STAGES OF INSPECTION FOR

CANOPY

FOUNDATION INSPECTION
MATERIAL INSPECTION
FABRICATION INSPECTION.
INSPECTION OF MATERIAL AFTER
RECEIPT OF SITE.
INSPECTION BEFORE CLOSING FALSE
CEALING.
FINAL INSPECTION.

FOUNADTION INSPECTION
POINTS TO BE COVERED:
Excavation measurement as per drawing
and lay out.
PCC to be checked.
TMT steel quantity and quality check.
RCC footings and column casting to be
checked as per drawing.

PLAIN CONCRETE
CEMENT(PCC).

Mixing of cement ,fine aggregate and


course aggregate (1:4:8) as per
drawing.
Measurement of area as per drawing.

REINFORCEMENT

Make of TMT steel.


Quantity measurement.
Ensuring that reinforcement as per
drawing or not.

RCC Footings

Ensuring that mechanical batch mixture


used or not.
Ensuring that cement make and date of
manufacturing as per IOCL specification.
Ensuring that vibrator used or not.
Ensure that mechanical batch mixture
used or not.
Ensuring that concrete properly mixed or
not.
Supervise the footings while construction.
Cubes to be casted for lab testing.

DATA SHEET
All the data
should
recorded in
this format

RAW MATERIAL INSPECTION

Ensure raw material make whether it is


approved make or not.
Test certificates and Invoices review to
ensure genunity of material.
Ensure that raw material quantity
procured by fabricator is sufficient for
particular canopy.

FABRICATION INSPECTION

Visual inspection for welding defects.


Visual inspection for surface defects.
Fabrication as per drawing.

INSPECTION DURING
ERECTION

Measurement distance between and


across the columns.
Fabricated material for particular canopy
reached to site or not.
Plumb level to columns.
Paint after erection.

INSPECTION BEFORE CLOSING


FALSE CALING

Line and level of dummy fascia.


Make of roofing, Thickness and size of roofing.
Water gutter leak test.
Ensure that gutter made of single aluminum sheet.
Electrical cable measurement .
Ensuring that no joints in cables.
Lemonier as per design or not.
Grid for false ceiling.

CIVIL WORKS

Hume pipe measurement.


Pump Islands measurement as per
drawing.
Depth and size of electrical and water
chambers.

WBM
WBM-Water bound macadam.
First layer 65mm 40 mm black metal+10
mm red gravel.
Second layer 65mm 40 mm black
metal+10 mm red gravel.
Third layer 1:2:4 concrete 50 mm.
Fourth layer river sand bed 50 mm
Fifth layer pavers 80 mm thick

Ensure that total WBM thickness 330


mm
Check for the water level of surface.

REFERANCE STANDERDS

IS 456
IS 2062
IS 808

DOCUMENTATION

Test certificates for structural steel and


TMT steel.
Invoices for steel, cement, paint quantity
to be matched with the quantity used in
work.
Inspection report for each stage.
Photographs at various stages.
Cube test reports.
PQR and WPS of particular welder.

REFERANCE PHOTOGRAPHS.
CANOPY ERECTION

CANOPY DUMMY FASCIA

DUMMY FASCIA SHEET

CANOPY 8x18 M2

FOUNDATION

WBM WORK

PUMP ISLANDS
AND WATER CHAMBERS

.
.