You are on page 1of 15

SIX MONTHS INDUSTRIAL

TRAINING
AT
1. Was founded in 1883 & it is a Multinational
Corporation, headquartered in Switzerland.

2. Operates in two divisions:


I. Power Technology Division.
ii. Automation Technology Division.
Pilot Project Of ‘GIS Mapping Of
Electrical Distribution Network
Using GPS’

 Mapping Of 11 kv Urban Phase-1 Feeder in


Mohali.
 Consumer Indexing
GIS
(GLOBAL INFORMATION SYSTEM)

 Computer Based Tool for Mapping & Analyzing


Features Present on Earth.
 System used for Land Planning, Mapping Of
Roads, Railway Lines, Electrical Transmission
& Distribution Networks etc.
 Job of This System is To collect Every
Information.
Components Of GIS

 Hardware.

 Software.
i) Layering

 Data.
i) Digital Maps
Areas Of Application

 Planning.
 Street Network.
 Natural Resource.
 View Shed Analysis.
 Land Parcel Based.
 Facilities Management.
GPS
(Global Positioning System)
 Satellite Based Navigation, timing &
Positioning System.

 Provides Continues 3-D Positioning


Throughout the world.

 Applications in GIS data Collection,


Surveying & Mapping.
The Present Power Condition

 Total energy Shortage is 8% the total energy


demand.
 Peak shortage is 13% of the peak demand.
 Due to distribution losses,poor voltage
condition study Is essential.
 Utilities facing loss (20,000 crores annualy)
 Need of GIS is There.
Role Of GIS in Distribution
Reforms
 100% Consumer Metering & AMR.
 Meters At all Transformation Stages.
 Feeder And DT Metering.
 Effective MIS.
 Total Energy Accounting.
 Installation of Small, Energy efficient Dt’s.
 Digital Mapping of Distribution System.
GIS Help In Achieving Above
Reforms
 Creation Of Consumer Database &
Consumer Indexing.
 Mapping Of Sub-Transmission & Distribution
Network.
 Load Flow Studies.
 Load Forecasting.
 MIS (Management Information System).
Procedure of Electrical Network
Mapping Using GIS
1. Base Map & Geo Coding
i. Base Map Collection.
ii.collection Of Ground Control Points Using
GPS.
iii. Geo-Coding Of Base Map w.r.t Control
Points.
2. 11 KV Feeder Survey from Sub-Station to
end Consumer.
i) Creation Of Sketch

3. LT Circuit Survey
i) GPS Survey Of Transformers.
ii) Creation Of SLD of Transformer LT
Circuit.
4. Pole Painting
i) Painting as per code Generated.

5. Consumer Survey
i) Door-to-Door Survey.
ii) Generation Of GIS Consumer Database

6. Hardware Delievery
 Thus, GIS Helps In Improved Load
Management, Loss reduction, Better
Revenue Realization, asset & work
Management
THANK YOU