
= Y
3
Y
1
<= 2
Y
2
<= 2
Y
3
<= 2
X
N1
<= X
L1
X
N2
<= X
L2
X
N3
<= X
L3
X
ij
= 0,1
Y
j
= INTEGER





MT 235 51
MT 235 52
MT 235 53
MT 235 54