You are on page 1of 52

42 SVC Module Working Guide

This is a 42 inch Plasma TV SVC Bulletin that show how to replace SVC Module
based on 42T1 .
All Models PSU SVC Bulletin
1. Applied Models
Year

04

05

Model

Applied
FILTER

SVC
Guide

Notes

42PX1

42V7

Clear

Transfer Fan Supporter


Transfer Module Fixer

42PM1/2

42V7

Glass

Transfer Fan Supporter

42PM3

42V7

Clear

Transfer Fan Supporter


Transfer Module Fixer

42PM4

42X2

Glass

Transfer Fan Supporter

42PY1

42V7

Glass

Transfer Fan Supporter

42PX3/4

42V7

Clear

Do not fix 4 corner of module

42PX5

42X2

Glass

Transfer Fan Supporter

42PX7

42X3

Clear

42PC1/3

42V8
42X3

Clear

42PB2

42X3

Clear

06

42PB4
07

Applied
Module

42PC5
42PC7

42X3/X3
A
42X4/X4
A

Clear
Clear
Clear

08

42PG1/2/3/6

42G1/G1
A

Glass

09

42PQ1/2/3/6

42G2/G2
A

Glass

Change the Side AV supporter Right

Attention
1.There are different of SVC Module working according to Model series. Before Working, Please Refer to Guide.
2. On the way Replacing SVC Module, Pay attention not to occur Dust between Glass Filter & Module
3.To prevent scratch on Cabinet & Glass filter , Put soft cloth on Ground after that, Replace SVC Module.
4. It do not changed circuit process.
(All connector is common with respect to before.)
5. Remove the Protective Film in front of Glass in case of Clear Module.

SVC Bulletin
The Number of issue:
The date of issue: 2011.03.17

Information classification : Technical Part

1. Title : During replacing 42,50 PQ and 60PB, PC SERIES SVC MODULE, apply the improved cable
2. Applied Model : 42PQ##, 50PQ##, 60PB##, 60PC##
3. Reason : To improve the length of cable between PSU and Main B/D
4. Symptom: Unable to reach and assemble cable between PSU and Main B/D
5. Cause:
The lack of cable length between PSU and Main B/D can make the cable unreach.
The newly developed alternative module has PSU to deal with the range of Vs voltage.
The location of EAD42065908 which is in EAJ60987624 and EAJ60868318 can be P1008.
The location of 6631900012G in EAJ35776108 can be P1005.
6. How to apply the improved cable
Applied model
Module Part No.
Modified cable part no. Cable spec. Location in PSU
---------------------------------------------------------------------------------------------------------------------------------------------------PDP50G2T334.AKC5GDC
EAJ60987624
EAD42065908
24Pin 550mm P1008
PDP60X7T000.AKC5GDD
EAJ35776108
6631900012G
10Pin 400mm P1005
PDP42G2T144.AKC5GDD
EAJ60868318
EAD42065908
24Pin 550mm P1008

7. After module replacement and how to check


1) Check the cable length between Vsc(Main) B/D & PSU.
2) If the cable length is short and cant be assembled, order the each modified cable part number
SVC parts for newly modified cables were sent to each SVC subsidiaries in 28th FEB for SVC buffer.
3) From April in 2011, the two cables will be added in module production.

6. Parts for service : SVC module


7. Service Handling Method :

The improved cable should be applied

8. E-mail : dongho.choi@lge.com or yongsuk.park@lge.com

Tel : 82-54-460-7282 or 82-031-686-4692

SVC Bulletin
The Number of issue:
The data of issue: 2010.11.22

Information classification : Technical Part

1. Title : During replacing 42,50 PB,PC1/2 SERIES SVC MODULE [42X4A, 50X4P], applying 10 in power.
2. Applied Model : 50PB2DR, 50PC1DRW, 42PB2DR, 42PC1DRW
3. Reason : To improve Power Protection, 10 in P1003, power should be applied.
4. Symptom: After module replacement and power on, Relay power is off.
5. Cause: From Vsc(Main) B/D to PSU, Module 5V off
6. How to improve
: To improve Power Protection, 10 in P1003, power should be applied.
(the power in origin SET doesnt have problem. It is because there is Pull-up circuit(resistor).
7. After module replacement and resistor, how to check
1) Check the Vsc(Main) B/D whether it is normal or not.
2) After module replacment and resistor additioin, check the normal condition or not.
3) Applied module
: EAJ42047888 (PDP42X4T523.AKC5GDD), EAJ36420446 (PDP50X4TD46.AKC5GDC)
8. How to apply the 10 in P1003, PSU

* How to apply the 10 in P1003, PSU


: In the PSU of newly developed SVC model
,10k resistor should be applied between

P1003 connector

3rd Pin(STBY5V) and 7th Pin(Module 5VOn)

* Caution (The electrical short)


: the tape should be applied not to get
electrical short of below pattern of PSU

3 (STBY5V)
rd

7 (Module 5VOn)
Resistor 10k
th

6. Parts for service : svc module


7. Service Handling Method :

The resistor should be needed

8. E-mail : dongho.choi@lge.com or yongsuk.park@lge.com

Tel : 82-54-460-7282 or 82-54-460-7847

The working guide for the protective film of Clear Filter


Clear Filter Module

Purpose
: If the protective film is not detatched from module
the picture is dimmer than usual and Bar Code label of protective
film during watching TV can be detected (refter to the photo)

Cause
: After changing PDP module, the protective film was not detatched from module
(* working Error)
Working Guide
: If PDP module is applied Clear Filter, the protective film should be detatched
before replacing PDP module

[ the image of detatching the protective film]


Applied model
: All of the Clear Filter TV model

CS PSU SVC Bulletin

42/50/50F

PSU SVC
Bulletin

1. PSU Connection (42/50/50F)

Year

Module

2004

42V7

PSU
H1

SET
42PX1

2004 / 2005 (42PX1, 42PX3, 42PX4)


- 1st AC Inlet PSU (SC102) :
- 2nd VSC BD PSU (P1004 / P1005 / P1006 / P1007) :

2005

42V7

H2

42PX3 /42PX4

2006
2007

42X3/X3A, 42X4/X4A
50X3,50X4P,50H1

H3
XP1

42PB / 42PC
50PC, 50PY

2006 / 2007 (42PB, 42PC, 50PC, 50PY)


- 1st AC Inlet PSU 42/50HD(SC101),50FHD(SC102) :
( Caution to connect with SC101)
2008

42G1/G1A
50G1/G1A, 50H2

XP2

42PG
50PG

- 2nd VSC BD PSU (P1001 / P1002 / P1003) :

- 3rd Be sure to remove P1013 Harness :


2008 (42PG, 50PG)

2009

42G2/G2A,
50G2/G2A,
50H3/H3A

XP3

42PQ, 50PQ
50PS

1st AC Inlet PSU 42/50HD(SC1004),50FHD(SC1002) :


2nd VSC BD PSU (P1009) :

2009 (42PQ, 50PQ, 50PS)


1st AC Inlet PSU 42/50HD(SC101),50FHD(SC102) :
2nd VSC BD PSU (P1008) :

CS PSU SVC Bulletin

42/50/50F

2. PSU Sound voltage Check (42/50/50F)


Sound Voltage Check Method
-. As using DVM, Check voltage
the left pin(17V) of P1002.
-. Settle voltage by referring to below models.
Sound voltage
Variable resistance

Sound Voltage Check Point

(turn to VR301 in clockwise rotation)


Year

Model Name

2004

42PX1

2005

42PX3 /42PX4

2006
2007

42PB / 42PC
50PC, 50PY

2008

42PG
50PG

2009

42PQ, 50PQ
50PS

Sound Voltage Check

19V

17V

3. Notice thing

Vertical
Supporter

-. BE careful to peel off cable when the harness is connected under the Vertical Supporter
between Y board and Z board.

42PX1 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PX1* series
2. Applied Model : 42PX1 Series All
3. Change reason : To apply exchange module because of discontinuance 42V7[Clear] module production

4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG

5. SVC Working Guide


-

Disassemble back cover

Disassemble Chassis Assy


Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module


1.
2.
3.
4.
5.
6.
7.
8.

Detail Working Guide


Disassemble Back Cover
Disassemble Main plate unfixing the No.3 Screw
Unfixing the No.1 screw on the corner and discard it
Unfixing the No. 2 screw to fix module assy and cabinet
Disassemble the Vertical Screw unfixing the screw
Unfixing the No. 4 screw, transfer Fan and wire to SVC module
Assemble Back Cover in reverse order of changing the module
Check the TV operation status and configurations.
No.1 Screw: After unfixing, and discard
No.2 Screw
No.3 Screw
No.4 Screw
Vertical Supporter
2

2
2

42PM1 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PM1* series
2. Applied Models : 42PM1 Series All
3. Change reason : To apply exchange module because of discontinuance 42V7[Clear] module production
4.Change the Contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Vertical Supporter
Disassemble Module Supporter from the module
Disassemble the Fan from the Module
Change the Module, and then assemble the TV in reverse order


1.
2.
3.
4.
5.

Detail Working Guide


Disassemble Back Cover
Disassemble Main plate with unfixing the No.3 Screw
Unfixing the No.1 screw on the corner and discard it
Unfixing the No. 2 screw to fix module assy and cabinet
Disassemble the supporter with unfixing the screw

No.1 Screw: Unfixing and discard it


No.2 Screw
No.3 Screw
Vertical Supporter
2

2
2

2
3

Detail Working Guide

6. Unfixing the screw No.4, transfer Fan and wire to SVC module
7. Assemble Back Cover in reverse order of changing the module
8. Check the TV operation status and configurations.

No.4 Screw
4

42PM3 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PM3 series
2. Applied Models : 42PM3 Series All
3. Change reason : To apply exchange module because of discontinuance 42V7[Clear] module production
4.Change the Contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Vertical Supporter
Disassemble Module Supporter from the module
Disassemble the Fan from the Module
Change the Module, and then assemble the TV in reverse order

Detail Working Guide

1. Disassemble Back Cover


2. Unfixing the No.1 screw on the corner and discard it
3. Disassemble Main plate with unfixing the No.3 Screw
No.2 Screw

No.1 Screw:
Unfixing and discard

No.3 Screw


4.
5.
6.
7.

Detail Working Guide


Unfixing the No.4 Screw, Assemble the module with vertical
It must be assembled 3 type fixer(Top, Bottom, Side)
Assemble Back Cover in reverse order of changing the module
Check the TV operation status and configuration.

Side 4EA

Top
1EA

Bottom
1EA

42PM4M Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PM4M series
2.Applied Models : 42PM4M Series All
3. Change reason : To apply exchange module because of discontinuance 42X2 module production
4.Change the Contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Vertical Supporter
Disassemble Module Supporter from the module
Disassemble the Fan from the Module
Change the Module, and then assemble the TV in reverse order

Detail Working Guide

1. Disassemble Back Cover


2. Disassemble Chassis Assy unfixing the No.1 & No.2 Screw

No.2 Screw

No.1 Screw

No.3 Screw

3. Disassemble the Module assy unfixing the No.3 screw from the Front Assy

Detail Working Guide

4. Unfixing the No. 4 screw, transfer Fan and wire to SVC module
5. Assemble Back Cover in reverse order of changing the module

Support Vertical

Fan

42PY1 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PY1* series
2. Applied Model : 42PY1 Series All
3. Change reason : To apply exchange module because of discontinuance 42X2 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
- Disassemble back cover
- Disassemble Chassis Assy
- Disassemble Supporter from Module
- Change the Module then assemble the TV in reverse order

Detail Working Guide

1. Disassemble Back Cover


2. Disassemble Main plate unfixing the No.1 & No.2 Screw
3. Unfixing the No. 3 screw to fix module assy and cabinet

No.2 Screw

No.1 Screw

No.3 Screw

Detail Working Guide

4. Unfixing the No. 4 screw, transfer Fan and wire to SVC module
5. Assemble Back Cover in reverse order of changing the module

Support Vertical

Fan

42PX3/4 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PX3/4 series
2. Applied Models :42PX3/4 Series All

3. Change reason : To apply exchange module because of discontinuance 42X3 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Photo exchanged SVC Module


1.
2.
3.
4.
5.
6.

Detail Working
Guide
Disassemble Back Cover
Disassemble Main plate unfixing the No.1 Screw
Unfixing the No.3 screw on the corner and discard it
Unfixing the No. 2 screw fixed with Module assy and cabinet
Disassemble Vertical Supporter(No.4) from the module.
Assemble Back Cover in reverse order of changing the module

No.1 Screw: Unfixing and discard it


No.2 Screw
No.3 Screw

4. Vertical Supporter

2
1

42PX5 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PX5 series
2. Applied Model :42PX5 Series All
3. Change reason : To apply exchange module because of discontinuance 42X2 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order.

Detail Working Guide

1. Disassemble Back Cover


2. Disassemble Main plate unfixing the No.1 and No.2 Screw
No.2 Screw

No.1 Screw

No.3 Screw

4. Disassemble the Fan & Vertical from the module unfixing the No.3 screw
5. Transfer Vertical to SVC module
6. Assemble Back Cover in reverse order of changing the module
Fan

42PX7 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PX7 series
2. Applied Model : 42PX7 Series All
3. Change reason : To apply exchange module because of discontinuance 42X3 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

Detail Working Guide

1. Disassemble Back Cover


2. Disassemble Main plate unfixing the No.1 & No.2 Screw
No.1 Screw

No.2 Screw

No.3 Screw

1
3.
4.
5.
6.

No.4 Screw

Unfix the 3 Screw fixed with cabinet & module. (Top/Bottom/Right/Left)


Disassemble the Vertical from the module unfixing No. 4 screw
Transfer vertical to the SVC module
Assemble Back Cover in reverse order of changing the module

42PC1 Series SVC Bulletin


The Number of issue
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PC1* series
2. Applied Model : 42PC1 Series All
3. Change reason : To apply exchange module because of discontinuance 42V8/X3 module production
4.Change contents
- Cable management in the Module
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order.

The Picture exchanged SVC module

SVC Bulletin
The Number of issue:
The data of issue: 2010.11.22

Information classification : Technical Part

1. Title : During replacing 42,50 PB,PC1/2 SERIES SVC MODULE [42X4A, 50X4P], applying 10 in power.
2. Applied Model : 50PB2DR, 50PC1DRW, 42PB2DR, 42PC1DRW
3. Reason : To improve Power Protection, 10 in P1003, power should be applied.
4. Symptom: After module replacement and power on, Relay power is off.
5. Cause: From Vsc(Main) B/D to PSU, Module 5V off
6. How to improve
: To improve Power Protection, 10 in P1003, power should be applied.
(the power in origin SET doesnt have problem. It is because there is Pull-up circuit(resistor).
7. After module replacement and resistor, how to check
1) Check the Vsc(Main) B/D whether it is normal or not.
2) After module replacment and resistor additioin, check the normal condition or not.
3) Applied module
: EAJ42047888 (PDP42X4T523.AKC5GDD), EAJ36420446 (PDP50X4TD46.AKC5GDC)
8. How to apply the 10 in P1003, PSU

* How to apply the 10 in P1003, PSU


: In the PSU of newly developed SVC model
,10k resistor should be applied between

P1003 connector

3rd Pin(STBY5V) and 7th Pin(Module 5VOn)

* Caution (The electrical short)


: the tape should be applied not to get
electrical short of below pattern of PSU

3 (STBY5V)
rd

7 (Module 5VOn)
Resistor 10k
th

6. Parts for service : svc module


7. Service Handling Method :

The resistor should be needed

8. E-mail : dongho.choi@lge.com or yongsuk.park@lge.com

Tel : 82-54-460-7282 or 82-54-460-7847

Pre-work on Cabinet Assy before changing Module

Back cover open

Cut the hook with a


knife (common knife)

Remove Hook
part
Remove Module

Remove Hook 1 ea
(First Hook, Bottom right side)

Final Shape of Hook


(Must not over Supp. Filter top face after
Cutting )

Detail Working Guide


2

1. Unfixing the No.2~4 screw for


disassembling Back Cover

4
2

3
3

2
3

3
2

2. Unfixing No.1 & No.2 Screw fixed with Main Chassis and Vertical
2
2

3. Unfixing the No.2 screw


fixed with Module & Cabinet

2
2

1
2

2
2

4. After exchanged module with unfixing


the No.4 Screw.
assemble the item of No.2 & No. 3 to the
SVC module.
And, unfixing No.6 & No.8 screw from the
old models, then assemble item No.5 &
No. 7(Cable tie) to the SVC Module.

1
4

PD61A/C CHASSIS

4
8

4
6

5. Assemble the Module on the cabinet with


fixing the screw.

6. Re-assemble the AV plate with using No.1


& No.2 screw unfixed

7. Assemble the Back cover and check the TV operation status.


1)
2)

42PB2 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PB2* series
2. Applied Model : 42PB2 Series All
3. Change reason : To apply exchange module because of discontinuance 42X3 module production.
4.Change contents
- Cable management in the Module
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

SVC Bulletin
The Number of issue:
The data of issue: 2010.11.22

Information classification : Technical Part

1. Title : During replacing 42,50 PB,PC1/2 SERIES SVC MODULE [42X4A, 50X4P], applying 10 in power.
2. Applied Model : 50PB2DR, 50PC1DRW, 42PB2DR, 42PC1DRW
3. Reason : To improve Power Protection, 10 in P1003, power should be applied.
4. Symptom: After module replacement and power on, Relay power is off.
5. Cause: From Vsc(Main) B/D to PSU, Module 5V off
6. How to improve
: To improve Power Protection, 10 in P1003, power should be applied.
(the power in origin SET doesnt have problem. It is because there is Pull-up circuit(resistor).
7. After module replacement and resistor, how to check
1) Check the Vsc(Main) B/D whether it is normal or not.
2) After module replacment and resistor additioin, check the normal condition or not.
3) Applied module
: EAJ42047888 (PDP42X4T523.AKC5GDD), EAJ36420446 (PDP50X4TD46.AKC5GDC)
8. How to apply the 10 in P1003, PSU

* How to apply the 10 in P1003, PSU


: In the PSU of newly developed SVC model
,10k resistor should be applied between

P1003 connector

3rd Pin(STBY5V) and 7th Pin(Module 5VOn)

* Caution (The electrical short)


: the tape should be applied not to get
electrical short of below pattern of PSU

3 (STBY5V)
rd

7 (Module 5VOn)
Resistor 10k
th

6. Parts for service : svc module


7. Service Handling Method :

The resistor should be needed

8. E-mail : dongho.choi@lge.com or yongsuk.park@lge.com

Tel : 82-54-460-7282 or 82-54-460-7847


1.
2.
3.
4.
5.

Detail Working Guide


Disassemble Back Cover
Disassemble Main plate unfixing the No.1 Screw
Unfixing the No. 2 screw fixed with module assy and cabinet
Disassemble the Vertical(3) unfixing the screw
Assemble Back Cover in reverse order of changing the module

No.1 Screw
3
2

No.2 Screw
2

3
2

The screw is under AV plate Bottom

42PB4 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PB4 series
2. Applied Model : 42PB4 Series All
3. Change reason : To apply exchange module because of discontinuance 42X4 module production
4.Change contents
- Cable management in the Module
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

Detail Working Guide


1

1. Unfixing the No.2, No.3 Screw

3
3

3
2

3
3

3
3

3
2

3
2

2. Unfixing No.2 & No.4 Screw


to disassemble side AV and Main plate

2
2

4
3
4

3. Unfixing No.2 Screw to disassemble


Module assy and cabinet

2
2

Detail Working Guide

4. After exchanged module with unfixing the No.4 Screw,


assemble the item of No.2 & No. 3 to the SVC module.
And, unfixing No.6 & No.8 screw from the old models, then
assemble item No.5 to the SVC Module

1
4

5
2

6
4

5. Assemble Module assy on the cabinet.


(Do not fix the 4 corner of module)

6. Assemble Back Cover in reverse order of changing the module

7. Check the TV operation status.

42PC5 Series SVC


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PC5* series
2. Applied Model : 42PC5 Series All
3. Change reason : To apply exchange module because of discontinuance 42X4 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

Detail Working Guide


2

1. Unfixing the No.2, No.3 Screw


to disassemble the back cover

2
3

3
3

3
3

3
3

2
2

2. Unfixing No.2 Screw to


disassemble side AV and
Main plate

1
2

3. Unfixing No.3 Screw to


disassemble Module assy and
cabinet

4. After exchanged module with unfixing the No.4


Screw,
assemble the item of No. 3 to the SVC module.
And, unfixing No.6 screw from the old models,
then assemble item No.5 to the SVC Module

1
4

5
2

5. Assemble Module assy on the cabinet.

6. Re-assemble the AV plate with using No.2


screw unfixed
2

1
2

7. Assemble Back Cover in reverse order of changing the module. And then check the TV
operation

42PC7 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PC7* series
2. Applied Model : 42PC7 Series All

3. Change reason : To apply exchange module because of discontinuance 42X3/42V8 module production
4.Change contents
- Cable management in the Module
- Do not fix 4 corner with screw on the LUG
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

Detail Working Guide


2

2
1. Unfixing the No.2, No.3 Screw

3
3

3
3

2
2

2
2. Unfixing No.2 Screw to
disassemble side AV and Main
plate

3. Unfixing No.2 Screw to


disassemble Module assy and
cabinet

1
2

Module Module
CABINET RIB
.

2
2

2
2

4. After exchanged module with unfixing the No.4 Screw,


assemble the item of No. 2 & No. 3 to the SVC module.
And, unfixing No.6 screw from the old models, then
assemble item No.5 to the SVC Module

1
4

5
2

5. Assemble Module assy on the cabinet.

6. Re-assemble the AV plate with using No.2 screw unfixed


2

7. Assemble Back Cover in reverse order of changing the module. And then check the TV
operation

42PG1/2/3/6 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PG1/2/3/6* series
2. Applied Model : 42PG1/2/3/6 Series All
3. Change reason : To apply exchange module because of discontinuance 42G1 module production
4.Change contents
- Cable management in the Module
- Chassis Supporter right
5. SVC Working Guide
-

Disassemble back cover


Disassemble Chassis Assy
Disassemble Supporter from Module
Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

Detail Working Guide


2

3
2

1. Unfixing the No.2/3/4/5 screw 2


to disassemble back cover

4
3

3
2

4
6 6

2. Unfixing No.3 screw


to disassemble chassis
assy

2. Unfixing No.2 & No.3 screw


to disassemble module assy

Re-use the Rubber on the SVC module

Detail Working Guide


2

4. Unfixing the No. 6 Screw, it change the


module to SVC module, then the item
No.2,3,4,5 is assembled on the SVC
module with using No. 6 screw.

6
6

6
6

6
6

6
6

5. Re-assemble the Stand Guide with using


No.1 & No.2 screw.
CN101

1
2
4

3
1

1
2
4

- Disasseble Chassis assy


- The no.3 item, MGJ41164504 is changed to
MGJ411645**.
- Re-assemble like right picture.
Detail exchanged item MGJ411645** is referred
next slide

3
Bottom

3
(Tightly insert it)

After assembling, check the touch with TCP film

P
C
B

Detail Working Guide

Applied Model

Applied Chassis

Applied item for SVC

42PG100R-ZA
42PG200R-ZA
42PG10R-TA
42PG20R-TA
42PG21R-TA
42PG60UR-MA
42PG60UR-TA
42PG61UR-TA

H5

MGJ41164541

42PG10-UA
42PG10D-NA
42PG15DH-NA
42PG1DD-UA
42PG20-UA
42PG20D-NA
42PG20D-NG
42PG2HD-UA
42PG35D-NB

ATSC M-Star

MGJ41164542

42PG1000-ZA
42PG2000-ZA
42PG20D-AA
42PG20D-DA
42PG3000-ZA
42PG30D-NA
42PG6000-ZA
42PG6010-ZE
42PG60D-NA
42PG60UD-AA
42PG60U-DA
42PG6HD-UA

Chicago
DVB M-Star
Douglas

MGJ41164543

42PG2500-ZA
42PG30D-SA
42PG30TR-TA
42PG31RD-NC
42PG35TR-TA
42PG60C-UA
42PG60D-GE
42PG60D-SA
42PG61RD-NC
42PG65C-UA
42PG6900-ZF

MPEG4
EV4

MGJ41164544

Detail Working Guide


Guide

6. Assemble the SVC module. And re-assemble


the Chassis Assy with screw.

Screw

Guide

7. After assembling Back Cover, check the TV operation Status

42PQ1/2/3/6 Series SVC Bulletin


The number of issue:
The date of issue: 2010.03
1. Title : Working method to guide service module change for 42PQ1/2/3/6* series
2. Applied Model : 42PQ1/2/3/6 Series All
3.Change reason : To apply exchange module because of discontinuance 42G2 module production
4.Change contents
- Cable management in the Module
5. SVC Working Guide
- Disassemble back cover
- Disassemble Chassis Assy
- Disassemble Supporter from Module
- Change the Module then assemble the TV in reverse order

The Picture exchanged SVC module

SVC Bulletin
The Number of issue:
The date of issue: 2011.03.17

Information classification : Technical Part

1. Title : During replacing 42,50 PQ and 60PB, PC SERIES SVC MODULE, apply the improved cable
2. Applied Model : 42PQ##, 50PQ##, 60PB##, 60PC##
3. Reason : To improve the length of cable between PSU and Main B/D
4. Symptom: Unable to reach and assemble cable between PSU and Main B/D
5. Cause:
The lack of cable length between PSU and Main B/D can make the cable unreach.
The newly developed alternative module has PSU to deal with the range of Vs voltage.
The location of EAD42065908 which is in EAJ60987624 and EAJ60868318 can be P1008.
The location of 6631900012G in EAJ35776108 can be P1005.
6. How to apply the improved cable
Applied model
Module Part No.
Modified cable part no. Cable spec. Location in PSU
---------------------------------------------------------------------------------------------------------------------------------------------------PDP50G2T334.AKC5GDC
EAJ60987624
EAD42065908
24Pin 550mm P1008
PDP60X7T000.AKC5GDD
EAJ35776108
6631900012G
10Pin 400mm P1005
PDP42G2T144.AKC5GDD
EAJ60868318
EAD42065908
24Pin 550mm P1008

7. After module replacement and how to check


1) Check the cable length between Vsc(Main) B/D & PSU.
2) If the cable length is short and cant be assembled, order the each modified cable part number
SVC parts for newly modified cables were sent to each SVC subsidiaries in 28th FEB for SVC buffer.
3) From April in 2011, the two cables will be added in module production.

6. Parts for service : SVC module


7. Service Handling Method :

The improved cable should be applied

8. E-mail : dongho.choi@lge.com or yongsuk.park@lge.com

Tel : 82-54-460-7282 or 82-031-686-4692

Detail Working Guide


2

1. Unfixing the No.2/3/4 screw


to disassemble back cover

2
3

3
2

2
3
2

4
2

2
P1100

2 2

P400

2. Unfixing No.2 & No.3 screw


to disassemble module assy

2. Unfixing No.3 screw


to disassemble chassis
assy

Detail Working Guide


2

4. Unfixing the No. 6 Screw, it change the


module to SVC module, then the item
No.2,3,4,5 is assembled on the SVC
module with using No. 6 screw.

1
6
6

6
6

6
6

6
6

5. Re-assemble the Stand Guide with using


No.1 & No.2 screw.

6. Assemble the Module Assy and Chassis


assy with using each screw did unfixed
before.

7. Assemble Back Cover in reverse order of changing the module. And then check the TV
operation