Open pit
Open pit yearly rock (ore +waste) mineral push back
3.5 million Tones
Ore 1.2 million @2.44 g/t
Waste 2.2 million
Steeping ratio 1:9
Equipment
DRILLING
3 Pantera 1500
2 CM780 D
2 DM45 E
LOADING
5 Excavator
2 loader
HAULING
9 773D
2 775E
4 769C
4 769D
Legadembi Underground
Production : 217000 t/ year
Grade : 3.5 g/ton
Mining method : Cut and fill stopping
Access to the vain
through decline of 10%
size 6 meter by 6 meter
located approximately 3km from the plant
Sub-Level Interval: 20 meter floor to floor
Access to stopes: spirals with cross cut at mid point
The method adopted, with current geotechnical knowledge, is
a modified AVOCA.
Ventilation : through ventilation (ventilation decline)
MINING EQUIPMENT
based on the mining and development schedule and can be
divided into four categories;
production,
development,
hauling and services
Production
3 x twin boom development jumbo used for footwall drives and
cross cuts
2 x production jumbo:
4 x 4m LHD: used for mucking
Development
2 x twin boom development jumbo: used to develop the ramp,
return air drives,
2 x 4m3 LHD: used for mucking ore and waste from all
development headings
3
GEOLOGY AND
MINERALIZATION
East Sakaro comprises a number of lithological units
including
graphitic quartz mica schist,
amphibolite,
tremolite schist,
vein quartz,
metagranodiorite,
graphitic quartzite and pegmatite;
the graphitic quartz mica schist and amphibolite
make up the bulk of rock types in the East Sakaro area.
The same amphibolite rocks lie above and below the
quartz mica schist that hosts the mineralised quartz veins.
GEOLOGY AND
MINERALIZATION
Two mineralised
quartz vein systems have been delineated.
oES-Vein 1
oES-Vein 2.
ES-Vein 1 lies close to the quartz mica schist and
amphibolite contact
a width varying from a few cms to 6m and a strike over almost 800m.
RESOURCES
MINING EQUIPMENT
based on the mining and development schedule and can
be divided into four categories;
production,
development,
hauling and services
Production
3 x twin boom development jumbo used for footwall drives and
cross cuts
2 x production jumbo:
2 x 4m LHD: used for mucking
Development
2 x twin boom development jumbo: used to develop the ramp,
return air drives,
3 x 4m3 LHD: used for mucking ore and waste from all
development headings.
3
Crusher unit
MIDROC GOLD MINE has two crushing plants erected in parallel
namely
Medina Crusher
Old Crusher
Jaw Crusher
Open circuit superior crusher
Throughput
: 185-195
t/h
Maximum feed lump size
: 650 -700mm
Superior Crusher
Capacity
: 162 t/h
Discharge opening range
: 44 -63mm
Hydro cone Crusher
Capacity
:81 t/h
Discharge opening range
:8 -25mm
Surge
hopper
Vib.
feedr
loader
Loader
Vib.
feeder
Vib
feeder
Single
togle
2
stoc
k
Hydro
cone
Vib
feeder
S-3000
superior
DD screen
hopper
double
togle
Feeder 2
Hydro
cone
2
stoc
k
Fina
l
stoc
k
feeder 2
Vib
feeder
superior
DD
screen
Circuit type
MILL
Road mill open circuit
:
:
Hydro
Hydro
cyclone
cyclone
Ball mill
Rod mill
Discharg
Discharg
e
e sump
sump
s/scr
s/scr
een
een
Trash
Trash
screen
screen
Thickene
Thickene
rr
Disch
Disch
arge
arge
pump
pump
To leach tank
u/f
u/f
pump
pump
O/f
O/f tank
tank
o/f
o/f
pump
pump
Process water
Return line
2x
war
Lime
Lime
holding
holding
tank
tank
To leach
tank
2x
mono
Warm
Warm
pump
pump
Lime
Lime
Lime
mixing
mixing
tank
tank
Process water
Cyanide
Cyanide
Cyanide
holding
holding
tank
tank
Warm
pump
Cyanide
Cyanide
mixing
mixing
tank
tank
To leach tank
Floccu
hopp
Flocculen
Flocculen
tt
preparati
preparati
on
on tank
tank
Mono
pump
Flocculen
Flocculen
tt holding
holding
tank
tank
Mono
pump
To
thicken
er
tank
Leaching unit
Leaching :
Thickener
sampler.
Leach
circuit
Lime
Cyanide
Leach
tank 1
Leach
tank 2
Leach
tank 3
Leach
tank 4
Leach
tank 5
Leach
tank 6
To CIP tank
Carbone regeneration
The purpose of regeneration is to reuse the eluted
carbon being after organic mater removed by means
of heat about 750 c in absence of air in a rotary kiln
feed continuously from carbon accumulated in the
eluted carbon tank by means of dewatering screw
feeder.
Pump
Pump
carbon
carbon
1
2
Furnace
Furnace
3
4
From
horizontal
screen
5
6
Vibrating
Vibrating
screen
screen
Jig
Jig
Acid
Acid
wash
wash
Acid
Acid
tank
tank
Wate
Wate
rr
tank
tank
screen
screen
boile
boile
rr
Heat
NaOH
NaOH
prepa
prepa
tank
tank
Electrolytic tank
Activate
Activate
carbon
carbon
Horizon
Horizon
tal
tal
screen
screen
To gold room
Activate
Activate
carbon
carbon
Recycle
Tailing dam
1.The first dam: which is lied on wide area. All the
slurry will settle in this dam while the cyanide
containing water is floating at the top. Every day,
sample will be taken from this dam before the
cyanide containing water will be released to the
second dam. It will not be released unless the
cyanide concentration become about 20 ppm .
2.The second dam or reclaim dam: the purpose of this
dam is to retain the cyanide carrying water and feed to
the detoxification plant. Sampling is also carried out
here.
Detoxification plant
CIP tail
First dam
Second dam
Detoxificatio
n plant
To environment