The 20th

CONFERENCE OF
THE ELECTRIC
26-30 OCTOBER
2014
POWER
SUPPLY
INTERNATIONAL CONVENTION
INDUSTRY
CENTRE JEJU KOREA
TRIANGULAR
COORDINATION
BETWEEN UTILITY,
Ignatius Rendroyoko
SUPPLIER
&
PT PLN (Persero) - Indonesia
CONTRACTOR
PT PLN
(Persero)

PLN CORPORATE
INFORMATION

April 2014

Jawa Bali
Sumatera
East
Indonesia
Total

Customer >
14kVA

MWh

282.863 19.025.632
52.775
1.757.233

USD
1.650.131.626
157.343.288

45.590
905.914
92.478.534
381.228 21.688.779 1.899.953.448

PLN Customers : 55.239.704

THE WORLD BANK : GETTING


ELECTRICITY
BEST

BEST
PERFORME
INDONESIA INDONESIA
PERFORME
INDICATOR
R ASIA
DB2013
DB2012
R
PACIFIC
GLOBALLY
2013
Rank

147

158

Hongkong
SAR, China
(4)

Procedure
(numbers)

Timor Leste
(3)

Germany
(3)

Time (days)

108

108

Taiwan,
China (24)

Germany
(17)

1.379,00

Hongkong
SAR, China
(1,6)

Japan (0.0)

Cost (% of
Income per
capital)

1.243,80

Iceland (1)

PLN PLAN : GETTING ELECTRICITY


IMPROVEMENT
Conducting business process analysis of
new customer connection
Carry out the verification of the
implementation of business processes in
the field
Analyzing the working relationship between
utility suppliers and contractors
Developing a new business model that is
more simple and support the acceleration of
the process

BUSINESS PROCESS : NEW


CONNECTION (1)

BUSINESS PROCESS : NEW


CONNECTION (2)

DEVELOPMENT OF NEW
COOPERATION MODEL
1. Procurement process
2. Distribution equipment material
transport to PLN Warehouse
3. Material quality control on the
delivery
4. On work order of new
connection, contractor will take
material from PLN warehouse
5. Contractor carry out installation
on customer premises
6. Checks installation work

DEVELOPMENT OF NEW
COOPERATION MODEL

RESPONSIBILITIES IN NEW BISPRO


No.
1.
2.
3.
4.

5.
6.

Activity
Online Monitoring Stock
Material
Purchase Order (PO)
Quality Control (QC)
Management
Work order (WO)
management
a. Supervision of quality
and quantity of
b. Project supervision
Material retour management
Report Management

Manufact
Contra
PLN urer /
ctor
Supplier

NA

NA

NA
NA
NA

SOLUTION : CENTRALIZED AMR


SYSTEM

Centralized
Terpusat

CENTRALIZED AMR
SYSTEM
PLN AP2T

Designed
for
connecting
300.000
customer
meters
troughout
Indonesia

The selection of centralized AMR system based on numbers of meter type, numbers of customers,
integration to AP2T, kind of features, communication media, web based appplication and tech support

TYPE OF METERS
PROTOCOLS
Centralized
AMR system must be able to communicate with different
types of Energy Transaction Meters that have been used in PLN :

BRAND

AGENT

TYPE

EDMI

Edmi Indonesia

MK 6, MK 10, MK 3

ACTARIS

Mecoindo

SL7000, ACE6000

LANDYS+GYR

ZMD, ZMG

ISKRAMECO

Enertelindo Kencana

MT830, MT831,
MT860, MT372

WILIS

Flash Mobile

E3201, E30605

CHANGSA

PT. Electra Inti


Perkasa

Wasion DTSD 341,


iMeter310

ELSTER

Bara Daya Nusantara

A1700

PRODIGY

Akurasi Solusindo

PRODIGY

PILOT PROJECT : PLN


PLN East Java was chosen to be the pilot project due to
DISJATIM
reasons:

PLN East Java has a fairly large


number of customers (14,000
customers) are connected in the
AMR system
AMR Application systems in East Java
PLN has been appointed as the
application for centralized AMR
System
Readiness of human resources, and
management commitment
Availability of telecommunications
infrastructure and mobile operators

1.
2.
3.
4.
5.
6.
7.
8.

Billing Standmeter Data


Load Profile Data
Frequency and duration of
outages
Maximum power consumption
data
Instantaneous measurement
data
Data of Energy Usage
Harmonic Distortion Data
Suspected Ilegal Usage

STEPS IN THE PILOT PROJECT


Development of Centralized AMR System Application
Migration of Communication Application from CSD system
to GPRS TCP/IP
Upgrading and Installation Hardware for AMR Centralized
Control Center
Master data migration of existing AMR to centralized AMR
System data base:
Gradual change in meter read of AMR GPRS to Centralized
AMR control center
User Acceptance Test (UAT)

NEXT STEPS IN THE PILOT PROJECT


FAILURE CAUSE

RECOMMENDED ACTION

MODEM OFFLINE

Check the modem and do repairs, and the


signal at the location of customer meters

FAIL TO LOGIN

Check Password and communicatin


connection between Modem and Meter

UNREGISTERED CCID

Register CCID Modem into the PLN Gateway

FAILURE ON GPRS /
METER

Check provider signal and sim card, and


replace if its damage
Subscribe private lines of communication
mobile operators

CONCLUSIONS
PLN can focus on business electricity
The servers and the applications that are used together
to reduce the cost of HW / SW are currently scattered in
every distribution
It only takes one network link data to each mobile
operator so will reduce the cost of leased line
PLN data base of meter reading will more safe
and secure, because the existence and
management of data by PLN
AMR management costs as a whole will be
more efficient

THANK YOU