Anuj Dixit
Planning Engineer
Resource Integration
RPG Meeting
August 17, 2012
Purpose
- ERCOT is encountering some projects in which the inverter
designs limit the capability of the solar plant because all of the
protocol requirements were not considered in the design.
- So far, these limitations have been on reactive capability across
operating range.
Outline
Example
Modeling requirements
Protocol requirements
Summary
Questions / Discussion
Operating Area
-0.250
0.250
MVAr
Solar PV projects
Steady state
Active/Reactive Power Capability
Voltage control settings
Generator step up transformer
Short circuit
Equivalenced collector system model
Dynamic
Compatible PSS/E standard model or a user defined model
Summary
10
Questions ?
11