You are on page 1of 36

RIGHT SIDE REGULATOR SPILL WAY

INDIRA SAGAR PROJECT


(POLAVARAM) (Head Works)
PUDIPALLI
POWER HOUSE
LEADING CHANNEL
TAIL RACE
CHANNEL

SADDLE DAM
DEVARA DONDI

RAMAIAH PETA

TUNNEL
SADDLE
DAM

PRPOSED TUNNEL 12M DIA


FREE FLOW 918 M LONG

REGULATOR

POLAVARAM
RIVER NAVIGATION
CANAL

SADDLE DAM
EXISTING OUT FALL
SLUICE OF
KADIAMMA DRAIN

PURUSHOTHA
PATNAM

REGULATOR
GOVERNMENT OF ANDHRA PRADESH
I & CAD DEPARTMENT

POLAVARAM PROJECT
INDEX MAP OF HEAD WORKS
AT RAMAIAHPETA SITE (G G D)
Design by D.Raj Kumar

INDIRA SAGAR PROJECT (POLAVARAM PROJECT)


(Utilisation : 301.00TMC, Irrigation : 7.21Lakh Acres, Power Generation : 960MW diversion to
Krishna river 80TMC, industrial and drinking water for Visakhapatnam town 23.44TMC Evaporation
losses 4.70TMC )

Right Main Canal (174.00 KM)

Head Works

Utilisation :89.54TMC

(Polavaram (V))

Ayacut : 3.21Lakh Acs.


No. of Packages : 7

Bids value (7 Pkgs.) : Rs. 1773.71


Crs.

Works awarded to all


packages.

Left Main Canal (181.50 KM)

Components :
Utilisation : 103.70TMC.
No. of packages

: 8 Nos.
Ayacut : 4.00Lakh Acs.

Awarded (packages): 7 Nos.


No. of Packages : 8

Bid value (7 Pkgs) : Rs. 1117.29


Crs.
Earth-cum-rock fill dam and Power
house with tail race channel.: Bids

invited on annuity basis and revised


under evaluation.

Works awarded to 7
Works for 8th Package rejected
and

recalled.

(162.409

to

181.50Km) : under finalisation


with evaluation committee
Bid value (8 Pkgs): Rs. 1583.54
Crs.

POLAVARAM PROJECT
1

PROJECT PROFILE : Location : 41 Km upstream SACB of river Godavari near


Ramaiahpet (V),
Polavaram (M), W.G Dist.

Administrative Sanction

: G. O. Ms. No. 96, I & CAD, Dt: 10-092004 for Rs. 1353.00 Crores
G. O. Ms. No. 129, I & CAD, Dt: 6-112004 for Rs. 1084.82 Crores
G. O. Ms. No. 74, I & CAD, Dt: 27-7-04
for Rs. 1320.00 Crores

No. of EPC Packages

: 22 Nos

Agreement value of 22 packages

: Rs.4474.35 Crs.

Budget provision for


2006-07

: Rs.675 Crs.

Expenditure of the project


2004 05 : Rs. 276.09 Crs.
2005 06 : Rs. 340.43 Crs.

Ayacut

Cum. Exp.

: Rs. 616.52 Crs

New ayacut

: 7,21,000 acres

Utilisation
To draw water
Left Main Canal

Right Main Canal

: 301 TMC
: 127.14 TMC (irrigation= 103.70 TMC)
(water supply to vizag = 23.44 TMC)
4.00 Lakh Acres
: 174.24 TMC (irrigation= 89.54 TMC)
(Krishna basin (inc. Evap. Loses) =

84.70 TMC)

Power Generation
FRL
Gross Storage
Discharge
Land Acquisition
Required

:
:
:
:

3.20 Lakh Acres


960 MW ( 12 x 80MW)
45.72m (150)
194.60 TMC
17500 cusecs (LMC & RMC each)
: 24840 acres

Requisitioned

: 9365 acres

Acquired

: 6381 acres

10

Estimated cost of L.A.

: Rs. 870 Crs.

11

Estimate cost of R & R

: Rs.3466.83 Crs.

12 Forest Clearance

Total extent involved

: 3,223 Ha./7961 acres

Under
submergence

Under head
works

Under canals

Total

2929.27 Ha.

181.36 Ha.

111.72 Ha.

3222.35 Ha.

dereservation proposals sent to PCCF

: 2/2005

Compensatory afforestation identified in

Vishakapatnam

: 1052 Ha./2590 acres

East Godavari Dist.

: 2915 Ha/7200 acres

13 Status of R & R

Scope of work
276 Villages are designated as affected Villages under fore shore of Indira Sagar
Project
ANDHRA PRADESH
District
No. of Villages
Affected

14

Population
(PAP

Families
(PAF)

E.G

42

11,476

2866

W.G

29

8,081

2,102

Khammam

205

97,477

22,830

TOTAL

276

1,17,034

27,798

Paid

Recovered

Mob. Advance ( Rs. in Crores)

2004-05 : 197.47

--

2005-06 : 103.64

9.88

Total : 301.11

9.88

PKG-8

Km
26.00

Km 17.545

Km 24.555

Km 17.30

Km 25.00

Km 26.409

Km 19.091

KM 162.409

KM 181.50

PKG-7

KM 136.00

PKG-6

KM 111.00

PKG-5

KM 93.70

PKG-4

KM 69.145

PKG-3

KM 25.60

Km 25.60

PKG-2

KM 51.60

PKG-1

KM 0.00

POLAVARAM BARRAGE

INDIRA SAGAR PROJECT LEFT MAIN CANAL

CATEGORY-I
PKG
No.

Description
Excavation of Main Canal, Lining
and construction of CM & CD
works including investigation,
design of :

Awarded

Bid Amount
Rs. in Crs.

Expenditure up to 3/2006
Rs. In Crs.)
Mobi.
Adv.

Works

Total

Km. 0.00 to Km. 25.60

M/s Progressive
Constructions Ltd (JV)

254.88

23.31

28.29

51.60

Km. 25.60 to Km 51.60

M/s Patel Soma (JV)

242.54

14.82

16.79

31.61

Km. 51.6 to Km 69.145

M/s Maytas-NCC (JV)

212.94

10.65

1.75

12.40

Km. 69.145 to Km 93.70

M/s Sabeer Dam & Water


Works construction Co.

206.80

20.68

7.57

28.25

Km. 93.70 to Km 111.00

M/s Sabeer Dam & Water


Works Construction Co.

181.60

9.08

10.48

19.56

Km. 111.00 to km 136.00

M/s Madhucon Projects

196.20

9.81

3.02

12.83

Km. 136.00 to Km 162.409

M/s K.C.L.-J.C.C.G. (JV)

175.00

17.50

9.58

27.08

KM 162.409 to Km 181.50

M/s IVRCL-Prasad-SEW
(JV)

113.38

Agreement to be concluded

1583.34

105.85

TOTAL

77.48

261.80

INDIRA SAGAR PROJECT LEFT MAIN CANAL


1

Project Profile: Construction of Indira Sagar Project Left Main Canal to irrigate an ayacut of
98,383 acres

G. O. Ms. No. 96, I & CAD, Dt: 10-092004 for Rs. 1353.00 Crores

Administrative Sanction

No. of EPC Packages

: 8 Nos

Agreement value of 8 packages

: Rs.1583.34 Crs.

Budget provision for 2006-07 (for project)

: Rs.675 Crs.

Expenditure of the project

2004 05 : Rs. 151.97 Crs.


2005 06 : Rs. 109.83 Crs.
Cum. Exp.

: Rs. 261.80 Crs


127.14 TMC (irrigation= 103.70 TMC)

Utilisation

Ayacut

: 4.00 lakh acres

Land Acquisition

10

(water supply to vizag city = 23.44 TMC)

Required

: 9998 acres

Requisitioned

: 8446 acres

Acquired

: 2783 acres

Forest Land (package VI & VII

: 277 acres

11

Mob. Advance (Rs. in Crores)

Paid

Recovered

2004-05 : 73.50

--

2005-06 : 32.35

--

Total : 105.85

--

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 1 /Cat-I: Excavation of main canal,

lining and construction of CM & CD


works including investigation, design of
Indira Sagar LMC from Km.0.00 to KM
25.600

Name of the Contractor


Const.Ltd.

: M/s.Progressive

Agreement Amount

: Rs.254.88 Crs.

Agreement Date

: 20-03-2005

Period of Completion

: 24 Months (8 Milestones

Target date of completion

: 3/2007

Investigation

: Completed

Designs

: In progress

Execution (main canal)

: 7.20 Km length in progress against 25.6 Km.

Qty. of earth work done : 28,95,734 cum against 1,19,36,000 cum

Expenditure

Land Acquisition

acres

:
2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 12.74 Crs.


- Rs. 38.86 Crs.
- Rs. 51.60 Crs.

: Required 2042 Acres, Requisitioned 2042 acres, Acquired 612

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 2 /Cat-I: Excavation of main canal,
lining and construction of CM & CD works
including investigation, design of Indira Sagar
LMC Km 25.600 to Km. 51.60

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target Date of Completion

: M/s.Patel-Soma(JV)
: Rs.242.54 Crs.
: 17-03-2005
: 24 Months (8 Milestones
: 3/2007

Investigation

: Completed

Designs (Structure)

: In progress

Execution (Canal)

: In progress

Qty. of earth work done

: 37,57,000 cum against 1,70,44,000 cum

Qty. of concrete work done

: (lining) 40,100 cum against 1,70,600 cum

Machinery

: deployed 34 Nos. (Excavators 13, Tippers 21 etc)

Expenditure

Land Acquisition
acres

: Required 2042 Acres, Requisitioned 2042 acres, Acquired 612

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 12.13 Crs.


- Rs. 19.48 Crs.
- Rs. 31.61 Crs

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 3 /Cat-I: Excavation of main canal,

lining and construction of CM & CD works


including investigation, design of Indira
Sagar LMC Km 51.60 to 69.145

Name of the Contractor

: M/s. Maytas-NCC(JV)

Agreement Amount

: Rs. 212.94 Crs.

Agreement Date

: 19-03-2005

Period of Completion

: 24 Months (8 Milestones

Target Date of completion : 3/2007

Investigation

: Completed

Designs approved

: 17.45 Kms length against 17.545Kms

Execution

: 1.15 KM against 17.545 Kms

Qty. of Earth work done : 3,62,000 cum against 80,95,063 cum

No. of Machinery

: 13 deployed (dumpers 10, Excavators 2, Dozers-1)

Expenditure

Land Acquisition
acres

: Required 2042 Acres, Requisitioned 2042 acres, Acquired 612

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 10.65 Crs.


- Rs. 1.75 Crs.
- Rs. 12.40 Crs

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 4 /Cat-I: Excavation of main canal,

lining and construction of CM & CD works


including investigation, design of Indira
Sagar LMC Km .69.145 to Km.93.70

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation

: Completed

Execution

: 8.06 Km length against 24.555 Km

Qty. of earth work done : 18,28,000 cum against 70,00,000 cum

No. of Machinery

: 25 (proclains 5 Nos., Tippers 20 Nos.)

Expenditure

Land Acquisition

acres

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

: M/s. Sabir Dam & Wate


works Const. Co.
: Rs. 206.80 Crs.
: 23-03-2005
: 24 Months (8 Milestones
: 3/2007

- Rs. 10.65 Crs.


- Rs. 1.75 Crs.
- Rs. 12.40 Crs

: Required 1253 acres, Requisitioned 779 acres, Acquired 394

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 5 /Cat-I: Excavation of main canal,

lining and construction of CM & CD works


including investigation, design of Indira
Sagar LMC Km 93.70 to Km 111.00

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation

: Completed

Designs

: 6.00Kms length against 17.30Kms

Execution

: 5 Km length against 17.30 Km

Qty. of earth work done : 12,78,000 Cum against 85,00,000cum

No. of Machinery

: M/s. Sabir Dam & Wate


works Const. Co.
: Rs. 181.60 Crs.
: 23-03-2005
: 24 Months (8 Milestones
: 3/2007

: 17 (Excavators 4 Nos., Tippers 10 Nos., Dozers 2 Nos., tractor

1 No.)

Expenditure

2004-2005

- Rs. 9.08 Crs.

2005-2006

- Rs. 10.48 Crs.

Cum. Inc. Mob. Adv. only

- Rs. 19.50 Crs

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 6 /Cat-I: Excavation of main canal,

lining and construction of CM & CD works


including investigation, design of Indira
Sagar LMC Km.111.00 to Km136.00.

Name of the Contractor

: M/s. Madhucon-Sino

Agreement Amount

: Rs. 196.20Crs.

Agreement Date

: 23-03-2005

Period of Completion

: 24 Months (8 Milestones

Target date of completion

: 3/2007

Hydro (JV)

Investigation

: Completed

Designs

: 21 Kms length against 25 Kms

Execution

: 3.030 Kms length against 25Kms

Qty. of earth work done : 6,37,500 Cum against 1,11,00,000cum

No. of Machinery

: 41 (Excavators 7 Nos., Dozer 3 No., Dumpers 28 Nos., Compressors 3

Nos.)

Expenditure

Land Acquisition

2004-2005

- Rs. 9.81 Crs.

2005-2006

- Rs. 3.02 Crs.

Cum. Inc. Mob. Adv. only

- Rs. 12.83 Crs

: Required 1260 Acres, Requisitioned 1027 acres, Acquired 312

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 7 /Cat-I: Excavation of main canal,

lining and construction of CM & CD works


including investigation, design of Indira
Sagar LMC Km136.00 to Km.162.409.

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation

: Completed

Designs

: 23 Kms length against 26.409 Kms.

Structures

: M/s.KCL-JCCG(JV)
: Rs. 175.00 Crs.
: 14-03-2005
: 24 Months (8 Milestones
: 3/2007

: Nil against 75 Nos.

Execution

: 7.30 Kms length against 26.409Kms

Qty. of earth work done : 16,46,700 Cum against 62,00,000cum

No. of Machinery

: 64 (Excavators 3 Nos., Tippers 21 Nos., Dozer 2 No. etc.)

Expenditure

Land Acquisition

: Required 1211 acres, Requisitioned 1100, Acquired 361 acres,

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 8.75 Crs.


- Rs. 18.33 Crs.
- Rs. 27.08 Crs

INDIRA SAGAR PROJECT LEFT MAIN CANAL


Pkg.No. 8 /Cat-I: Excavation of main

canal from 162.409 to KM 177.809 and

Name of the Contractor: M/s IVRCL SEW PRASAD

improvements to existing water supply


canal from KM 10.902 to KM 33.609 and
excavation of water supply canal from
KM 0.00 to KM 10.85 including CM &
CD works.

Tender accepted in
Government Memo No.
7029/Bids of Open Category (3 Bids) dated 31-122005 for
Rs. 113.38 Crs.
Agreement is to be concluded.

INDIRA SAGAR PROJECT (POLAVARAM) HEAD WORKS


1

Project Profile: Construction of Head Works of Indira Sagar Project

Administrative Sanction

: G. O. Ms. No. 129, I & CAD, Dt: 6-112004 for Rs. 1084.82 Crores

No. of EPC Packages

: 7 Nos

Agreement value of 7 packages

: Rs.1117.30 Crs.

Budget provision for 2006-07 (for project)

: Rs.675 Crs.

Expenditure of the project

2004 05 : Rs. 23.48 Crs.


2005 06 : Rs. 101. 34 Crs.
Cum. Exp.
7

: Rs. 124.82 Crs

Land Acquisition
Required

: 919 acres

Requisitioned

: 919 acres

Acquired

: 316 acres

Forest Land (Pkgs. 63, 64,65 & 66)

: 133.07 acres

R & R Est. (for project)

: Rs.3466.83 Crs.
Expenditure for R & R = Rs.1.527 Crs.

10

Mob. Advance (Rs. in Crores)

Paid

Recovered

2004-05 : 23.48

--

2005-06 : 45.55

--

Total : 69.03

--

INDIRA SAGAR PROJECT


CATEGORY-I
PKG
No.

Description
Investigation preparation of designs,
drawings and estimates for
constructions of

62

Right flank regulator and off-take


regulator,
saddle
dams
E&F
including its construction for right
side connectivity.

(POLAVARAM) HEAD WORKS

Awarded

Bid Amount
Rs. in Crs.

Expenditure up to 2/2006
Rs. In Crs.)

Mobi.
Adv.

Works

Total

M/s Hindustan - Ratna


(JV)

79.00

3.95

--

3.95

63

Tunnel of about 900M long,


excavation of entry and exit
channels, formation of bunds etc.
including its construction for right
side connectivity

M/s SMSL-UAMRCL
(JV)

72.81

7.28

4.25

11.53

64

Tunnel of about 880M long,


excavation of entry and exit
channels, formation of bunds etc.
including its construction for right
side connectivity

M/s.G. Venkat Reddy


& Co.

73.89

7.38

4.80

16.04

65

Tunnel of about 919M & left flank


regulator including its construction
for left side connectivity of Indira
Sagar Project.

M/s. Unity Infra


Projects

90.99

7.64

5.80

13.44

66

Tunnel of about 890M Long saddle


dams K&L & off-take regulator
including its construction for left
side connectivity

Sri Avantika & Sai


ta (JV)

90.00

6.00

1.47

7.47

67

Navigation lock left side and


navigation canal leading to River
Godavari including its construction
for the left side connectivity

Sri Jaya K Siva Rao


(JV)

77.0

5.10

1.10

6.20

Categ
ory

Spillway

M/s. Madhucon Sino


hydro (JV)

633.60

31.68

12.45

44.14

Annu
ity
basis

Earth cum rock fill dam and power


house with tail race channel

Estimated amount Rs.


2865 Crs.

2 bids received
Technical bid
evaluation is under
process Financial bid
opening -19-11-05

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. Spillway : Construction of Spillway
of length 985.50M consisting of 48 vents each
of size 16 m x 15 m on right bank of discharge
36 Lakhs cusecs with FRL at +45.72 m for ISP
across river Godavari at Ramayyapeta (V) in
WG (D).

Name of the Contractor

: M/s Madhucon-Sino

Agreement Amount
Agreement Date
Period of Completion
milestones)
Target date of completion

: Rs. 633.60 Crs.


: 23-03-2005
: 36 Months (12

Hydro(JV)

Investigation

: Completed

Designs

: Under scrutiny & approval

Execution (progress)

: 0.50 Kms length against 0.985Kms

Qty. of earth work done : 7,68,353 cum against 72,76,500 cum

No. of Machinery

: 26 deployed

Expenditure

Land Acquisition

: Required 238.96 acres, Acquired 124.12 acres

Bottle Necks

: DN Published for 114.84 acres.

2005-2006

: 3/2008

- Rs. 44.14 Crs. (Inc. Mob.adv.)

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 62 : Construction of right flank
regulator and off take regulator, saddle dam
including its construction for right side
connectivities.

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target date of Completion

Investigation

: Completed

Designs

: in progress

Execution

: in progress

Qty. of earth work done : 51,500 cum against 6,22,253 cum

Expenditure

Land Acquisition

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

: M/s. Hindustan-Ratna(JV
: Rs. 79.00 Crs.
: 05-03-2005
: 24 Months(8 Mile Stones
: 3/2007

- Rs. 3.95 Crs.


- Rs. 0.06 Crs.
- Rs. 4.01 Crs

: Required 124.12 Acres, Acquired 29.76 acres

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 63 : Construction of tunnel of about
900m long excavation of entry and exit
channels

Name of the Contractor

: M/s. SMSL-UANRCL(JV)

Agreement Amount

: Rs. 72.81 Crs.

Agreement Date

: 09-03-2005

Period of Completion

: 24 Months (8 Mile Stone

Target Date of Completion : 3/2007

Investigation

: Completed

Designs

: In progress

Execution

: yet to be started

Qty. of earth work done

: 33,000 cum against 5,49,829 cum

No. of Machinery deployed

: 5 Nos. (Dozer-1, Excavators-1, Tippers-3)

Expenditure

2004-2005

- Rs. 3.64

2005-2006

- Rs. 7.89

Cum. Inc. Mob. Adv. only

- Rs. 11.53

Crs.
Crs.
Crs

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 64 : Construction of tunnel of about
880m long excavation of entry and exit
channels

Name of the Contractor

: G.Venkata Reddy & Co.,

Agreement Amount

: Rs. 73.89 Crs.

Agreement Date

: 11-03-2005

Period of Completion

: 24 Months(8 Mile Stones

Target date of Completion : 3/2007

Investigation

: Completed

Designs

: In progress

Execution

: 0.1 Kms length against 1.488 Kms

Qty. of earth work done

: 1,43,405 cum against 11,31,790cum

No. of Machinery deployed

: 16 Nos. (Tippers-10, proclainers-2, generators-2

etc.)

Expenditure

2004-2005

- Rs. 3.69

2005-2006

- Rs. 12.35

Crs.
Crs.

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 65 : Construction of tunnel of about
919m long and left flank regulator

Name of the Contractor

: M/s. Unity Infra Project

Agreement Amount

: Rs. 90.99 Crs.

Agreement Date

: 16-03-2005

Period of Completion

: 24 Months (8 milestones

Target date of completion

: 3/2007

Investigation

: Completed

Designs

: In progress

Execution

: 0.90 Kms length against 3.115 Kms

Qty. of earth work done

: 2,65,000 cum against 14,98,736cum

No. of Machinery
etc)

: 22 deployed (Excavators 5 Nos., dumpers 13 Nos.,

Expenditure
Crs.

2004-2005

- Rs. 4.55

2005-2006

- Rs. 8.89

Cum. Inc. Mob. Adv. only

- Rs. 13.44

Crs.
Crs

Land Acquisition

: Required 92.58 Acres, Acquired 32.23 acres

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 66 : Construction of tunnel of about
890m long, saddle dam long KL, off-take
regulator.

Name of the Contractor


Venkata
Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation

: Completed

Designs

: In progress

Execution

: Length 0.59 Kms against 3.515Kms

Qty. of earth work done : 1,29,000 cum against 21,57,671 cum

No. of Machinery

: M/s. Aventika & Sai

: Rs. 90.00 Crs.


: 14-03-2005
: 24 Months (8 Milestones
: 3/2007

: 25 deployed (Excavators 1 No, tippers 10 Nos., tractors 3

Nos. etc.)

Expenditure

Land Acquisition
Forest Land

2004-2005

- Rs. 4.50 Crs.

2005-2006

- Rs. 2.97 Crs.

Cum. Inc. Mob. Adv. only

- Rs. 7.47 Crs

: Required 124.77 Acres, Acquired 30.77 acres


:Required 41.53 acres

INDIRA SAGAR PROJECT HEAD WORKS


Pkg.No. 67 : Construction of navigation lock
left side and navigation canal leading to river
Godavari.

Name of the Contractor

: M/s. Jaya K. Siva Rao

Agreement Amount

: Rs. 77.00 Crs.

Agreement Date

: 05-03-2005

Period of Completion

: 24 Months (8 milestones

Target date of completion

: 3/2007

Designs

: In progress

Execution

: 0.50 Kms length against 4.00Kms

Qty. of earth work done : 80,000 cum against 22,59,058cum

No. of Machinery

: 6 deployed (procliner 1No., tippers 5 Nos.)

Expenditure

Land Acquisition

: Required 91.22 Acres, Acquired 30.17 acres

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 3.15 Crs.


- Rs. 3.05 Crs.
- Rs. 6.20 Crs

POLAVARAM BARRAGE

INDIRA SAGAR PROJECT RIGHT MAIN CANAL

PACKAGE-1

PACKAGE-2

KM 14.80

KM 0.00

KM
23.399

KM 14.80

PACKAGE-3

PACKAGE-4

KM
33.301

KM 38.199

PACKAGE-5

PACKAGE-7

KM 22.70

KM 17.50

KM 28..70

KM 33.60

KM 71.50

PACKAGE-6

KM 105.10

KM 133.80

KM 156.50

KM 174.00

CATEGORY-I
PKG
No.
P

Description
Excavation of Main Canal, Lining and
construction of CM & CD works
including investigation, design of :

Awarded

Bid
Amount
Rs. in Crs.

Expenditure up to 2/2006
Rs. in Crs.)
Mobi.
Adv.

Works

Total

Km. 0.00 to Km. 14.80

M/s Patel & Soma (JV)

241.50

18.81

20.95

39.75

Km. 14.80 to Km. 38.199

M/s Progressive
Constructions Ltd.,

236.25

23.62

21.93

45.55

Km. 38.199 to Km. 71.500

M/s Hindustan
Construction Co. Ltd.

321.30

16.06

3.71

19.77

Km. 71.50 to Km. 105.10

M/s Jai Prakash-Gayatri


(JV)

301.30

15.06

4.47

19.53

Km. 105.10 to Km. 133.80

M/s I.V.R.C.L.-S.E.W &


Prasad (jv)

295.92

14.79

4.13

18.92

Km. 133.80 to Km. 156.50

M/s Progressive
Constructions Ltd.,

196.74

19.68

9.83

29.51

Km. 156.50 to Km. 174.00,

M/s Larsen & Toubro Ltd.,

180.70

9.04

1.39

9.04

1773.71

117.06

66.41

183.47

TOTAL

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


1

Project Profile: Construction of Indira Sagar Project Right Main Canal 174 km to irrigate an

Administrative Sanction

No. of EPC Packages

O. Ms. No. 74, I & CAD, Dt: 27-7-04


: G.
for Rs. 1320.00 Crores
: 7 Nos

Agreement value of 7 packages

: Rs.1773.71 Crs.

Budget provision for 2006-07 (for project)

: Rs.673 Crs.

Expenditure of the project

ayacut of 3,21,000 acres

2004 05 : Rs. 100.64 Crs.

2005 06 : Rs. 129.26 Crs.


Cum. Exp.
: Rs. 229.90 Crs
: 174.24 TMC (irrigation= 89.54 TMC)

Utilisation

(Krishna basin (inc. Evap. Loses) = 84.70


TMC)

Ayacut

Land Acquisition

10

: 3,21,000 acres
Required

: 13923 acres

Acquired

: 3282 acres

Mob. Advance ( Rs. in Crores)

Paid

Recovered

2004-05 : 100.49

--

2005-06 : 25.74

9.88

Total : 126.23

9.88

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 1: Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 0.00 to km.14.80.

Name of the Contractor

: M/s. Patel Soma (JV)

Agreement Amount

: Rs. 241.50 Crs.

Agreement Date

: 21-10-2004

Period of Completion
Stones)

: 24 Months ( 8 Mile

Target Date of Completion : 2/2007

Investigation

: Completed

Designs

: Completed

Execution (canal)

: 2.4 Km length against 14.08 KM

Qty. of earth work done : 37,68,013 cum against 1,44,45,129 cum

No. of Machinery

: 46 deployed (tippers 30, Proclaims 9Nos, Dozers 7Nos.)

Expenditure

Land Acquisition

: Required 1257 Ac, Acquired 859 Ac.

Bottle Necks

: Ryoths are obstructing the survey for the announcement of

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 12.07 Crs.


- Rs. 43.80 Crs.
- Rs. 55.87 Crs

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 2: Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 14.80 to 38.199.

Name of the Contractor


Ltd.

: M/s. Progressive Const.

Agreement Amount

: Rs. 236.25 Crs.

Agreement Date

: 20-10-2004

Period of Completion

: 24 Months (8 Mile Stone

Target date of Completion : 2/2007

Investigation

: 11.90 Km length against 23.399Kms

Designs approved

: 11.90 Kms length against 23.399Kms

Execution (canal)

: 0.4 Km length against 23.399 Km.

Qty. of earth work done : 43,62,289 Cum against 1,91,78,193 Cum

No. of Machinery

: 159 (tractors 127, Dozers-15 Nos., Proclaims-13, etc.,)

Expenditure

Land Acquisition

: Required 2041.91 Ac, Acquired 704 Ac.

Bottle Necks

: Ryoths are obstructing the survey for the announcement of

compensation.

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 23.62 Crs.


- Rs. 28.53 Crs.
- Rs. 52.15 Crs

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 3: Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 38.199 to Km.71.50

Investigation

: Completed

Designs

: Completed

Structures

Name of the Contractor

: M/s.Hindustan Constn.Co.

Agreement Amount
Agreement Date
Period of Completion
Target Date of completion

: Rs. 321.30 Crs.


: 23-10-2004
: 24 Months (8 Milestones
: 2/2007

Ltd.

: in progress

Execution

Qty. of earth work done : 18,71,432 cum against 1,21,21,276 cum

No. of Machinery

: 53 Nos. (Tippers -35, Proclains-16Nos,Dozers-2 Nos)

Expenditure

Land Acquisition

: Required 3657 Ac, Acquired 476 ac

Bottle necks

: Ryoths are obstructing the survey for the announcement of

compensation.

: Works started

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

- Rs. 16.06 Crs.


- Rs. 16.55 Crs.
- Rs. 32.61 Crs

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 4 : Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 71.50 to 105.10

Name of the Contractor


Gyatri(JV)
Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation (progress) : 28 Kms length against 33.60 Kms

Designs approved

: 28 Kms length against 33.60 Kms.

Execution

: 0.350 Length Km against 33.6 Km.

Qty. of earth work done : 24,35,000 cum against 86,82,139cum.

No. of Machinery

: 43 (Tippers-31, Proclains-8,JCB-2Nos etc.,)

Expenditure

: M/s. Jaiprakash

: Rs. 301.30 Crs.


: 23-10-2004
: 24 Months (8 Milestones
: 2/2007

2004-2005

- Rs. 15.06 Crs.

2005-2006

- Rs. 8.79 Crs.

Cum. Inc. Mob. Adv. only

- Rs. 23.85 Crs

Land Acquisition

: Required 2645 Ac, Acquired 569 ac.

Bottle Necks

: Ryoths are obstructing the enjoyment survey for the

announcement of

compensation.

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 5 : Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 105.10 to 133.80

Name of the Contractor


Agreement Amount
Agreement Date
Period of Completion
Target date of completion

: M/s.IVRCL SEW&Prasad(JV
: Rs. 295.92 Crs.
: 23-10-2004
: 24 Months (8 Milestones
: 2/2007

Investigation

: 27.7 Kms length against 28.7 Kms

Designs approved

: 27.7 Kms length against 28.7Kms.

Structures

: Nil against 26 Nos.

Execution

: 14,77,650 cum against 90,55,503 cum

Expenditure

Land Acquisition

: Required 1847.00 Acres, Acquired 177 acres.

Bottle Necks

: Ryoths are obstructing the enjoyment survey for the

announcement of

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

compensation.

- Rs. 14.80 Crs.


- Rs. 7.15 Crs.
- Rs. 21.95 Crs

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 6: Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 133.80 to Km.156.50

Name of the Contractor


Const.Ltd.

: M/s.Progressive

Agreement Amount

: Rs. 196.74 Crs.

Agreement Date

: 20-10-2004

Period of Completion

: 24 Months (8 Milestones

Target date of completion

: 2/2007

Investigation

: Completed

Designs

: Completed

Structures

: in progress

Execution

: 0.6 KM length against 22.7 KM.

Qty. of earth work done : 19,90,000 cum against 85,19,000cum

No. of Machinery

: 60 Deployed (tractors 48, Tippers-6, Proclains-2Nos etc)

Expenditure

Land Acquisition

: Required 1343 acres, Acquired 366 acres

Bottle Necks

: Ryoths are obstructing the enjoyment survey for the

announcement of

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

compensation.

- Rs. 9.84 Crs.


- Rs. 19.66 Crs.
- Rs. 29.50 Crs

INDIRA SAGAR PROJECT RIGHT MAIN CANAL


Pkg.No. 7: Earth work excavation, forming
embankments, constructions of CM & CD
works from km. 156.50 to 174.00.

Name of the Contractor


Ltd.
Agreement Amount
Agreement Date
Period of Completion
Target date of completion

Investigation

: 12.0 Kms Length against 17.5 Kms

Designs approved

: 12.0 Kms length against 17.50 Kms

Structures

: M/s. Larson&TOUBRO

: Rs. 180.70 Crs.


: 25-10-2004
: 24 Months (8 Milestones
: 2/2007

: in progress

Execution

: 4,21,000 cum against 76,05,554 cum

Expenditure

Land Acquisition

: Required 1132 acres, Acquired 131 acres

Bottle Necks

: Ryoths are obstructing the enjoyment survey for the

announcement of

2004-2005
2005-2006
Cum. Inc. Mob. Adv. only

compensation.

- Rs. 9.04 Crs.


- Rs. 4.70 Crs.
- Rs. 13.74 Crs