Professional Documents
Culture Documents
02/12/15
Huawei Confidential
Overview of APM30
APM30
cabinet
Extended
battery
cabinet
For user
devices
For batteries
Huawei Confidential
Page 2
Installation Procedure
Huawei Confidential
Page 3
Expansion bolt
Huawei Confidential
Page 4
Huawei Confidential
Page 5
Huawei Confidential
Page 6
PMU
Huawei Confidential
Page 7
PMU
Huawei Confidential
Page 8
Huawei Confidential
Page 9
L wire of the AC
input power cable
N wire of the AC
input power cable
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
Page 10
PGND cable
PGND cable
Huawei Confidential
Page 11
Huawei Confidential
Page 12
Active BBU3806
Huawei Confidential
Page 13
Standby BBU3806
Huawei Confidential
Page 14
Huawei Confidential
Page 15
Huawei Confidential
Page 16
Inter-BBU3806 cable
Huawei Confidential
Page 17
Grounding the
shielding layer of
the E1/T1 cable
Huawei Confidential
Page 18
Installing the CPRI Optical Cable Between the BBU and the RRU
Huawei Confidential
Page 19
Huawei Confidential
Page 20
12 V 50 Ah battery
RTN(+) power cable
Huawei Confidential
Page 21
Huawei Confidential
Page 22
Page 23
Installation Check
SN
Item
Check whether all bolts are tightened with flat washers and spring washers.
Check whether there is no redundant material in the cabinet. If any, clear it.
Check whether the cabinet is collided to injury and if the paint is intact.
If there is injury, repaint it immediately to prevent corrosion.
Check whether the power cables are correctly and securely connected.
Huawei Confidential
Page 24
Security Level:
02/12/15
Thank You
www.huawei.com
www.huawei.com
Huawei Confidential