Backfilling involves filling excavated trenches or holes. It requires skills and knowledge of specifications and can be done in several ways for purposes like protecting foundations or landscaping. Different soil types require different techniques to ensure optimum performance. Common backfilling techniques include compacting layers of soil, water jetting to move soil around without compaction, and using flowable fill material delivered by truck. Proper backfilling is important for pipe protection and future access to buried utilities.
Backfilling involves filling excavated trenches or holes. It requires skills and knowledge of specifications and can be done in several ways for purposes like protecting foundations or landscaping. Different soil types require different techniques to ensure optimum performance. Common backfilling techniques include compacting layers of soil, water jetting to move soil around without compaction, and using flowable fill material delivered by truck. Proper backfilling is important for pipe protection and future access to buried utilities.
Backfilling involves filling excavated trenches or holes. It requires skills and knowledge of specifications and can be done in several ways for purposes like protecting foundations or landscaping. Different soil types require different techniques to ensure optimum performance. Common backfilling techniques include compacting layers of soil, water jetting to move soil around without compaction, and using flowable fill material delivered by truck. Proper backfilling is important for pipe protection and future access to buried utilities.
knowledge on the specifications and requirements of your contract. Backfilling can be done in several ways, and can be used in tasks such as protectingfoundations, landscaping, or filling in voids that would weaken underground structures. Different soil types have differing properties, and require different construction techniques to ensure optimum performance. Impact loading of the pipeline, shafts, structures and appurtenances must be avoided during the placement of backfill.
Backfilling can be done using the following
techniques : Backfilling: Compact This material is thencompacted usingsome mechanical means such as a compactor on an excavator or ajumping jack type compactor. Compact soils to not less than the percentages of maximum dry density as determined in accordance withASTMD698, Method A (Standard Proctor).The thickness of the layer will depend upon the nature of the backfill, and the compaction equipment to be used.Water may be added during the compaction process, to assist with compaction.
The following steps are recommended
Backfill in layers of 4"-6" (non organic
fill and clean of debris) Compact with a 1000lb compactor Water thoroughly Repeat first three steps
Jumping jack compactor
Backfilling: Water Jetting
Water jettingis a technique that relies on specific
material but no compaction. Backfilling with jet allows the contractor to leave the trench and come back later forcing pressurized water into the trench using a long metal device. Water jetting should be avoided on plastic soils or heavy clay soils, however, it is recommended in sand or in highly fissured bedrock. In jetting, youpumpthe water under pressure and use the force of the jetted water to move the bedding or backfill material around. As with any backfilling, material should be placed slowly and in lifts. Flooding or 'jetting' backfill generally produces poor to very poor compaction. It is necessary to take preventive measures to contain water containing sediment, and in particular, prevent it entering drains and water courses. If the water cannot drain from the backfill soils, the material will be setup for future collapse.
Water jet
Backfilling: Flowable Fill
Backfilling can also be done usingflowable fill.Flowable fill is a cementious material with a lowwater/cement ratio, delivered to the jobsite by a ready mix truck. The the truck, just like regular concrete. Backfilling with flowable material is then placed as backfill directly from fill should be done carefully, making sure thatthe utility pipeis covered first with an aggregate material. Allowing flowable fill to engulf the pipe can create problems for those needing to hand dig around the pipe in the future. The other challenge with using flowable fill is that the material does flow so the contractor must block or prevent the backfill material to flow continuously to other trench areas.
Flowable fill
Backfilling: Utilities
Follow these steps when backfilling utility trenches:
Backfill trenches and excavations immediately after the
pipe are laid, unless other protection is directed or indicated. Select and deposit backfill materials with special reference to the future safety of the pipes. In lower portion of trench, deposit approved backfill and bedding material in layers of 6" maximum thickness, and compact with suitable tampers to the density of the adjacent soil until there is a cover of not less than 12" using special care not to damage pipe and pipe coatings. Except for special materials forpavements, backfill the remainder of the trench with material free from stones larger than 6" or the layered thickness, whichever is smaller, in any dimension.
Under roads, streets and other paved area:
a. Mechanically tamp in 6" layers using heavy duty pneumatic tampers or equal. b. Tamp each layer to a density equivalent of not less than 100% of an ASTM D698 Proctor Curve. c. Provide additional compaction by leaving the backfilled trenches open to traffic while maintaining the surface with crushed stone.