You are on page 1of 31

MOBILE CONTAINERISEDPRESSURTEST

BAY

UNITED NATIONAL OILFIED


SERVICES
WWW.UNOSOMAN.COM

CONTENTS
UNOS INTRODUCTION
UNIT GENERAL DESCRIPTION
FEATURES & BENEFITS
OUR CUSTOMERS
EQUIPMENTS PRESSURE TESTED
DESIGN STANDARDS
PHOTO GALLERY
CONTACT DETAILS

WWW.UNOSOMAN.COM

UNOS INTRODUCTION
A new generation start-up company with innovation and the determination to excel. UNOS

incorporates the expertise of foreign management support and experienced technical in-house
knowledge, to respond and provide the customer with enhanced solutions to the oil & gas
sectors.
Our core business activity is built around the emerging service sectors of Omans oil and gas
industry. UNOS services are initially focused on API Inspections, Lifting Inspections, WCE
verification Services, Drilling,workover,wireline,welltest,coil tubing inspection services, fishing
& Drilling tool rentals/trading, Mobile Repairs and pressure testing facility, Gauge Calibration
Services, Mobile Hard banding & rethreading services.
UNOS had tight in an official agency contract with foreign grade1 manufacturers of all drilling
tools in the world from the USA (Petra Drilling co) & China (King Rig International ).
Our Mobile Pressure Test Unit is fully contained with a 30ft long steel shipping container,
designed and manufactured with a high standard steel structures to be used in land based, safe
area use on its solid body, container walls are made up in solid body construction of about 3-4
layers of steel beams, tick woods, Aluminum layer, then steel beams at both ends. Its equipped to
pressure control equipments up to nominal 4 1/16 bore and maximum test pressure of 15,000
psi. and sample flasks to a maximum test pressure of 24,000 psi.

WWW.UNOSOMAN.COM

GENERAL DESCRIPTION

WWW.UNOSOMAN.COM

FEATURES & BENIFITS


Designed for land based, safe area use.
Equipped to pressurize control equipment up to nominal 4

1/16 bore
Maximum test pressure of 15,000 psi and sample flasks to a
maximum test pressure of 24,000 psi.
The test bay area is lined with replaceable impact absorbing
panels on walls, end doors and roof.
The operator controls testing from a cabin within the container
which is separated and protected from the test bay area.

WWW.UNOSOMAN.COM

FEATURES & BENIFITS


There is no window into the test bay area. Visibility is

provided by a CCTV system which incorporates a recording


facility.
The PTU is ASEP Elmar, Certified and approved by DNV
(Maxsafe), which provides 24,000psi test capability.
Access to load equipment into the test bay area is provided by
double doors at one end of the container
Craneage (1T.) is provided within the test bay to handle
equipment which is to be tested / repaired.
A landing area is provided at the doors to allow landing/ uplift
of equipment by forklift or similar.
WWW.UNOSOMAN.COM

FEATURES & BENIFITS


The area at the opposite end of the container from the double

doors contains the operator test cabin. A work area within the
test bay is equipped with a bench and storage cupboards.
There is a removable Baker vice which can be mounted at 2
points within the container.

WWW.UNOSOMAN.COM

FEATURES & BENIFITS


A personnel escape hatch is provided at the rear of the test

bay area.
Electrically driven air conditioning is provided in the operator
and test bay / workshop areas.
Fluorescent electric lighting is provided in the test bay, work,
and operator areas.
Electric power outlets are provided in the work area
Automatically operated flashing beacons are provided to
mount to the outside of the container
Service connections are provided in externally accessible
panels for compressed air inlet, 220V AC and 110V AC
electrical inlets, and electrical outlets for the flashing beacons
WWW.UNOSOMAN.COM

DESIGN STANDARDS
The Supply of Machinery (Safety) Regulations, 1992
The Electrical Equipment (Safety) Regulations, 1994
BSEN292: Part 1 & 2:1991, Safety of Machinery-Basic

concepts, general principles for design'.


BSEN982: Safety of Machinery-Hydraulics.
BSEN983: Safety of Machinery-Pneumatics. Designed and
Certified in accordance with: DNV 2-7-1 (2006): Offshore/on shore Containers.

WWW.UNOSOMAN.COM

OUR
CLIENTS
ARE:

Baker Hughes
Petrogas E & P
Midwesco
Shaleem Petroleum
Compass Oil Service
Scientific Drilling Company
Wilayat Key Energy
Ba-Omar Oilfield Services
Cactus Premier Drilling Service
Middle East Bridge
Al Baraka Oilfield Services
Distinct Energy
Al Shawamikh
MB Petroleum, Bahrain + Oman
Dalma Energy

WWW.UNOSOMAN.COM

CLIENTS BENEFITS
This unit will normally operate on top of the wheels as easy and convenient to carry

out all pressure test activities on clients premises with an aim of


minimizing/eliminating:
1. Clients NPT Saving (Non Productive Time)
2. 100% Logistics cost saving.
3. 100% safe pressure test operations in the field with surrounded people workers as
no work stoppage while performing pressure testing activities.
4. Minimizing of RTA (Road Traffic Accident) with reduction of many transporters on
the road, specially during intermediate inspections.
5. Multiple functions and activities can take place in this Container, Gauge
Calibration/repairs workshop, Rig/Hoist Handling equipments repair, service &
inspection/certifications.
6. Quicker/immidiate equipment's turnaround, redressing, pressure testing and
certification.
7.Electronic pressure chart recordings can be sent from the control room online to
any supervisor office while test is performed.
WWW.UNOSOMAN.COM

WHAT ARE THE EQUIPMENTS TESTED HERE??


The equipments subjected to be pressure tested on this container are mainly covering all

Drilling/Work over/Wireline/Well test/Coil Tubing Pressure WCEs equipments. but not


limited to what is described here, the example given here is mainly focused on
Drilling/Workover rigs:
Drilling adopter spools, back pressure manifold, hand on automatic choke, remote control
panels, function test RCU & Chokes, all types of valves lubricators, BOP Control units,
accumulator bottles, charge pumps, reserve tanks, high pressure systems, accumulator bank
isolation valves, manifold regulator valves, annular preventer regulator valves, manifold bypass valves,4 way valves, 3000-5000 psi by-pass test functions, Office/driller remote control
panels, pressure testing the control room for capacity verifications, choke lines coflex or
hoses,chicksens, single/double ram preventers, high pressure lines hoses or steel pipes, annular
Preventers, Kelly cocks, gray valves, drop in sub,floats,Kelly hoses, mud gas separators, mud
pump relieve valves, mud pump fluid end, pump discharge manifold, pulsation dampeners, all
power swivel pressure control components, side outlet valves, NRV,RV,Manual Valve,HCR
Valves, All TDS pressure control components. All well test/coil tubing/Wireline BOPs,
Crossovers.. etc
Wireline, well test, & coil tubing, Lubricators, Stuffing boxes, Pumping Subs, BOBs and
various sizes of crossovers.
WWW.UNOSOMAN.COM

PHOTO GALLERY
F

Internal View of Pressure Test Bay getting ready for Pressure testing of Coil Tubing BOP

WWW.UNOSOMAN.COM

PHOTO GALLERY

UNOS technician preparing the chart recorder before the Pressure Test
WWW.UNOSOMAN.COM

PHOTO GALLERY

Pressure Test Bay with Doors open and UNOS technician fixing the Hoses to the
CT BOP

WWW.UNOSOMAN.COM

PHOTO GALLERY

Operator Cabin with Wall mounted PTU and CCTV Display monitor

WWW.UNOSOMAN.COM

PHOTO GALLERY
The pressure test bay,
includes the
1.working bench
2. Baker Vice
3.Wall draws
4.all connections and
hand tools/special
tools toolbox

WWW.UNOSOMAN.COM

PHOTO GALLERY

Pressure
Test Unit.
Pumps
and its full
accessorie
s & Chartrecorder.

WWW.UNOSOMAN.COM

PHOTO GALLERY

Door
electromagnetism
devise, as the
primary safeguarding
system to prevent
any attempts of
opening the doors
during pressure
testing
commencements.
WWW.UNOSOMAN.COM

PHOTO GALLERY

Electric supply, can


be obtained
independently from
any portable
generators of about
220v-240V AC 5060Herts. OR in the
field using rig power
pack system/power
generators.
WWW.UNOSOMAN.COM

PHOTO GALLERY
Control room.
MaxSafe PTU, wall
mounted, consists of:

1. Electronic chart
recorder
2. USB recording port
3. Data Recording
device
4. Monitor/screen.
5. Joystick

WWW.UNOSOMAN.COM

PHOTO GALLERY
Monitor
Connected With
4 Cctv Camera
Inside The PTU Bay, It
Can Zoom From
All 4 Cameras In
Order To Get
The Best Images Or
Recording Modes
During Pressure
Testing Exercise
WWW.UNOSOMAN.COM

PHOTO GALLERY
Various size of
flanges welded
on still platform grids
to give a solid
hold to
pressure
testing
for different
equipments
WWW.UNOSOMAN.COM

PHOTO GALLERY

Cctv
Cameras

WWW.UNOSOMAN.COM

PHOTO GALLERY
Doors Thickness
And
It`s Safety
Hinges
Allocated
On Above
The Doors,
Central
Between Doors
And Bellow
WWW.UNOSOMAN.COM

PHOTO GALLERY
1.5 T Crain
Facility provided
To support and
lift All subjected
Equipment`s for
Pressure testing

WWW.UNOSOMAN.COM

PHOTO GALLERY
Escape Hatch In case of
any human trap inside the
pressure test bay, the
escape hatch is equipped
with pressure switch which
acts as a safeguard system
to dump the pressure in
case of any opening
attempts. Incase the hatch
is opened the pressure will
not build up and it shows
an open loop in its
operations logic,
WWW.UNOSOMAN.COM

PHOTO GALLERY

Ram Closing /Opening Pump


WWW.UNOSOMAN.COM

CONTACT DETAILS
For any queries and further information please

Contacts.
PO Box 126,PC 130,Madinat Sultan Qaboos, Sultanate of Oman.
Sultan Ali Ahmed Al-Busaidi
Managing Director
United National Oilfield Services
Tel :+968 22041075
Mobile :+968 97158338 /95338837
Emails :info@unosoman.com
:sultanbusaidi@unosoman.com

WWW.UNOSOMAN.COM

UNITED NATIONAL OILFIED SERVICES


THE COMPLETE INSPECTION SOLUTION
IN OIL & GAS SECTOR

WWW.UNOSOMAN.COM

ANY QUESTIONS???

WWW.UNOSOMAN.COM

You might also like