General Assumptions

MoE

Quantity [l/cd]

Type of Demand

Urban

Rural

Domestic water demand

110

110

Non-domestic water demand

2.1

Non-domestic water demand - population related

2.1.1

Non-domestic demand public

20

10

2.1.2

Non-domestic demand commercial+small


industries

30

15

2.2

Non-domestic water demand - large industries

Separate estimation considering large industries


for each CF agglomeration

Total demand - population related

160

135

Water Losses [% of total water demand - population related + large industries] *

4.1

Aged systems

50%

50%

4,2

Systems fully rehabilitated or built within last


years*

25%

25%

4.3

New systems

15%

15%

Factors

5.1

Factor peak day/medium day

1,25

1,25

5.2

Factor peak hour/daily demand

1,4

1,4

Wastewater return rate

100%

100%

European Union

Page 2

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Connection Rate

MoE

European Union

Page 3

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Bacau

MoE

European Union

Page 4

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Bacau Water Balance

MoE

European Union

Page 5

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Bacau
Water Supply

Description

Wastewater Disposal
Investment
[]

Rehabilitation WTP Caraboaia

3,082,200

Rehabilitation WS network ( AC parts )

3,355,330

Network extensions

1,513,300

Total investment FS WS Bacau

7,950,830

MoE

Description
Network extensions

Investment
[]
7,923,679

Pumping stations

684,000

Pressure Lines

480,000

WWTP

13,095,370

Total investment FS WW Bacau

22,183,049

European Union

Page 6

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Caraboiaia Baseline Data

ASSUMPTION FOR DESIGN :

CAPACITY - 800 l/s = 69,120 m/d


RAW WATER - Suspended Solids < 50 mg/l, Temperature > 5

TREATMENT STEPS -

Pre-Oxidation (ClO2),
Flocculation (Ferric

Improvement treatment process

Chloride),
Sedimentation,
Filtration,
Disinfection (Chlorine),
Sludge Dewatering

MoE

European Union

Page 7

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Caraboiaia Process Flow Diagram

MoE

European Union

Page 8

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Caraboiaia Layout Plan

MoE

European Union

Page 9

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Caraboiaia Investment Costs, sludge treatment on the WTP

MoE

European Union

Page 10

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Extension network Bacau City

MoE

European Union

Page 11

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Rehabilitation Asbestos
Cement parts in Bacau
City

MoE

European Union

Page 12

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Water Supply Network Investment Costs

Connection Rate 90% 92%

MoE

European Union

Page 13

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Bacau WW Measures

Network extensions
Sewer DN 250 - DN 350

25,645

Sum [Euro]

7,923,679

Sum [Euro]

18

pcs.

Sum [Euro]

684,000

Sum [Euro]

480,000

Sum [Euro]

6,419,870
6,675,500
13,095,370

[Euro]
[Euro]

22,183,049
20,489,000

Network rehabilitation
Sewer rehabilitation
Pumping Stations
8 Secondary Network + 1
Main PS
Pressure lines
Pressure line DN 100

6,000

WWTP
Civil parts
E/M parts

Total Investment FS
Total Investment MP

Connection Rate 47% 90%


MoE

European Union

Page 14

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Baseline Data

Settlement
Sohodol
Crihan
Padureni
Trebes
Valea Budului
Fantanele
Margineni
Barati
Hemeius
Lilieci
Saucesti
Bogdan Voda
Letea Veche
Dealu Mare
Magura
Bacau
Total
Cumulated
Capita
Percent

MoE

Compliance Compliance Compliance


Phase 1
Phase 2
Phase 3
2015
2018
2037
565
565
604
604
478
478
824
824
402
402
229
229
3,561
3,561
1,937
1,937
1,706
1,706
2,402
2,402
2,007
2,007
482
482
2,687
2,687
338
338
2,934
2,934
179,442
179,442
200,598
197,315
2,489
794

Total Capita

European Union

98%

199,804

200,598

100%

100%

Page 15

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Bacau Analysis of Inflow Concentrations 85 % Quantile of Monthly Values 2006 - 200

MoE

European Union

Page 16

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Bacau Analysis of Inflow Concentrations 85 % Quantile of Monthly Values 2006 - 200

MoE

European Union

Page 17

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WTP Bacau Analysis of Inflow Concentrations 85 % Quantile of Monthly Values 2006 - 200

Parameter

85 % Quantile
[p.e.]

BOD5

114,000

COD

144,000

187,000

SS

120,000

Selected existing connection rate: 114,000 p.e.

MoE

European Union

Page 18

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Analysis of Industrial Pollution Loads

Industrial Dischargers [p.e.]


Year

BOD5

COD

SS

2005

21,838

27,945

15,083

30,989

2006

28,512

34,605

14,311

39,510

2007

23,808

31,372

13,834

36,469

2008

14,890

19,246

9,379

21,613

Average

22,262

28,292

13,152

32,145

Selected for Design: 40,000 p.e. Industrial Pollution Load

MoE

European Union

Page 19

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Main Design Parameters

MoE

FS Design ISPA Project

Design Parameter

Unit

Dry Weather Flow

m3/d

73,965

77,760

m3/h

3,720

3,240

Max. Storm Weather Flow

m3/h

5,899

6,000

Biological design capacity (Raw


Water Inflow)

kg BOD5/d

15,879

13,670

Capacity of WWTP in Population


equivalent BOD5

p.e.

240,598

227,833

Total volume of wastewater treated in


WWTP (yearly average at the outlet
of WWTP)

m3/a

26,997,373

28,382,400

European Union

Page 20

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Effluent Concentrations


The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in the
Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Parameter

Plant Size

Minimum
FS Effluent
percentage of
Concentration
reduction

p.e.

mg/l

BOD5

--

25

25

COD

--

125

125

SS

2,000 10,000

60

70

> 10,000

35

90

35

10,000 100,000

80

No Requirements

> 100,000 or sensitive


areas

80

10,000 100,000

15

70 - 80

Total N (1)

ISPA Effluent
Concentration
mg/l

No Requirements

> 100,000 or sensitive


10
70 - 80
areas
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate (NO3-N)nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 21

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Main Investments


Mechanical Treatment
No Investments
Biological Treatment
Adjustment of Aeration Tank 1
Replacement/Adjustment of fine bubble diffuser
system in aeration tank 1
Demolition and rebuilding of aeration tank 2
Installation of fine bubble diffuser system in aeration
tank 2
Extension of the existing rotary piston blowers
Installation of a chemical precipitation unit
Extension of the existing SCADA system.

MoE

European Union

Page 22

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Main Investments

Sludge Treatment
Increase of sludge dewatering capacities
Construction of additional anaerobic digester
Construction of process water tank
Construction of sludge storage area
Others
Construction of an emergency flood pumping
station at plant effluent

MoE

European Union

Page 23

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Layout Plan

MoE

European Union

Page 24

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Flow Scheme Wastewater Treatment

MoE

European Union

Page 25

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Flow Scheme Sludge Treatment

MoE

European Union

Page 26

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Bacau Investment and O&M cost


Investment Cost

Investment Cost

O&M Cost

O&M Cost

Euro

1. Personnel Cost
Total Civil Works

4,526,500

Total Electrical Equipment

2,149,000

13,095,370

Euro/p.e./y

89,700

0.003

0.37

2. Energy Cost

688,110

0.232

36

2.86

3.1 Sludge Disposal Cost

358,741

0.013

19

1.49

46,654

0.002

0.19

4. Consumable Cost

400,102

0.015

21

1.66

5. Maintenance Cost

264,464

0.010

14

1.10

6. Other Yearly Cost

44,850

0.002

0.19

1,892,620

0.276

100

7.87

3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

6,419,870

Total Mechanical Equipment

Total net

Euro/y

European Union

Page 27

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Onesti

MoE

European Union

Page 28

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Onesti
Water Supply

Wastewater Disposal
Description

No Water Supply Measures CF because CR >


90 %

MoE

Network extensions

Investment
[]
5,818,800

Pumping stations

328,000

Pressure lines

262,800

WWTP

12,865,798

Total investment FS WW Onesti

19,275,398

European Union

Page 29

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Onesti WW Measures


Network extensions
Sewer DN 250 - DN 800

18,600

Sum
[Euro]

5,818,800

Sum
[Euro]

pcs.

Sum
[Euro]

328,000

Sum
[Euro]

262,800

Network rehabilitation
Sewer rehabilitation
Pumping Stations
PS, 7 Secondary
Network, 1 Main
Pressure lines
Pressure line DN 80

3,285

WWTP
Onesti Civil parts
Onesti E/M parts
Total WWTP
Total Investment FS
Total Investment MP

7,075,950
5,789,848
Sum
12,865,798
[Euro]
[Euro]
[Euro]

Connection Rate 73% 90%


MoE

European Union

Page 30

19,275,398
15,019,000

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Baseline Data


Settlement

Total Capita

Compliance
Phase 2

Compliance
Phase 3

2015

2018

2037

Bogdana
Stefan Cel
Mare
Negoiesti

616

616

944

944

909

909

Radeana

688

688

Gutinas

509

509

Slobozia

1,226

Borzesti

4,139

4,139

46,042

46,042

Onesti

1,226

Buciumi

1,595

Racauti

1,439

1,439

Gura Vaii

2,783

2,783

Total
Cumulated
Capita
Percent

MoE

Compliance
Phase 1

European Union

60,890

1,595

50,181

82%

7,917

2,792

58,098

60,890

95%

100%

Page 31

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.
Design Parameter

Unit

Value

Dry Weather Flow

m3/d

1,724

25

m3/h

981

--

125

Max. Storm Weather Flow

m3/h

1,724

2,000 10,000

60

70

> 10,000

35

90

Biological design capacity (Raw


Water Inflow)

kg BOD/d

4,989

10,000 100,000

80

p.e.

75,598

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

6,269,011

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

p.e.

mg/l

BOD5

--

COD
SS

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 32

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Construction Site Option 1 - Layout Plan

MoE

European Union

Page 33

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Construction Site Option 2 - Layout Plan

MoE

European Union

Page 34

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Construction Site Option 3 - Layout Plan

MoE

European Union

Page 35

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Flow Scheme Wastewater Treatment

MoE

European Union

Page 36

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Flow Scheme Sludge Treatment

MoE

European Union

Page 37

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Onesti Investment and O&M cost


Investment Cost

Investment Cost

O&M Cost

O&M Cost

Euro

1. Personnel Cost
Total Civil Works

4,149,950

Total Electrical Equipment

1,639,898

12,865,798

Euro/p.e./y

62,100

0.010

0.82

2. Energy Cost

249,474

0.362

31

3.30

3.1 Sludge Disposal Cost

102,773

0.016

13

1.36

3.2 Screenings and Grit Disposal Cost

11,096

0.002

0.15

4. Consumable Cost

97,874

0.016

12

1.29

5. Maintenance Cost

244,455

0.039

31

3.23

6. Other Yearly Cost

31,050

0.005

0.41

798,822

0.449

100

10.57

Total

MoE

Euro/m

7,075,950

Total Mechanical Equipment

Total net

Euro/y

European Union

Page 38

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Moinesti

MoE

European Union

Page 39

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Moinesti Water Balance

MoE

European Union

Page 40

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Moinesti
Water Supply
Description

Wastewater Disposal
Investment
[]

Description

Investment
[]

Rehabilitation main pipe

975,000

Network extensions

Rehabilitation RSVs

300,000

Pumping stations

138,000

Network extensions

1,159,500

Pressure Lines

237,600

Total investment FS WS Moinesti

2,434,500

WWTP North

5,679,785

WWTP South

2,280,514

Total investment FS WW Moinesti

MoE

European Union

8,606,867

16,942,766

Page 41

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Rehabilitation of main
pipe from RSV Pini to
Street Pacii

MoE

European Union

Page 42

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Extension Moinesti

MoE

European Union

Page 43

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Water Supply Network Investment Costs

Connection Rate 84% 93%

MoE

European Union

Page 44

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Moinesti WW Measures


Network extensions
Sewer DN 250 - DN 500

38,364

Sum [Euro]

8,606,867

Sum [Euro]

pcs.

Sum [Euro]

138,000

Sum [Euro]

237,600

Network rehabilitation
Sewer rehabilitation

Pumping Stations
2 Secondary Network PS,
1 Main PS Gazarie
Pressure lines
Pressure line DN 100

2,970

WWTP
Moinesti-North Civil parts
Moinesti-North E/M parts

Existing

3,595,285
2,084,500
5,679,785
1,296,385
984,129
2,280,514

Moinesti-South Civil parts


Moinesti-South E/M parts

Extension
PS/Pressure lines

Total WWTP
Total Investment FS
Total Investment MP

Sum [Euro]
[Euro]
[Euro]

Connection Rate 52% 90%


MoE

European Union

Page 45

7,960,299
16,942,766
12,407,000

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Baseline Data

Settlement

Total Capita

Moinesti North

Compliance
Phase 1

Compliance
Phase 2

Compliance
Phase 3

2015

2018

2037

17,396

17,396

Gazarie

1,148

1,148

Zemes

3,960

Total

22,504

3,960
18,544

Cumulated
Capita
Percent

MoE

82%

European Union

3,960

22,504

22,504

100%

100%

Page 46

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Baseline Data

Settlement

Total Capita

Compliance
Phase 1

Compliance
Phase 2

Compliance
Phase 3

2015

2018

2037

Moinesti South

5,400

5,400

Total

5,400

5,400

Cumulated
Capita
Percent

MoE

100%

European Union

5,400

5,400

100%

100%

Page 47

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

Design Parameter

Unit

p.e.

mg/l

Dry Weather Flow

m3/d

6,629

BOD5

--

25

m3/h

417

COD

--

125

SS

2,000 10,000

60

70

Max. Storm Weather Flow

m3/h

716

> 10,000

35

90

kg BOD/d

1,531

10,000 100,000

80

Biological design capacity (Raw


Water Inflow)

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

p.e.

25,509

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

2,419,533

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 48

Value

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

Design Parameter

Unit

p.e.

mg/l

Dry Weather Flow

m3/d

1,385

BOD5

--

25

m3/h

93

COD

--

125

SS

2,000 10,000

60

70

Max. Storm Weather Flow

m3/h

168

> 10,000

35

90

kg BOD/d

373

10,000 100,000

80

Biological design capacity (Raw


Water Inflow)

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

p.e.

6,210

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

505,562

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 49

Value

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Layout Plan

MoE

European Union

Page 50

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Layout Plan

MoE

European Union

Page 51

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Flow Scheme Wastewater Treatment

MoE

European Union

Page 52

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Flow Scheme Wastewater Treatment

MoE

European Union

Page 53

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Flow Scheme Sludge Treatment

MoE

European Union

Page 54

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Flow Scheme Sludge Treatment

MoE

European Union

Page 55

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-North Investment and O&M cost


Investment Cost

Investment Cost

Total Civil Works

Total Mechanical Equipment

Total Electrical Equipment

O&M Cost

O&M Cost

Euro

Euro/p.e./y

1. Personnel Cost

27,600

0.011

1.08

2. Energy Cost

98,211

0.369

26

3.85

1,378,500

3.1 Sludge Disposal Cost

53,006

0.022

14

2.08

706,000

4,230

0.002

0.17

4. Consumable Cost

79,224

0.033

21

3.11

5. Maintenance Cost

98,488

0.041

26

3.86

6. Other Yearly Cost

13,800

0.006

0.54

374,559

0.483

100

14.68

3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

3,595,285

5,679,785

Total net

Euro/y

European Union

Page 56

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Moinesti-South Investment and O&M cost


Investment Cost

Investment Cost

O&M Cost

O&M Cost

Euro

1. Personnel Cost
Total Civil Works

730,550

Total Electrical Equipment

253,579

2,280,514

Euro/p.e./y

6,900

0.014

1.11

2. Energy Cost

23,909

0.430

21

3.85

3.1 Sludge Disposal Cost

13,225

0.026

12

2.13

1,488

0.003

0.24

4. Consumable Cost

20,850

0.041

19

3.36

5. Maintenance Cost

42,488

0.084

38

6.84

6. Other Yearly Cost

3,450

0.007

0.56

112,309

0.605

100

18.09

3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

1,296,385

Total Mechanical Equipment

Total net

Euro/y

European Union

Page 57

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Buhushi

MoE

European Union

Page 58

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Buhushi Water Balance

MoE

European Union

Page 59

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Buhushi
Water Supply

Description

Wastewater Disposal
Investment
[]

Network extensions

1,293,900

Total investment FS WS Buhusi

1,293,900

Description
Network extensions

4,913,573

Pumping stations

366,000

Pressure lines

226,400

WWTP
Total investment FS WW Buhusi

MoE

Investment
[]

European Union

7,449,590
12,955,563

Page 60

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Extension Buhushi

MoE

European Union

Page 61

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Connection Rate 85% 98%

MoE

European Union

Page 62

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Existing
Extension

Agglomeration Buhusi WW Measures

PS/Pressure lines
Network extensions
Sewer DN 250 - DN 500

19,472

Sum [Euro]

4,913,573

Sum [Euro]

Sum [Euro]

366,000

Sum [Euro]

226,400

Sum [Euro]

4,864,590
2,585,000
7,449,590

[Euro]
[Euro]

12,955,563
10,632,000

Network rehabilitation
Sewer rehabilitation
Pumping Stations
8 Secondary Network + 1
Main PS
Pressure lines
Pressure line DN 100

9 pcs.

2,830

WWTP
Civil parts
E/M parts
Total Investment FS
Total Investment MP

Connection Rate 42% 90%

MoE

European Union

Page 63

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Buhusi Connection of ind. WWTP to dom. WWTP

Industrial WWTP
(to be abandoned)

New Connection
DN 300

Connection of Ind. WWTP to dom. WWTP (Ind. WWTP is abandoned)


No
Description
Quantity
Unit
Unit cost EUR
1 Sewer DN 300 (depth 3,00 m Asphalt road)
1,139
m
221
2 Manholes Depth 3,00 m
19
pcs.
1,390
3 CSO at WWTP
1 lump sum
70,000
Total

MoE

European Union

Domestic
WWTP

Total EUR
251,719
26,387
70,000
348,106
Page 64

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Buhusi Connection of domestic parts of ind. WWTP to dom. WWTP

Disconnection of dom.
Sewers, installation of CSO

No
Description
1 Sewer DN 300 (depth 3,00 m Asphalt road)
2 Manholes Depth 3,00 m
3 CSO at WWTP

MoE

Quantity
Unit
60
m
2
pcs.
1 lump sum

Unit cost EUR


221
1,390
70,000
Total

European Union

Total EUR
13,260
2,780
70,000
86,040

Page 65

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Baseline Data

Settlement

Total Capita

Compliance
Phase 1

Compliance
Phase 2

Compliance
Phase 3

2015

2018

2037

Tardenii Mari

790

790

Valea Lui Ion

1,421

1,421

Blagesti

2,350

2,350

Buda

2,061

2,061

Racova

2,230

2,230

Buhusi

19,678

19,678

Total

28,530

19,678

Cumulated
Capita
Percent

MoE

European Union

69%

8,852

28,530

28,530

100%

100%

Page 66

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

Design Parameter

Unit

p.e.

mg/l

Dry Weather Flow

m3/d

7,709

BOD5

--

25

m3/h

497

COD

--

125

SS

2,000 10,000

60

70

Max. Storm Weather Flow

m3/h

887

> 10,000

35

90

kg BOD/d

2,089

10,000 100,000

80

Biological design capacity (Raw


Water Inflow)

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

p.e.

34,823

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

2,813,840

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 67

Value

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Layout Plan

MoE

European Union

Page 68

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Flow Scheme Wastewater Treatment

MoE

European Union

Page 69

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Flow Scheme Sludge Treatment

MoE

European Union

Page 70

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Buhusi Investment and O&M cost


Investment Cost

Investment Cost

O&M Cost

O&M Cost

Euro

1. Personnel Cost
Total Civil Works (incl. 1.6 km Effluent
Pipe DN 600)

4,864,590

Total Mechanical Equipment

1,561,000

Total Electrical Equipment

1,024,000

Euro/p.e./y

0.012

0.99

134,069

0.433

32

3.85

59,489

0.021

14

1.71

5,043

0.002

0.14

4. Consumable Cost

45,403

0.016

11

1.30

5. Maintenance Cost

121,732

0.043

29

3.50

6. Other Yearly Cost

17,250

0.006

0.50

417,486

0.534

100

11.99

3.1 Sludge Disposal Cost


3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

34,500

2. Energy Cost

7,449,590

Total net

Euro/y

European Union

Page 71

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Darmanesti

MoE

European Union

Page 72

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Darmanesti Water Balance

MoE

European Union

Page 73

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Darmanesti
Water Supply

Description

Wastewater Disposal
Investment
[]

Description

Investment
[]

Network extensions

368,100

Network extensions

Total investment FS WS Darmanesti

368,100

Pumping stations

570,000

Pressure lines

400,000

WWTP
Total investment FS WW Darmanesti

MoE

European Union

12,986,011

5,026,520
18,892,531

Page 74

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Extension Darmanesti

MoE

European Union

Page 75

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Connection Rate 90% 93%

MoE

European Union

Page 76

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Darmanesti WW Measures


Network extensions
Sewer DN 250 - DN 600

50,590

Sum
12,986,011
[Euro]

Sum
[Euro]

15

pcs.

Sum
[Euro]

570,000

Sum
[Euro]

400,000

Network rehabilitation
Sewer rehabilitation
Pumping Stations
PS
Pressure lines
Pressure line DN 100

5,000

WWTP
Darmanesti Civil parts
Darmanesti E/M parts
Total WWTP

Connection Rate 1% 90%

MoE

Total Investment FS
Total Investment MP

European Union

3,034,035
1,992,485
Sum
5,026,520
[Euro]
[Euro]
[Euro]

Page 77

18,982,531
16,029,000

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Baseline Data

Settlement

Salatruc
Darmanesti
Lapos
Darmaneasca
Plopu
Pagubeni
Total

Total Capita

Compliance
Phase 1

Compliance
Phase 2

Compliance
Phase 3

2015

2018

2037

864

864

10,099

10,099

1,067

1,067

362

362

1,554

1,554

424

424

14,370

11,528

Cumulated
Capita
Percent

MoE

European Union

80%

2,842

11,528

14,370

80%

100%

Page 78

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

Design Parameter

Unit

p.e.

mg/l

Dry Weather Flow

m3/d

4,647

BOD5

--

25

m3/h

282

COD

--

125

SS

2,000 10,000

60

70

Max. Storm Weather Flow

m3/h

500

> 10,000

35

90

kg BOD/d

1,292

10,000 100,000

80

Biological design capacity (Raw


Water Inflow)

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

p.e.

21,530

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

1,696,052

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 79

Value

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Layout Plan

MoE

European Union

Page 80

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Flow Scheme Wastewater Treatment

MoE

European Union

Page 81

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Flow Scheme Sludge Treatment

MoE

European Union

Page 82

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Darmanesti Investment and O&M cost


Investment Cost

Investment Cost

Total Civil Works

Total Mechanical Equipment

Total Electrical Equipment

O&M Cost

O&M Cost

Euro

Euro/p.e./y

1. Personnel Cost

27,600

0.016

10

1.28

2. Energy Cost

82,889

0.444

29

3.85

1,373,000

3.1 Sludge Disposal Cost

36,822

0.022

13

1.71

619,485

2,891

0.002

0.13

4. Consumable Cost

28,279

0.017

10

1.31

5. Maintenance Cost

90,115

0.053

32

4.19

6. Other Yearly Cost

13,800

0.008

0.64

282,397

0.562

100

13.12

3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

3,034,035

5,026,520

Total net

Euro/y

European Union

Page 83

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Targu Ocna

MoE

European Union

Page 84

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Targu Ocna


Water Supply

No Water Supply Measures CF because CR >


90 %

Wastewater Disposal
Description
Network extensions

6,881,783

Pumping stations

342,000

Pressure line

440,000

WWTP
Total investment FS WW Targu Ocna

MoE

Investment
[]

European Union

3,962,130
11,625,913

Page 85

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

Agglomeration Targu Ocna WW Measures


Network extensions
Sewer DN 250 - DN
300

25,650

Sum [Euro]

6,881,783

Sewer rehabilitation

Sum [Euro]

Pumping Stations
PS

pcs.

Sum [Euro]

342,000

Sum [Euro]

440,000

Network
rehabilitation

Pressure lines
Pressure line DN 100
WWTP
Targu Ocna Civil
parts
Targu Ocna E/M
parts
Total WWTP

5,500

2,306,776
1,655,354
Sum [Euro]

3,962,130

[Euro]
[Euro]

11,625,913
6,296,728

Total Investment FS
Total Investment MP

Connection Rate 43% 90%


MoE

European Union

Page 86

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Baseline Data

Settlement

Total Capita

Compliance Compliance Compliance


Phase 1
Phase 2
Phase 3
2015

Targu Ocna
Valcele
Poieni
Bogata
Total

2018

10,922

10,922

1,217

1,217

932

932

1,217

1,217

14,288

12,139

Cumulated
Capita
Percent

MoE

European Union

2037

85%

2,149

12,139

14,288

85%

100%

Page 87

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Effluent Concentrations & Main Design Parameter


Effluent Concentrations

Main Design Parameters

The Urban Wastewater Treatment Directive 91/271/EEC which has been implemented in
the Romanian standard NTPA 001 011 stipulate the following discharge criteria.

Plant Size

Effluent
Concentration

Minimum percentage
of reduction

Design Parameter

Unit

p.e.

mg/l

Dry Weather Flow

m3/d

3,540

BOD5

--

25

m3/h

237

COD

--

125

SS

2,000 10,000

60

70

Max. Storm Weather Flow

m3/h

424

> 10,000

35

90

kg BOD/d

956

10,000 100,000

80

Biological design capacity (Raw


Water Inflow)

> 100,000 or sensitive areas

80

Capacity of WWTP in Population


equivalent BOD5

p.e.

15,926

10,000 100,000

15

70 - 80

Total volume of wastewater treated in


WWTP (yearly average at the outlet of
WWTP)

m3/a

1,292,141

Parameter

P
Total N (1)

> 100,000 or sensitive areas


10
70 - 80
(1)
Total nitrogen means: the sum of total Kjeldahl-nitrogen (organic N + NH4-N), nitrate
(NO3-N)-nitrogen and nitrite (NO2)-nitrogen.

MoE

European Union

Page 88

Value

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Layout Plan

MoE

European Union

Page 89

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Flow Scheme Wastewater Treatment

MoE

European Union

Page 90

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Flow Scheme Sludge Treatment

MoE

European Union

Page 91

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

WWTP Targu Ocna Investment and O&M cost


Investment Cost

Investment Cost

Total Civil Works

Total Mechanical Equipment

Total Electrical Equipment

O&M Cost

O&M Cost

Euro

Euro/p.e./y

1. Personnel Cost

20,700

0.016

10

1.30

2. Energy Cost

61,316

0.431

28

3.85

1,161,000

3.1 Sludge Disposal Cost

27,194

0.021

13

1.71

494,354

3,878

0.003

0.24

4. Consumable Cost

20,699

0.016

10

1.30

5. Maintenance Cost

72,728

0.056

34

4.57

6. Other Yearly Cost

10,350

0.008

0.65

216,866

0.552

100

13.62

3.2 Screenings and Grit Disposal Cost

Total

MoE

Euro/m

2,306,776

3,962,130

Total net

Euro/y

European Union

Page 92

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

MoE

European Union

Page 93

TA for Preparation of 5 Projects in the Environment Sector


ISPA Measure 2005/RO/16/P/PA/001-2

MoE

European Union

Page 94

You might also like