You are on page 1of 64

External Alarm Supervision System

(EASS)
Contents
Phase 1 Out door EASS installation
Phase 1 Indoor EASS installation (GSU & GSUR)
Phase 2 MISU installation and trouble shooting
Software Installation steps of GSU & GSUR
Software Installation steps of MISU

EASS Module Used In CMPak Project
ZXM10 GSU-R in Phase-0 sites installed
ZXM10 GSU in Phase-1 sites installed
MISU in Phase-2 sites for indoor / out door

EASS installation GUID
for Phase 1 Outdoor site
Out door Alarm List
There are 08 external alarms in Phase 1 out-door site. Which are
Water Alarm
Low Battery Alarm
AC Main Failure
Ac Phase lost
Door Alarm
DG In Operation
Low Fuel Tank
SMR Module Alarm

BTS
DC
POWER
FUEL
TANK
DG
ATS
DG
OPRATION
SDH/PDH
OMCR
Power
cable
SDHPDH
IBSC\BSC
SITE
Water Alarm
Rectifier Relay out:
1door
2AC main failure
3DG Fail to start
4low battery
5SMR module alarm
Network for CMPak Phase 1 out door site
AC Failure
Open
DDF
Alarm Position On BTS
Top of data TRAB1
BTS Cable lable color
white
blue
white
orange
white
green
white
brown
red
Top of data TRAB1
blue
red
orange
red
green
red
brown
black
green
black
orange
OMC code
3861
EASS alarm
Water alarm
3862 Low battery alarm
3863 Mains failure
3864 AC phase lost
3865 Door alarm
3866 ATS (DG in operation)
3867 Low fuel tank
3868 SMR module faulty
3869
3870
Cable Color code on DDF
Rectifier Relay
1 2 3

12-- NO

23--NC
Rectifier Alarm Relays
Rectifier Alarm Port
Rectifier X23(2,3)---Water sensor


Power for water sensor
Rectifier X16(2,3) ---DG Fail to Start
Rectifier X17(2,3) ---SMR faulty
Rectifier X18(2,3) ---AC phase lost
Rectifier X19(2,3)---Low battery alarm
Rectifier X20(2,3) ---Door alarm
Water sensor installation
Water sensor
Water Sensor Connection
Water sensor
Set Rectifier Parameter
1Set relay out
Main SW off
AC Power off
SMR alarm
AC phase lost
Low battery
Door alarm
Intrusion alarm
2The other alarm
A1
A1
A2
A3
A4
A5
A5
0
Rectifier Parameter Setting
CSU
Step 1 (pass:0000)
Step 2 Step 3
Rectifier Parameter Setting
Step 4
Step 5
Step 6
Step 7
NOTE: A1 and A2 can not assigned to other relay
Fuel Sensor
Arrow Direction: UP
ATS NC 21 & 22
DG Operation
Out door Alarm List
Water Alarm
Low Battery Alarm
DG Fail to Start
AC Main Failure (Will be explained in coming slide)
Door Alarm
DG In Operation
Low Fuel Tank
SMR Module Alarm

EASS installation GUID
for Phase 1 Indoor Site
External Alarm system
In Phase 1:
Indoor Door site: 4 Alarms are passing through GSU and 6 alarms are directly
connected to BTS alarm port.

Alarm Passing through GSU
1. Temperature Alarm
2. Smoke Alarm
3. Air Condition Alarm
4. Low Battery


Alarm connected Directly to BTS alarm port
1. DG Operation
2. Low Fuel
3. DG Fail to start
4. SMR Alarm
5. Door Alarm
6. Main Supply Failure

c
smoking
door
AIR AIR
DC
POWER
FUEL
TANK
DG
ATS DG
OPRATION
GSU
SDH/PDH
IBSC\BSC OMCR
Power
cable
APD
AC
PHASE A
AC
PHASE B
AC
PHASE C
SITE
DG
GSU
SDH/PDH
Temperature
DC POWER Relay out
1AC main failure
2SMR module alarm

Network for CMPak phase 1 indoor new BTS site
Set sensor on 30
V- Voltage Cable
T- Signal Cable
GSUR- Upper Plug X35
MISU- XJ1UP AI1
Temperature Alarm
1
2
3
4
Pin 1 & 2: Connecting to BTS/MISU
Pin 3 & 4: 24V & Signal cable from GSU
Smoke Alarm
Cable connecting to BTS
/MISU
Door sensor
Door Alarm
Rectifier in CMPak Project
ZXDU 58/68 (V3 sites)
ZXDU 300 (V2 sites)
Having two alarms with different port position:
SMR Alarm
DG Fail to Start
Parameter Setting of CSU is also change.


DG Fail to Start Alarm
Rectifier: X24, Pin 13 & 14
ZXDU 58/68 Rectifier (DG Fail to Start Alarm)
SMR Alarm
Rectifier X21, Pin 1 & 2
ZXDU 58/68 Rectifier (SMR Alarm)
CSU
Step 1 (pass:0000)
Step 2
Step 3
ZXDU 58/68 Rectifier (Parameter Setting)
Step 4
Step 5
Step 6
Step 7
NOTE: A1 and A2 can not assigned to other relay
ZXDU 58/68 Rectifier (Parameter Setting)
ZXDU 300 Rectifier
DG Fail to start
NC 2
SMR Alarm
NC 3
Step 1: Input Password
Step 2: Set Parameter
Step3: Alarm Class
Set: SMR SW Broken
ZXDU 300 Rectifier
Step4: Set SMR alarm
Step5: Set AC Power off
Step6: Arrester Fail
ZXDU 300 Rectifier
Alarm Sensor not working
Relay setting

From APD:
AC Phase lost Alarm
Air Condition Alarm
APD Connection

Pin 31, 32 & 33
Red, Green & Gray
Provide 12V to DDF 3
Pin 34,35 & 36
Red, Green & Gray
AC Phase lost (No use)
Pin 37 & 38
Red & Green
Air condition Alarm

APD Connection
EASS installation GUID
for Phase 0 Indoor Site
External Alarm system
In Phase 0:
Indoor Door site: 3 Alarms are passing from CSU and 6 alarms are directly
connected to GSU.
CSU alarms are:
1. Main Failure
2. SMR
3. Low Battery


Alarm connected Directly to GSU
1. DG Operation
2. Low Fuel
3. DG Fail to start
4. Temperature alarm
5. Door Alarm
6. Air condition alarm
7. Smoke alarm

Monitoring module not communicating
In Phase 0:
3 alarms are passing from CSU
DG Fail to Start, SMR, Low Battery

c
smoking
door
Temperature
AIR AIR DC
POWER
FUEL
TANK
DG
ATS DG
OPRATION
GSUR
SDH/PDH
IBSC\BSC
OMCR
Power
cable
DC POWER Relay out
1AC main failure; 2SMR alarm ;3low battery; 4AC phase lost
Network for CMPak phase 0 indoor old BTS site
Indoor Sites Alarms List
High Temperature Alarm
Low Battery Alarm
DG Fail to Start
Main Failure
Door Alarm
Air Condition Alarm
Smoke Alarm
SMR Module Alarm
DG In Operation
Low Fuel Tank
Stuck Alarm Analysis

GSU 4 alarms
6 alarms
From sensor
8 alarms
From DDF
BTS
10 Alarms
IN DOOR
8 Alarms (OUT DOOR)
Alarms going to CMB port
DB 25
DB 25 Connector
DB 25
All alarm cable connected to DB 25
DB 25 connected to BTS ALARM PORT
Side A Pin Color Label
Side
B Pin

DB25
pins(1PCS
1 white
Temperature Alarm Temperature sensor to BTS 3core
1
2 blue 3
3 white
DG Fail to Start Rectifier X24 to BTS
3core
1
4 orange 3
5 white
Door Alarm Door sensor to BTS
3core
1
6 green 3
7 white
Smoke Alarm Smoke sensor to BTS
3core
1
8 brown 3
9 red
DG in operation ATS to BTS
3core
1
10 blue 3
11 red
Low fuel Alarm Fuel sensor to BTS
3core
1
12 orange 3
17 red
Low Battery GSU XJ3(Up) to BTS
3core
1
18 green 3
19 red
Main Failure GSU XJ2(Down) to BTS
3core
1
20 brown 3
21 black
Air-condition faulty GSU XJ3(Down) to BTS
3core
1
22 blue 3
23 black
SMR Module faulty Rectifier X21 to BTS
3core
1
24 orange 3
NOTE13-14-15-16-25 are Free
Alarms Color code in DB25 (Phase 1)
Side A Pin Color Alarm name
NCO DO COM Jack Pin
DB25
pins(1PCS
1 white
Temperature Alarm NC DO1 COM X31
2
2 blue 3
3 white
DG Fail to Start NC DO2 COM X29
2
4 orange 3
5 white
Door Alarm NC DO3 COM X28
2
6 green 3
7 white
Smoke Alarm NO DO4 COM X30
1
8 brown 2
9 red
DG in operation NC DO5 COM X24
2
10 blue 3
11 red
Low fuel Alarm NC DO6 COM X25
2
12 orange 3
17 black
Low Battery NO DO7 COM X26
1
18 blue 2
19 black
Main Failure NO DO8 COM X27
1
20 orange 2
21 black
Air-condition faulty NO DO9 COM X20
1
22 green 2
23 black
SMR Module faulty NC DO10 COM X17
2
24 brown 3
Alarm Port Color code for GSUR (Phase 0)

DB 25 Connector
Plug out DB 25 from BTS Alarm port
Alarm status change by short 2 ports
If voltage less than 2V, alarm not working

Pin Alarm name BSC Config Alarm Status Voltages
1
Temperature Alarm 1 Alarm 3.28V
2
3
DG Fail to Start 1 Alarm 3.28V
4
5
Door Alarm 1 Alarm 3.28V
6
7
Smoke Alarm 0 Normal 3.28V
8
9
DG in operation 1 Alarm 3.28V
10
11
Low fuel Alarm 1 Alarm 3.28V
12
17
Low Battery 0 Normal 3.28V
18
19
Main Failure 0 Normal 3.28V
20
21
Air-condition faulty 0 Normal 3.28V
22
23
SMR Module faulty 1 Alarm 3.28V
24
Verifying Alarm from BTS Port
Pin Alarm name BSC Config Before short pin
1
Temperature Alarm 1 Alarm
2
3
DG Fail to Start 1 Alarm
4
5
Door Alarm 1 Alarm
6
7
Smoke Alarm 0 Normal
8
9
DG in operation 1 Alarm
10
11
Low fuel Alarm 1 Alarm
12
17
Low Battery 0 Normal
18
19
Main Failure 0 Normal
20
21
Air-condition faulty 0 Normal
22
23
SMR Module faulty 1 Alarm
24
After Short Pin
Normal
Alarm
Alarm
Alarm
Alarm
Alarm
Alarm
Normal
Normal
Normal
Troubleshooting
Phase 1:
Check relay setting
Check voltage in sensor (12V/24V)
Cable should be installed according to described installation material.
Check for cable damage with Multimeter
Check jumper setting
Cable Patched / connected properly
Check cable position in DB25 connector
Check Voltage in DB25 Connector
EASS installation GUID
for Phase 2 MISU Module
External Alarm system
In Phase 2:
MISU is installed on Indoor and outdoor.
All rectifier alarm are passing from CSU to MISU.
Rectifier Alarms are
1. Main Supply Failure
2. SMR
3. Rectifier Door Alarm
4. Low Battery
5. DG Fail to start
Passing all information which CSU
has

Alarm connected Directly to MISU
1. DG Operation
2. Low Fuel
3. Commercial power Failure
4. Smoke Alarm
5. Water Alarm
6. Temperature Alarm
Common Phase 2 Alarm Issue
April Major Task
1. Alarm system communication break
2. Monitoring module not communicating
3. Alarm sensor not working
4. Alarm cable broken
1: Alarm system communication break
a) Configuration Issue between BSC and EASS server
b) Wrong cable (color code) is patched
c) DIP switches Issues
d) E1 cable faulty
e) Ohm converter faulty
f) EASS hardware faulty

1: Alarm system communication break
a) Configuration Issue between BSC and EASS server
Sites cut over from one BSC to other
On solar sites MISU swapped with GSU
b) Wrong cable (color code) patched






Green white ---- F-IN +
Blue ---- F-IN
Orange ---- F-OUT +
White Orange ---- F-OUT
1: Alarm system communication break
DIP switches Issues
Should be set according to provided manual





Ohm converter faulty
EASS hardware faulty
Subcon should not decide about hardware faulty
Faulty hardware should be confirmed from ZTE person

2: Monitoring module not communicating
In Phase 2:
MISU Software corrupt
CSU & MISU TRx broken
CSU cable broken
CSU off
CSU faulty
Monitoring module not communicating
CSU generated alarm will not be working
MISU Software corrupt
RUN: Red Blink (Software working normally)
RUN: Green (Need to install software)
CSU & MISU TRx broken







Monitoring module not communicating
CSU & MISU TRx broken
CSU cable broken
Check voltage of Tx-GND & Rx-GND on both connector
Check continuity of cables




Generator alarms
Cable installed from ATS to EASS module
MISU:
DI 6: Commercial Power Failure
DI 7: DG operation
DI 8: Low Fuel Alarm
GSU:
DC 4: Commercial Power Failure
DC 6: DG operation
DC 7: Low Fuel Alarm

Generator alarms
Some times alarm pins not working
Can trace relay from magnetic contactor of DG & AC
Power with multimeter.
Can installed 220V relay for DG alarms
Generator alarms
ARAMUS ATS
Generator alarms
SDMO ATS
DG Operation relay
GSUR-GSU Software Installation Steps
GSUR Software Steps
1. Run ZXM10-GSU Software
2. Password: 567
3. Misc: VersionDownload software (.hex file)
4. Analog Input: Load Parameter (.Bin file)
5. Set type of AI (0-10) OK, Set type of AI(11-21) OK
6. AI Calibration: Load Parameter (.bin file), Read All AI, Set all KicB of all AI
7. Dry Contact: Load Parameter (.bin file) Set dry contact OK
8. Equipment: Load Parameter (.bin file), set Comm Para, Set Scan interval
9. Data Scan: Read data, Scan data
GSU Software Steps
1. Escape above step No. 6 & 8, Remaining step should be follow
2. Take care that downloading software will be different




1. Run ZXM10-MISU software
2. File: Password: 1111111 and Advance Password misu
3. Other Function: Get Misu version and download software (.hex file)
4. DO Channel Setting: Select Impulse and update all DO Channel
5. Read Data: Scan all data.
MISU current alarm status will be displaced on laptop
MISU Software Installation Steps
Expecting From U
Show your interest in EASS
Read EASS Manual
In PM, Check all alarms properly
Note Faulty alarms in provided sheet of EASS
Helping RTLs have information of all alarms of a site
Spare manager can know your EASS demand
Doing good job in daily smoke alarm & VIP sites alarms.
Similarly, Want to see good improvement in coming
weeks in active alarms.
Alarm should not be looped on site
END