Progress and
Performance
Measurement
and Evaluation
McGraw-Hill/Irwin
13-2
System Structure
and reporting
Cumulative
Trends
Problems and Issues Since Last Report
Actions
Action Planned
13-5
Project
1.
2.
3.
4.
Control Steps
charts
FIGURE 13.1
13-8
FIGURE 13.2
13-9
Baseline Plan
Corrects
Earned
An
Glossary of Terms
EV
PV (Planned Value)
AC
The actual cost of the work completed. The sum of the costs
incurred in accomplishing work. (ACWPactual cost of the
work performed).
13-11
Glossary of Terms
CV
SV
BAC
EACre
Glossary of Terms
ETC
Estimate to complete.
VAC
Or, alternatively, cost variance at completion (BACEACf), where EACf is derived from a formula using
actual and earned value costs.
VAC indicates expected actual over-or underrun cost
at completion.
13-13
Developing an Integrated
Cost/Schedule System
1.
2.
3.
Scope
Work packages
Deliverables
Organization units
Resources
Budgets
Schedule resource to activities
Time-phase work packages into a network
Developing an Integrated
Cost/Schedule System
1.
2.
Scope
b.
Work packages
c.
Deliverables
d.
Organization units
e.
Resources
f.
Budgets
b.
3.
Develop a time-phased
budget using work packages
included in an activity.
Accumulate budgets (PV).
4.
5.
6.
13-15
FIGURE 13.3
13-16
of a Baseline (PV)
Labor
Equipment
Materials
Project
13-18
Costs
Earned Value
With
Status of a Project
Required
data elements
Variance (CV)
Indicates
Schedule
Variance (SV)
Presents
13-21
Cost/Schedule Graph
FIGURE 13.4
13-22
FIGURE 13.5
13-23
FIGURE 13.6
13-25
FIGURE 13.7
13-26
FIGURE 13.8
13-27
TABLE 13.1
13-28
13-29
13-30
FIGURE 13.9
13-31
FIGURE 13.10
13-32
Digital Camera
Project Rollup at
End Period 7
(000)
FIGURE 13.11
13-33
Indexes
Complete Indexes
Interpretation of Indexes
TABLE 13.3
13-35
Indexes
Periods 17
FIGURE 13.12
13-36
Schedule
percent rule
rule
13-38
13-40
TCPI=
BAC - EV
BAC AC
FIGURE 13.13
13-43
Key Terms
Base line budget
Control Chart
Cost performance
index (CPI)
Cost variance (CV)
Earned Value (EV)
Estimated cost at
completion (EACre)
Percent complete index
Schedule performance
index (SPI)
Schedule variance (SV)
Scope creep
To complete performance
index (TCPI)
Tracking Gantt chart
Variance at completion (VAC)
13-44