You are on page 1of 16

MOHAMED SATHAK ENGINEERING

COLLEGE, KILAKARAI - 623806


PRINCIPALS MEETING
DATE : 19.1.2010

REQUIREMENTS
1. CLASS ROOMS 2. STAFF
3. TECHNICAL STAFF
4. SUPPORTING STAFF
5. INFRACTURE 6. ADMISSION
7. EXAM/TEST
8. DISPLINE / ATTENDANCE
9. PROGRAMMES/GUEST LECTURES
10. PLACEMENT
11. AMENITIES/STORES 12. FEES DUES
13. LIBRARY
14. ONLINE TEST
15. FINISHING SCHOOL 16. TIE-UP
17. TRAINING THE TRAINERS 18. QUARTERS
19. FULL-TIME DOCTOR/DISPENSARY 20. CAMPUS FENCING
21. TRAINING AT CHENNAI
22. UNIVERSITY RESULTS
23. INDUSTRIES/INSTITUTIONS
24. TEACHING LEARNING
PROCESS
25. ADDITIONAL COURSES/INTAKE

DEPARTMENT OF CIVIL ENGINEERING


Teaching staff 3 Nos with Specialization as follows :
1.Transportation Engg.
2.Geo technical Engg
3.Structural Engg
Supporting staff 3 Nos (Diploma in Civil Engg)
Infrastructure :
1.New lab (I) CAD Lab (II) Transportation Lab
2. Service needed for (I)Soil Engg Lab (II)
Surveying Lab
3.LCD Projector
4. Separate Drawing hall and Seminar hall.
5. Library books (require as per Latest revised
syllabus).
Additional Course : M.E Structural Engg

DEPARTMENT OF AERONAUTICAL ENGINEERING


Staff Required :
1. Teaching Staff
2. Supporting staff
3. Technical staff

2 Nos
1 No

Infrastructure :
1. Lab equipments Required
(i) Jet Engine
(ii) Metal Air craft
2. LCD Projector.

1 No

DEPARTMENT OF COMPUTER
APPLICATIONS(MCA)
Staff Required :
1. Teaching Staff
4 Nos
2. Technical staff
1 No
(Lab Asst with Diploma Qualification)
Infrastructure :
1. One new Lab with 55 latest configuration computer
systems Required

2. LCD Projector - 1 No.


3. For Department Library room has to be furnished.

DEPARTMENT OF PHYSICAL EDUCATION


Two Coaches are required.
One P IV Computer system and Printer are
required.
Patch work should be done in the Basket ball
court.
Flood Light facilities should be needed in the
Kabaddi court.

DEPARTMENT OF ELECTRONICS AND COMMUNICATION


ENGINEERING
Teaching staff : Asst Professor -2 Nos, Professor
2 Nos
Supporting staff 1 No
New lab for OOD semester - Embedded system
Lab
Additional Class room for M.E
staff cabin
Chairs for computer Lab (60 Nos)
Almirah 2 Nos

DEPARTMENT OF FIRST YEAR B.E/B.TECH


NON TEACHING I SUPPORTING STAFF
INFRASTRUCTURE :
1. EXTENSION OF PHYSICS LABORATORY FOR DARK
ROOM
SETUP
2. CAD LAB FOR FIRST YEAR B.E/B.TECH
3. DRAWING HALL FOR EXCLUSIVELY FOR FRIST YEAR
B.E/B.TECH
4. SPACE FOR PROPOSED NATO SCIENCE RESEARCH
LAB.

DEPARTMENT OF ARCHITECTURE
Teaching staff 2 nos with Specialization OF PG
qualification.
Infrastructure :
1. Additional Drawing hall is required for first
year B-Arch.
2. Model making lab and store room.
3. Library books (require as per Latest revised
syllabus).
4. Display board for class room has to be replaced.
5. Lab : 20 PIV computer systems are requird for CAD
lab along with upgradation of existing 20 systems.
2 - Nos of A3 Color Printer are required.
6. Drawing boards have to be repaired.

DEPARTMENT OF COMPUTER SCIENCE &


ENGINEERING

Teaching staff 7 nos (PROF-2, A.PROF-3,LECT-2)


Technical staff 2Nos (Hardware Engg)
Supporting staff 1 no (Lab asst)
Infrastructure :
1.Class room 1(for second year M.E)
2. Computers - Client Machine (60 Nos Quad Core)
Server Machine (4 Higher End IBM)
3. Computer Chairs 220 Nos
Software's:
1) Oracle (Latest Version) Multi User.
2) Adobe Products - Multi User
3) Macromedia Products - Multi User
4) Turbo C,C++ - Multi User
5) Micro Processor simulator 8085/8086 - Multi User
6) Rational Rose Suite 30 users

DEPARTMENT OF INFORMATION
TECHNOLOGY
Teaching staff 3 nos (PROF-1, A.PROF-2)
Technical staff 1Nos (Hardware Engg)
Supporting staff 1 no (Lab asst)
Infrastructure :
1. Computers - Client Machine (20 Nos Quad Core)
Server Machine (2 Higher End IBM)
2. Computer Chairs 70 Nos
3. Department Library hall 1 No
Software's:
1) Oracle (Latest Version) Multi User.
2)
3)
4)
5)
6)

Turbo C,C++ - Multi User


Adobe Products - Multi User
Macromedia Products - Multi User
Micro Processor kit (8085,8086,Interface) -10 Nos
Rational Rose Suite 30 users

RESULT ANALYSIS IN PERCENTAGE


DEPT

SECOND YEAR
PREV
CURR
NOV 08
NOV 09

THIRD YEAR
PREV
CURR
NOV 08
NOV 09

AERO

57

57.7

ARCH

32

20

66.7

CHEM

66.6

30

----

CIVIL

8.3

35.7

CSE

28

ECE
EEE

FOURTH
YEAR
PREV
CURR
NOV 08
NOV 09

96.6

58

52

100

100

71

---

----

21.2

43.75

65.6

66.7

49.5

32

38

50

63

25.5

70

32.7

43.68

49

51

19.5

44.23

28

48

20

30

FIFTH
YEAR
PREV
CURR
NOV 08
NOV 09

100
23.8

RESULT ANALYSIS IN PERCENTAGE


SECOND
DEPT

YEAR
PREV
CURR

IT

29.6

MARINE

MECH

PREV
CURR

43.75

31.8

FOURTH
YEAR
PREV
CURR

40.6

40

23

35

45

59.26
25.5

MBA
MCA

THIRD YEAR

34.62
66.6

63

68

61

73

Computer Support Group


Hardware Engineers

2 Nos

System Details Over All Campus :


SYSTEM
PIII
PIV
CORE 2 DUO
QUAD CORE
SERVER
TOTAL SYSTEMS

NO OF MACHINES
26
163
86
180
4
------------433
-------------

PLACEMENT AND TRAINING


Training staff
1No
Communication staff 1No
Infrastructure :
1. Placement Hall
2. Placement Cell room
3. Visiting card for Placement Officers & C0-Ordinators
4. Printer
CAMPUS INTERVIEW YEAR 2008 - 2009
COMPANY NAME
KALAM SOFTWARE
SLASH SUPPORT

NO. OF STUDENTS
SELECTED
5
19

ALLIANCE INSURANCE

C & O COAL & OIL


ENERGY
TOTAL STUDENTS
CONTRIVE INFOTECH
62
LTD

18
18

OFF CAMPUS :
COMPANY NAME

NO. OF STUDENTS
SELECTED

STAR CEMENTS

SPECTRUM SOFTWARE

INTEGRATED WIRELESS
SOLUTION

TOTAL

12

You might also like