Professional Documents
Culture Documents
Semester
Assessment Criteria
Topics
Group
Individual
Contributio
Contribution
n
General Aspects
Energy Recovery and Utility Design
Environmental Protection Process
30%
Safety
Process Operation and Control
Economic Evaluation
Piping & Instrument Diagram,
10%
General Arrangement
Final Report & Oral Assessment
15%
Total
80%
H83DPX Design Project
15%
5%
20%
Equipment Design
Major Equipment Design Expert
Team
Reactor
Separation System
Distillation Column (including reboiler & condeser)
Supervisor
Heat Exchanger
Pump
Compressor
Gas Liquid Separator, etc.
H83DPX Design Project
Major Equipment
Reactor
Design
Catalyst selection, properties
Tube and Catalyst Particle size
Reactor selection (with good justification,
advantages, disadvantages, etc.)
Reaction kinetics with appropriate reference
Rate Law and Net
rate
Selectivity and yield
Weight of catalyst with detailed calculations and
method
Major Equipment
Reactor
Design
Proper design equation
Catalyst and reactor volume
Actual reactor dimension
Pressure Drop and its importance
Space time and its importance
Design Code
Material of construction for Different Parts (with good
justification and reference)
Design temperature and pressure
Head type
H83DPX Design Project
Major Equipment
Design
Reactor
No need include
Major Equipment
Design
Separation System
Estimation of number of stages, reflux, L/G
ratio (for absorber)
Operating conditions
Selection of best combination (optimisation)typically relating these to cost.
Plate spacing, efficiency, consideration of
deviations like flooding, entrainment etc.
Estimation of column diameter, type of
packing/plate, etc.
H83DPX Design Project
Major Equipment
Design
Separation System
No need include
Thickness of plates/column
No of bolts
Skirt specifications
Support etc.
Important Point
The above equipment design criteria
Other Schedule
Week
1
2
3
4
Activity
Person in charge
Feedback on Preliminary Report
Supervisors
(By appointment)
10
Other Schedule
Week
7
Activity
Person in charge
Guest lecture process control
Ong Sze Pheng
(19 March 15 @ 2 5 pm)
(F3A08)
8
Guest lecture economic analysis
Dominic Foo
(26 March 15 @ 2 5 pm)
9
Guest lecture by Safety Design
Industrial speaker
*(2 April 15 @ 2 5 pm)
(F3A08)
10
11
12
13
Final Report submission
Denny Ng
(5th May 2015)
Examination
Oral assessment
Design team
Week
*(18 & 19 May 2015)
11