Professional Documents
Culture Documents
Agenda
Objectives
Challenges
Technology and features
Budget and development plan
Objectives
Development of low cost electronic slate
with distance education capability.
Development of complete distance
education system using the electronic
slate.
To launch the education solution on a large
scale.
Challenges
No access to education for rural and tribal
children.
No school / school faraway / daily
commuting not possible.
Difficult access to quality education for
urban slum dwellers.
Children of migrant labour, construction
workers do not stay at one place.
Challenges (Contd.)
To provide infrastructure for a few people
in each village is not economically feasible.
Steady brain-drain from villages to cities
over the last 6 decades.
Talent pool that can teach better is
concentrated in cities and towns.
Teachers unwilling to stay in villages.
PEDISTEL - Technology
Students device
Teachers setup
Detachable
Solar panel
Digital
slate
| |
||
||
Microphone
Application
Specific
Processor
Internet connectivity
(MODEM)
3
Touch screen
4
LCD screen
Flash Memory
Speaker
5
Solar Panel
Teachers setup
Training software on Laptop/
Desktop PC
Web-cam, tablet or touch screen.
Display divided in nine parts to
handle 9 students at a time.
Contents on slate or students face
shown in the window allocated.
Budget (3 years)
Sr.
Item
no.
I) Components procurement
Estimated cost
(Rs.)
4,00,000
3,60,000
7,00,000
7,00,000
V) Web-based solution
18,00,000
10,00,000
14,40,000
Total:
6,00,000
70,00,000
I)Components
procurement
Sr.
no.
Estimated cost
(Rs.)
Touch screen
20,000
GSM/GPRS/Broadband modem
20,000
10,000
5
6
Component
1,00,000
20,000
1,50,000
10,000
Solar panel
20,000
Total:
50,000
4,00,000
II)Assembly of demo
units
Sr.
no.
Item
60,000
2 PCB fabrication
1,00,000
3 Enclosure design
1,00,000
4 Enclosure fabrication
1,00,000
Total:
3,60,000
Item
Estimated cost
(Rs.)
1 Code development
2,00,000
2 Simulation tool
2,00,000
3,00,000
Total:
7,00,000
Equipment
Estimated cost
(Rs.)
4,50,000
2,50,000
Total:
7,00,000
Item
2,00,000
2,00,000
4,00,000
1,00,000
Total:
9,00,000
18,00,000
VI)Marketing
Methodology
Sr.
no.
Item
1 Field testing
5,00,000
2 Concept Testing
5,00,000
Total:
10,00,000
VII)Salary of project
engineers
Sr.
no.
Item
7,20,000
7,20,000
Total:
14,40,000
VIII)Contingency,
Consumables, Travel &
Miscellaneous
Sr.
no.
Item
Contingency
1,50,000
Consumables
1,50,000
Travel
2,00,000
Miscellaneous
1,00,000
Estimated cost
(Rs.)
Total:
6,00,000
Item
Hardware
development
engineer
Software
development
engineer
Total
I year
II year
III Year
2,40,000
2,40,000
2,40,000
2,40,000
2,40,000
2,40,000
4,80,000
4,80,000
4,80,000
Other recurring
expenses
I year
II year
III Year
Contingency
50,000
50,000
50,000
Consumables
50,000
50,000
50,000
Travel
1,00,000
50,000
50,000
Miscellaneous
50,000
25,000
25,000
2,50,000
1,75,000
1,75,000
Total:
I year
II year
III Year
4,80,000
4,80,000
4,80,000
Contingency
50,000
50,000
50,000
Consumables
50,000
50,000
50,000
1,00,000
50,000
50,000
50,000
25,000
25,000
7,30,000
6,55,000
6,55,000
Manpower
Travel
Miscellaneous
Total:
Financial outlay
(year-wise)
I Year
Non recurring
Recurring
Total:
II Year
III Year
21,60,000
18,00,000
10,00,000
7,30,000
6,55,000
6,55,000
28,90,000
24,55,000
16,55,000
Development plan
I year: Prototype slate to be
assembled, Verilog code to be ready.
II Year: Web-based solution to be
developed. Pilot project to be ready.
III Year: Full deployment across the
country.
Thank you!