Dubai Police Forensic

Lab
26th Aug
2014

PROGRESS HIGHLIGHTS
1) STRUCTURE
STRUCTURAL STEEL Wing D completed.
STAIRCASES- Completed
STAIRCASE/ LIFT CORE TOP SLABS- Completed
2) EXTERNAL CLADDING WORKS STATUS

External Glazing works in progress


Completed 3526 / 3663 Nos (96.26 %) of glass
panels as of 23 Aug 14
Number of glass panels installed during the week
91 Nos

Installation of frames , Alpolic Panels


Completed 838/ 857 Nos (97.78 % ) of frames as
of 23 Aug 14
Completed 2416 / 2442 Nos (98.93% ) of brackets
as of 23 Aug 14
Completed 922 / 1305 Nos (70.65 % ) of A.Panels
as of 23 Aug 14

PROGRESS HIGHLIGHTS
1) STRUCTURE
STRUCTURAL STEEL
STAIRCASES
STAIRCASE/ LIFT CORE TOP SLABS
2) EXTERNAL CLADDING WORKS STATUS
3) MAIN BUILDING INTERNAL FINISHES WORKS STATUS

Fire
rated
glazed
partitions
work
continued.
Media ceiling grid installation work in
progress at 1st & 2nd floor.
Wall & Floor tiling at Ground floor & First
floor and Wing B & D of 2nd floor in
progress.
Marble flooring works continued in B wing
Ground floor, First floor, 2nd floor and 3rd
floor.
Marble wall cladding works continued in
the Ground floor, First floor & Second floor
B wing.
Lift installation work continued in wing B
wing for lift no 7 & commenced for lift no 1
& 2.
Space frame works continued.

GROUND FLOOR
Ground
Floor

Wing- a: 22 rooms cleared by MEP for suspended ceiling


grid installation. Floor & wall tiling works in wet areas in
progress.
Wing- b: 27 rooms cleared by MEP for suspended ceiling
grid installation. Marble flooring & cladding work in progress.
Floor & wall tiling works in wet areas in progress. False ceiling
grid installation in progress. Fire stop works is in progress.
Wing- c: 36 rooms cleared by MEP for suspended ceiling
grid installation. Floor & wall tiling works in wet areas in
progress. Grouting for wall and floor tile in progress. Glass
Fixing in progress. Fire stop works is in progress.
Wing- d: 18 rooms cleared for suspended ceiling grid
installation. Primer coat & stucco application on walls in
progress. Grouting for wall and floor tile in progress. Fire stop
works is in progress. Plastering in progress for new electrical
room.

First
Floor
FIRST
FLOOR
Wing- a: 30 rooms cleared by MEP for suspended ceiling grid
installation. False ceiling grid installation in progress. Fire
rated partition works in progress.
Wing- b: 47 rooms cleared by MEP for suspended ceiling grid
installation. Dry wall partition wall works and MEP high level
works are in progress. Marble flooring works in progress.
Marble wall cladding works continued.
Lift installation works in progress. Floor & wall tiling works in
wet areas in progress. Primer & Stucco paint application in
progress. Fire stop works is in progress. False ceiling grid
installation in progress.
Wing- c: 50 rooms cleared by MEP for suspended ceiling grid
installation. Media ceiling grid works in progress. Lift
installation works in progress. Fire stop works is in progress.
Wing- d: 48 rooms cleared by MEP for suspended ceiling grid
installation. Media ceiling grid works in progress. Floor & wall
tiling works in wet areas in progress. Fire stop works is in
progress. False ceiling grid installation in progress. Glass

SECOND FLOOR

Wing- a: 15 Rooms cleared for ceiling grid installation; MEP


services in walls & ceilings are in progress. Primer coat & Stucco
application in progress on dry wall partitions. Fire stop works is
in progress. Fire rated partition works in progress.
Wing- b: 22 Rooms cleared for ceiling grid installation; Block
work in progress in auditorium area. Drywall partition works in
progress. Marble flooring works continued. Lift installation works
in progress. Floor & wall tiling works in wet areas in progress.
Fire stop works is in progress. Marble wall cladding works in
progress.
Wing- c: 56 Rooms cleared for ceiling grid installation. Dry wall
partition and MEP services in walls & ceilings are in Progress.
Primer coat & Stucco application in progress on dry wall
partitions. Media ceiling works in progress. Fire rated glazed
partition works in progress. Lift installation works in progress.
Wing- d: 44 rooms cleared for suspended
ceiling grid
installation. Dry wall partition works in progress at wet area.
False ceiling grid installation in progress. MEP services in walls &
ceilings are in Progress. Fire stop works is in progress. Media

Third
THIRDFloor
FLOOR

Wing- a: 4 Rooms cleared for ceiling grid installation. MEP


services on ceiling are in progress. Dry wall partition is in
progress. Primer coat & stucco application in progress on dry
wall partitions. Media ceiling works in progress.
Fire stop works is in progress.
Wing- b: 24 Rooms cleared for ceiling grid installation. Block
work, dry wall partition, MEP services in walls and ceilings are in
progress. Lift installation works in progress. Fire stop works is in
progress. Marble flooring works in progress.
Wing- c: 32 Rooms cleared for ceiling grid installation. Block
work, Dry wall partition and MEP services in walls & ceilings are
in Progress. Primer coat & Stucco application in progress on dry
wall partitions. Media ceiling works in progress. Lift installation
works in progress. Fire rated glazed partition works in progress.
Fire stop works is in progress.
Wing- d: 26 Rooms cleared for ceiling grid installation. Dry wall
partition works, MEP services in walls & ceilings are in progress.
Primer coat & Stucco application in progress on dry wall

PROGRESS HIGHLIGHTS
1) STRUCTURE
STRUCTURAL STEEL
STAIRCASES
STAIRCASE/ LIFT CORE TOP SLABS
2) EXTERNAL CLADDING WORKS STATUS
3) MAIN BUILDING INTERNAL FINISHES WORKS STATUS
4) UTILITY BUILDINGS& EXTERNAL SERVICES STATUS

HV Area Building B

HV room : Transformer installation


completed by DEWA.

Building B

MEP works in Chiller Hall in progress.


Remaining area cladding works in progress.
External services in progress.

Building C
MEP works in progress. External
faade works in progress.
Building D
On hold due to external road
contractors work.
Building E
Internal plaster completed.
Parapet wall plaster completed.
Structural steel works completed.
Building F
Tie Beam works in progress.

External services between Main building


& utility buildings in progress.
Excavation of boundary wall in progress
in wing c area.
External
services
manhole
casting
completed in between building E and
wing D & between building B and C.

PROGRESS HIGHLIGHTS
1) STRUCTURE
STRUCTURAL STEEL
STAIRCASES
STAIRCASE/ LIFT CORE TOP SLABS
2) EXTERNAL CLADDING WORKS STATUS
3) MAIN BUILDING INTERNAL FINISHES WORKS STATUS
4) UTILITY BUILDINGS& EXTERNAL SERVICES STATUS

5) PROGRESS SUMMARY /SNAP SHOT

PROGRESS SNAPSHOT
Activities
Internal finishes
Screed(Dry Area)
Screed(Wet Area)
Block work
Internal Plastering

Ground floor
a
b
c
d
100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

First floor
a
b
c
d
100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

100
%
100
%
100
%
100
%

Second floor
a
b
c
d
100
%
100
%
100
%
100
%

100
%
100 100
%
%
100
85%
%
100
90%
%
91%

Third floor
a
b
c
d

Roof Floor
a
b
c
d

100
100 100 100
85%
30%
%
%
%
%
100
100 100
- 90%
%
%
%
100
100 100 100
91%

%
%
%
%
100
100 100
90% 89%

%
%
%

Partitions in dry area


except above glass
partition

99% 95% 95% 90% 99% 91%

100 100
100
87% 67% 99%
65% 77% 93% 98%
%
%
%

Internal Paint

70% 60% 70% 61% 58% 30% 66% 65% 56% 39% 28% 52% 40% 25% 45% 46%

Floor tiling(Wet Area)

95% 90% 95% 75%

90%

75
%

30
%

Wall Tiling

90% 75% 85% 75%

65%

2%

50%

2%

40%

7%

Marble & Granite Works


Media ceiling works
Fire Rated Glazed
Partition
Roof Canopy Steel Works
MEP works
HVAC
Electrical
Plumbing

30%
-

87%

72%

13%

60%

100
95%
%

20% 32% 100 100


25%
%
%

22% 17%

95% 80% 30%

30%

60% 25%

100
%

96% 93% 93% 93% 93% 92% 89% 90% 88% 80% 75% 89% 79% 71% 64% 79% 39% 92% 36% 32%
12%
95% 94% 94% 90% 92% 84% 86% 84% 76% 69% 75% 72% 59% 53% 61% 57%

98% 93% 95% 94% 93% 93% 92% 93% 92% 83% 85% 90% 79% 63% 66% 72%

31%

14%

PROGRESS FOR THE


WEEK
Ground floor
First floor
Second floor
Third floor

Activities
Internal finishes

Screed(Dry Area)

Screed(Wet Area)

Block work

Internal Plastering

1%

Partitions in dry area


except above glass
partition
Internal Paint

1%

3% 5% 1%

1%

2%

Floor tiling(Wet Area)

10%

Wall Tiling

10%

5%

5%

3% 4% 3%

2%

15%

4% 4%

5% 3% 2%

3%

2%

27%

4%

10% 2%

3%

5%

10
%

6%

30% 11%

HVAC

7% 3%
1% 4%

5% 1%

2%

2% 2%

Roof Floor
b
c
d

10%

Media ceiling works

Electrical

6% 1% 1% 1%

Marble & Granite Works

Fire rated Glazed


partition
Roof Canopy Steel
Works
MEP works

1%

5%

2%

4% 1%

9%

5%

MEDIA CEILING PROGRESS

Progress
Summary

Engineering Delay
Structural steel-(-335)
AV system Nomination-(262)
Glazed partitions-(-308)
Shooting range-(-305)

Progress Summary

KEY ISSUES FOR


COMING WEEK

Sl.No

AREAS OF CONCERN /
CRITICAL ISSUES

Action
By

Extended reviews/approvals
process.

AH/DPF

Finalisation of Access control


system

ANC/TG

Approval of MEP light


Fixtures- FOH, External ,
Labs

AH/DPF

Progress in the last week

Backlog of submittal to be
reviewed and commented at the
earliest. Priority items and Long
Priority lists updated and workshops lead materials requested to be
held with AH.
cleared as a matter of utmost
urgency. Code 3 responses to be
minimized.
ANC / TG to resubmit the
Rejected on 21Aug2014 by AH.
drawings.
-

AH/DPF/AN
C

RCP approvals

Ironmongery

AH/DPF

Tiling Layouts

AH/DPF

External Works

AH/DPF

AH/DPF

AH/DPF/AN
C

AH/DPF

8
9
10
11

Acoustical wall & ceiling


panels
Main building staircase
flooring (ASP Staircase
flooring)
Penthouse Blockwork
Balustrades - Stair and
Atrium (Technical Glass)

AH/DPF

Action needed moving


forward

Approval is required to place the


order for long lead items & Lab
lights affect media ceiling panels.
3F Part c drawings to be reviewed
and approved. ANC to incorporate
comments & resubmit 2F Part c
and 3F Part a drawings.
Samples require urgent approval
and hardware layout drawings
and schedules.
Approval of shop drawings &
decision regarding mosaic border
above mirror.
RC drawings for boundary walls
and water features pending
approval.
Sample requires urgent approval.
Shop drawings require urgent
approval. ANC to submit samples.
Shop drawings require urgent
approval.
Shop drawings require urgent
approval.

INDICATION OF TOTAL SUBMISSIONS SINCE


NOVEMBER-2013 AND RESPONSES FROM THE
CONSULTANT

350

6000

291

4827 5000
4798
4702
4677
4650
4561
4532
4496
4465
4425
4335
4294
4229
4542
4205
4530
4149
4109
4045
4314
3983
250
3954
4265
4266
4241
3906
4233
3868
4193
3845
4156
3785
4100
3726
3702
216
4000
3992
3947
210
3595
3877
3527
3826
3440
3760
3728
3385
197
3663
3299
3274
3221
3490
3137
3461
200
3428 173
3342
3005
3323
2931
171 171
3254
2908
3231
3221
2830
3089
3030
3000
2963
2620
2936
2576
2765
2379
2363
132
132
150 2322
2474
2303
2299
2293
2254
108
2165
107
2140
2130
2100
103
1997
2000
96
1919
90
1868
89
89
87
86
86
84
100
78
78
74
70
69
6768
66 65
62 64
59
59 60
56
56
55
53
51
51 41
48
48
45 40 3736
44
41
40
39
38
33
32
31 4029 2427 25
50 22
30
29
29
29 1000
28
27
25 16
2523
25
24 23 23
24
19
12
10
10
8
6 4
1
0
0
300

Weekly submittal

weekly return

Cum- Submission

Cum- Returned

350
300

250
0

200
0

150
100

0
0 58
28

279

156

167

1
0
5

152

212

1
0
0 0 121
0
14
99 0
28
72
0
0
0
0
13
17
50
81
58
0
0
0 22
40 18
0
1
56
0
8
0
39
0
0
53
0
50
0
41
0
0
45
10
41
15
38
0
38
24 3
15 34
15
10
25 29 20 13 26
0
0 16
0 23
1
3
0 0
11 4 9 16 19 18 5
9 8
9
8 0
1
6 7
5
5 16
3 15 12 4 17
3 10 0
2 17 1 1
1 9 4 11
1
0 10

50

Weekly return- Code 3

Weekly Return- code 2

Weekly Return- code 1

INDICATION OF APPROVALS PER WEEK


SHOPDRAWINGS
350

4500
3868
3845
3763
3747
3722
287
3640
3639 4000
3635
3620
300
3591
3569
3543
3457
3425
3421
3397
3396
3379
3375
3369
3351
3339
3309
3304
3269
3267
3500
3213
3185
3163
3154
3142
3116
3099
3094
3080
3054
3038
3007
2991
2991
2969
250
2941
2875
2821
2797
2768
214
2750
2739
3000
2698
2654
2644
2628
2609
2604
2593
2584
2566
195
2487
2468
2418
186
2361
2355
2333
200
2295
2273
2500
2208
2177
160
2013
156
1985
1890
144
1799
1790
2000
1727
1722
1690
150 1763
1623
1261730
1604
1596
1570
116
1485
1431
1389
1500
94
86
85
85
82
82
82
100
79
71
70
65 6766
1000
56
54
52 6354
50
50 56
48 43
47 42
47
43
42
42
40
38
36
35 42 40 32
32
50 1927
29
29
29
29
28
26
26
25
24
23 500
22
22
22 11 19 17
22
20 17 16
19
14 16 18
13
10
9
9
9
8 19
5 3
4
4
1
0
0

Weekly submittal

weekly return

Cum- Submission

Cum- Returned

350
300
250
200
150
100

275
145

210
127

154
43
13 107
6
77
51
80
8
5 40
9
0
0 20
6 29
33 35
33 16
50 47
48
40
42
8
34
32
31
22
18
13
23
17 7
5
8 8
8 16
8 3 5 9 13 16 0
6 18
6 1 6 4 3
5
4 2
4 0
4 11
3 15 12 2 14
3 9 1
3
1 16 0 1
1 9
1
0 6

50

Weekly return- Code 3

Weekly Return- code 2

Weekly Return- code 1

SHOP DRAWING REVIEW STATUS SUMMARY

FORECAST SHOP DRAWING APPROVAL


FORECAST RESPONSES
REQUIRED

HISTORY OF RESPONSESNos

Drawings pending
response- 229 Nos

AVERAGE
-56

REQ. AVERAGE126

AVERAGE RESPONSE TIME FOR SUBMITTALS


40

SCAR- AVG RESPONSE TIME


60
50
40
30
20
10
0
-10
-20
-30
-40

30
20
10
0

18

14 Response
31
SCAR-

-10
-16

-20

MATERIAL SUBMISSION (Civil)- AVG


RESPONSE TIME

34

15
46
Material
-Response

-31

Avg time by AH

Avg time by DPF

Avg time by AH

Avg time by DPF

Total

Delay

Total

Delay

80

SHOP DRAWINGS APPROVAL architectural- AVG


RESPONSE TIME

60
40
20
0

37

-20

31
59
ShopdrawingsResponse

-40
-44

-60
Avg time by AH

Avg time by DPF

Total

Delay