CONCEPT OF TG

PARALLEL WITH
GRID

TG parallel with grid feedback is given to


steam governing system and to generator AVR.
Based on the ON/OFF status of TG parallel with
grid feedback, governing system changes its
mode of operation between speed control mode
& mw control mode.
Based on the ON/OFF status of TG parallel with
grid feedback, generator AVR changes its mode
of operation between voltage control mode &
power factor control mode.
To under stand how and from where the TG
parallel with grid feedback is taken, it is
required to go through switchyard scheme and
the breakers associated to create path between
TG and grid to export power.

SEL switchyard is built with BREAKER AND


HALF configuration. SLDs in following slides will
give a better idea about power export pattern in
different conditions.
1. All breakers are in OFF position.
2. All four Units are running and both transmission
lines are available for exporting power to grid.
3. Generator protection operated and GCB-1
tripped.
4. GT-1, UAT-1 protection operated and GCB-1,
GTCB-1 and TIE-1 breakers tripped.
5. When SEL to Nellore Pooling Station line is
tripped, total power will be exported through
SEL to MEPL inter connection line and there will
not be any disturbance to running units.
6. When SEL to MEPL inter connection line tripped,
total power will be exported through SEL to

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

LINE-2

TIE-1

BUS-2

LINE-3
ALL
BREAKE
RS ARE
TIE-3
IN OFF
POSITI
ON
GTCB-3

TIE-2

GTCB-1

89-17

GTCB-2

LINE-4
TIE-4

GTCB-4

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

89-17

BUS-2

ALL 4
LINE-1
LINE-2
LINE-3
LINE-4
UNITS
ARE
RUNNIN
TIE-1
TIE-2
TIE-3
TIE-4
G AND
TWO
T/M
GTCB-3
LINES
GTCB-4
GTCB-1
GTCB-2
ARE
AVAILAB
BUS-1
LE
89-18
403 89- I
406 89-I
415 89-I
418 89-I
T
T
T
T
GT-1
GT-3
GT-4
GT-2
GCB-1

GEN-1

GCB-2

GEN-2

GCB-3

GEN-3

GCB-4

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

LINE-2

TIE-1

BUS-2

LINE-3
GENERAT
OR-1
PROTECTI TIE-3
ON
OPERATE
D AND
GTCB-3
GCB-1
TRIPPED

TIE-2

GTCB-1

89-17

GTCB-2

LINE-4
TIE-4

GTCB-4

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

TIE-2

GTCB-1

BUS-2

GT/UAT
PROTECTI
LINE-3
ON
OPERATE
D AND
TIE-3
GT, TIE
&GCB
TRIPPED
GTCB-3

LINE-2

TIE-1

89-17

GTCB-2

LINE-4
TIE-4

GTCB-4

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

LINE-2

TIE-1

NPS
LINE
TRIPP
ED

TIE-2

GTCB-1

89-17

BUS-2

GTCB-2

LINE-3

LINE-4

TIE-3

TIE-4

GTCB-3

GTCB-4

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

89-17

LINE-2

TIE-1

TIE-2

GTCB-1

MEPL
I/C
LINE
TRIPP
ED

GTCB-2

BUS-2

LINE-3

LINE-4

TIE-3

TIE-4

GTCB-3

GTCB-4

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NPS LINE MEPL I/C LINE


89-1

89-2I

LINE-1

89-17

LINE-2

TIE-1

LINE-3

LINE-4

TIE-3

TIE-4

GTCB-3

GTCB-4

BOTH
LINES
TRIPP
ED

TIE-2

GTCB-1

BUS-2

GTCB-2

BUS-1

403 89- I
T
GT-1

406 89-I
T

GCB-1

GEN-1

89-18

GT-2

415 89-I
T
GT-3

418 89-I
T
GT-4

GCB-2

GCB-3

GCB-4

GEN-2

GEN-3

GEN-4

NUMBER OF PATHS AVAILABLE FOR TG-1 TO EXPORT POWER TO


GRID
1) GCB-1, 401 89-T, TIE-1, 89-1
2) GCB-1, 401 89-T, GTCB-1, GTCB-2, TIE-2, LINE-2, LINE-1, 89-1

3) GCB-1, 401 89-T, GTCB-1, 89-18, GTCB-3, TIE-3,LINE-3, 89-17,


LINE-1, 89-1

4) GCB-1, 401 89-T, GTCB-1, 89-18, GTCB-4, TIE-4,LINE-4, 89-17,


LINE-1, 89-1
5) GCB-1, 401 89-T, GTCB-1, GTCB-2, TIE-2, 89-2
6) GCB-1, 401 89-T, TIE-1, LINE-1, LINE-2, 89-2

7) GCB-1, 401 89-T, GTCB-1, 89-18, GTCB-3, TIE-3,LINE-3, 89-17,


LINE-2, 89-2

8) GCB-1, 401 89-T, GTCB-1, 89-18, GTCB-4, TIE-4,LINE-4, 89-17,


LINE-2, 89-2

TG-1 IN PARALLEL WITH GRID


GCB1

401
89-T

TIE1
GTCBGTCBTIELINELINE
2
2
2
-1
89-1
GTCBTIE- LINE89-17
3
3
3
18
GTCBTIE- LINE4
4
4
GTCBGTCBTIE1
2
2
TIELINE
LINE1
-1
2
GTCBGTCBTIE- LINELINE89-18
89-17
1
3
3
3
2
GTCBTIE- LINETIELINE
4
4
4
1
-1
89LINETIEGTCBGTCB89-17
3
3
3
2
18
LINETIEGTCB4
4
4

891

892

TIE2

Number of contacts to be taken into line for


TG in parallel with Grid when line-1 and line-2

TG-1 IN PARALLEL WITH GRID


GCB1

401
89-T

TIE1
GTCB1

Number of contacts to be taken into line for


TG in parallel with Grid when line-1 and line-2
breakers are excluded from the circuit

NUMBER OF PATHS AVAILABLE FOR TG-2 TO EXPORT POWER TO


GRID
1) GCB-2, 404 89-T, TIE-2, LINE-2, LINE-1, 89-1
2) GCB-2, 404 89-T, GTCB-2, GTCB-1, TIE-1, 89-1

3) GCB-2, 404 89-T, GTCB-2, 89-18, GTCB-3, TIE-3,LINE-3, 89-17,


LINE-1, 89-1

4) GCB-2, 404 89-T, GTCB-2, 89-18, GTCB-4, TIE-4,LINE-4, 89-17,


LINE-1, 89-1
5) GCB-2, 404 89-T, TIE-2, 89-2
6) GCB-2, 404 89-T, GTCB-2, GTCB-1, TIE-1, LINE-1, LINE-2, 89-2

7) GCB-2, 404 89-T, GTCB-2, 89-18, GTCB-3, TIE-3,LINE-3, 89-17,


LINE-2, 89-2

8) GCB-2, 404 89-T, GTCB-2, 89-18, GTCB-4, TIE-4,LINE-4, 89-17,

NUMBER OF PATHS AVAILABLE FOR TG-3 TO EXPORT POWER


TO GRID
1) GCB-3, 415 89-T, TIE-3, LINE-3, 89-17, LINE-1, 89-1
2) GCB-3, 415 89-T, GTCB-3, 89-18, GTCB-1, TIE-1, 89-1
3) GCB-3, 415 89-T, GTCB-3, 89-18, GTCB-2, TIE-2,LINE-2, LINE1, 89-1
4) GCB-3, 415 89-T, TIE-3,LINE-3, 89-17, LINE-2, TIE-2, GTCB-2,
GTCB-1,TIE-1, 89-1
5) GCB-3, 415 89-T, GTCB-3, GTCB-4, TIE-4,LINE-4, 89-17, LINE1, 89-1
6) GCB-3, 415 89-T, TIE-3,LINE-3, LINE-4, TIE-4, GTCB-4, 89-18,
GTCB-1, TIE-1, 89-1
7) GCB-3, 415 89-T, TIE-3,LINE-3, 89-17, LINE-2, 89-2
8) GCB-3, 415 89-T, GTCB-3, 89-18, GTCB-2, TIE-2, 89-2
9) GCB-3, 415 89-T, GTCB-3, 89-18, GTCB-1, TIE-1,LINE-1,LINE-

NUMBER OF PATHS AVAILABLE FOR TG-4 TO EXPORT POWER


TO GRID
1) GCB-4, 418 89-T, TIE-4, LINE-4, 89-17, LINE-1, 89-1
2) GCB-4, 418 89-T, GTCB-4, 89-18, GTCB-1, TIE-1, 89-1
3) GCB-4, 418 89-T, GTCB-4, 89-18, GTCB-2, TIE-2,LINE-2, LINE1, 89-1
4) GCB-4, 418 89-T, TIE-4,LINE-4, 89-17, LINE-2, TIE-2, GTCB-2,
GTCB-1,TIE-1, 89-1
5) GCB-4, 418 89-T, GTCB-4, GTCB-3, TIE-3,LINE-3, 89-17, LINE1, 89-1
6) GCB-4, 418 89-T, TIE-4,LINE-4, LINE-3, TIE-3, GTCB-3, 89-18,
GTCB-1, TIE-1, 89-1
7) GCB-4, 418 89-T, TIE-4,LINE-4, 89-17, LINE-2, 89-2
8) GCB-4, 418 89-T, GTCB-4, 89-18, GTCB-2, TIE-2, 89-2
9) GCB-4, 418 89-T, GTCB-4, 89-18, GTCB-1, TIE-1,LINE-1,LINE-

IMPORTANCE OF TG parallel with grid FEEDBACK


TO GOVERNOR

Turbine rolling will be carried out using Governor speed


control mode till the turbine reaches its rated RPM and
synchronization of TG with grid. Once the TG got
synchronized with grid the TG parallel with grid command
will be fed to steam governing system and Governor changes
its mode of operation to MW control mode. Governor remains
in the same mode as long as the TG parallel with grid ON
feedback is available. As soon as Governor receives TG
parallel with grid OFF command, it changes its mode to
speed control mode and tries to maintain rated RPM of
turbine to sustain the unit with home load. To bring back the
turbine to rated RPM Sudden opening or closing of governor
valve will be taken place up to required level depends on
current running RPM of turbine. Time delay in receipt of TG
parallel with grid OFF command to Governor plays a very
crucial role in controlling turbine RPM.

EH OIL

ICONVERTO
R
100%

GOVERNOR IN
MW CONTROL
MODE

75%

TG
PARALLE
L WITH
GRID
ON

50%
25%
0%

GOVERNING VALVE
STEAM

MW
TR
SPEED SENSOR

CT
&P
T
TURBINE

GRI
D
CB CLOSED

ALTERNATOR

EN UNIT IS RUNNING WITH FULL LOAD AND EXPORTING POWER TO GRID

EH OIL

ICONVERTO
R
100%
75%

GOVERNOR IN
SPEED CONTROL
MODE

50%

TG
PARALLEL
WITH
GRID
OFF

25%
0%

GOVERNING VALVE
STEAM

MW
TR
SPEED SENSOR

CT
&P
T
TURBINE

GRI
D
CB CLOSED

ALTERNATOR

WHEN UNIT IS ISOLATED FROM GRID

IMPORTANCE OF TG parallel with grid FEEDBACK


TO AVR
AVR will be in voltage control mode till the
synchronization of TG with grid. Once the TG got
synchronized with grid the TG parallel with grid
command will be fed to AVR and its mode of
operation changes to Power factor control mode.
AVR remains in the same mode as long as the TG
parallel with grid ON feedback is available. As
soon as AVR receives TG parallel with grid OFF
command, it changes its mode to voltage control
mode and tries to maintain rated voltage of
Generator using droop control to sustain the unit
with home load. Time delay in receipt of TG
parallel with grid OFF command to AVR plays a
very crucial role in controlling Generator voltage
before it reaches the trip limit of Over/Under
voltage protection.

THANK YOU