Professional Documents
Culture Documents
MM PROCESSES
M M MODULE
Organization Structure
Plants:
1101- First digit Location, Second digit- Unit, Last two digits- Serial No.
At the Raigarh location 3 Logical Plants have been created to serve as General Plants
corresponding to the units
This would facilitate the business requirement of procuring MRO items for which ROP will
be maintained and also for common materials across units
The physical plants (logistics plant) have also been created as plants. The Purchase
Requisition Document Type would be different for each location
Plant Nomenclature
REQUSITIONER FIELD
TRACKING NUMBER
Purchase Requisitions
1. Normal (Delivery date is as proposed by system based on planned delivery time, or a date after this)
2. Urgent (Required Delivery date is before the delivery date proposed by the system based on the
planned delivery time)
1. Document type
2. Total Requisition value
3. Material group
4. Plant
5. Requisitioner
NEW PR TYPE
NORMAL PR
Every material code in the material master has a specified LEAD TIME and as and when a requistioner is
creating a PR, system will automatically calculate the delivery date for that material as per the lead time
maintained and the delivery date field will be unchangeable.
URGENT PR
When a requistioner require a material in lesser days other then specified the he/she will use urgent type of
PR and specified their required delivery date, here the delivery date field will be changeable
URGENT PR
10
URGENT PR
11
NORMAL PR
12
Additional fields in PR
Following fields have been introduced and made mandatory at item level in the requisition
13
14
Additional fields in PR
SCREEN SHOT-ADD FIELDS_PR
15
Normal
Normal
Urgent
Urgent
Requisition
Value (INR)
0 to 2500000
Material
group
IT / HR items/
Other groups
> 2500000
IT / HR items/
Other groups
0 to 500000
IT / HR
items / Other
groups
> 500000
IT / HR
items / Other
groups
Plant
ALL
ALL
ALL
ALL
Release authority
HOD User
dept
GM IT/GM
HR/Store/PRCommi
tee
HOD User
dept
GM IT/GM
HR/Store/PR
Commitee
HOD User
dept
HOD User
dept
E
D
GM IT/GM
HR/Store/PR
Commitee
GM IT/GM
HR/Store/PR
Commitee
E
D
Note:
1.
2.
16
3.
PO Value
Release authority
0 to 2500000
HOD Purchase
> 2500000
HOD Purchase
ED
System will automatically stopped the PR creation if budget will Excess than the allotted amount.
BUDGET amount will be updated on additional amount calculated at the time of preparation of PO/GR
18
P01/PMM
Service Raigarh
P01/PMS
II1/GDR31
CEMENT PLANT
IM1/CMT31
Note:-
I-investment,
I-iron segment Mines segment
1-Raigarh location
31 Plant unit-3 and serial no
19
First Digit
Second Digit
Third Digit
20
BUDGET
21
22
23
24
25
Workflow - PR
26
When goods receipt is made against a PO, mail will be sent to the
requisitioner and the buyer (purchasing group) in the PO line item
Mail will be sent to HOD stores and HOD purchase if goods receipt is not
posted more than 3 days after the gate entry is made .
Mail Reminders and expeditors will be sent to vendors for PO/RFQ using
standard transaction. Requirement for the same is entered in PO.
27
Vendor reverts with the filled sheet containing all the mandatory data like
RFQ number, pricing conditions, payment terms and other custom fields:
28
Preparation
of STO by
purchase
Arrangement
made by
logistic for
processing of
delivery
Receipt
acknowledgement
by user
Materials
dispatch to
required
indented Dept.
Gr and issue
posting by
store
Hand over of
excise docu.to
Excise for
modvate
Excise Invoice
to be raised
by marketing
29
Hand over of
documents to
store for GR.
By Marketing
30
Reservation - MM
Movement Type
221
Z01
261
31
WBS
Remark
F/SP
Not Allowed
PM
Not Allowed
I/C
Allowed
F/SP
Allowed
PM
Not Allowed
I/C
Not Allowed
F/SP
Not Allowed
PM
Allowed
I/C
Not Allowed
32
receiving plant/location.
Business will keep manual record of such transactions for tallying the stock on actual
receipt.
33
THANK YOU