You are on page 1of 73

Advanced Supply Chain

Planning Day 2

Collections

ASCP Fundamentals

Objectives

After completing this module, you should be able to do


the following:
Describe collections
Describe collection exceptions
View collections

Module Overview: Topics

Collections
Collection exceptions

Topic Overview: Collections

Collections process
Scheduling and frequency
Methods
Type
Collections processing
Collections parameters
Collections workbench

Collections Process

Transaction
data store

Release
Recommendations

Data Collection

Planner Workbench

Planning
data store

Launch Supply
Chain Planning
Process

Scheduling and Frequency

Transaction
data

Data Collection

Planning
data

Methods

Complete

Targeted

Net Change

Methods

Complete

Targeted

Net Change

Organization
Specific

Type

Standard

Continuous

10

Collections Processing
User-transparent, two-stage, concurrent request set:
Planning Data Pull
Planning ODS (Operational Data Store) Load

Batch push to API

Legacy

Pull

Load

Application Data Store


(Transaction)

Staging
API
11

Operational Data Store


(Planning)

Collections Parameters

Pull data program parameters:

Instance code
Refresh or net change mode
Analyze staging tables
Data types

12

Collections Parameters

Load data program parameters:


Number of Workers
Recalculate NRA
Recalculate Sourcing History

13

Planning Data Collection

14

Planning Data Collection

15

Planning Data Collection

16

Collections Workbench

View data
Troubleshoot errors
Enter data on the destination instance that can not be
entered on the source instance
17

Collections Workbench

18

Topic Overview: Collection Exceptions

Collection exceptions
Audit Exceptions report

19

Collection Exceptions

Error Log

20

Audit Exceptions Report

21

Summary

In this module, you should have learned how to:


Describe collections
Describe collection exceptions

22

Defining & Running Plans

23

Defining & Running Plans

24

Plan Options

25

Plan Options

26

Plan Options

27

Plan Options

28

Plan Options

29

Launch Plan

30

Analyzing Unconstrained Plans

ASCP Fundamentals

31

Objectives

After completing this module, you should be able to do


the following:

Describe exceptions
Describe unconstrained exception messages
Describe recommendations
Analyze supply and demand
Release recommendations

32

Module Overview: Topics

Exceptions
Unconstrained exception messages
Recommendations

33

Topic Overview: Exceptions

Exception messages
Exception messages and plan class
Exception groups
Exception context windows
Exception sets
Comparing exception messages
Personal and public queries

34

Exception Messages

Demand
Shortage
Supply

Demand

Compression days

Supply
Today

Demand
Supply

35

Excess

Exceptions Messages and Plan Class

Unconstrained
Resource constrained
Supplier capacity constrained
Purchasing lead-time constrained
Optimized

36

Exception Groups
Late sales orders and forecasts
Supply problems for late sales orders and forecasts
Material and resource capacity
Transportation and distribution
Shortages and excess
Reschedules
Substitutes and alternates used
Projects/tasks
Item exceptions

37

Exception Messages
1. Past Due Sales Orders
This exception message appears for past due sales order lines. A past due sales order
line is a sales order line with a schedule date earlier than the plan horizon start date.
2. Past due orders
This exception message appears when the planning engine detects supply orders and
planned orders that have order (start) dates and due dates in the past (before the
planning horizon start date).
3. Late supply pegged to sales order
This message appears when a supply due date is later than the demand due date to
which it is pegged; the demand can be independent demand or dependent demand.
This usually occurs because of time fences.
4. Late supply pegged to forecast
This message appears when a supply due date is later than the demand due date to
which it is pegged; the demand can be independent demand or dependent demand.
This usually occurs because of lead times and time fences.
5. Orders to be rescheduled out
This exception message appears when the planning engine suggests that you
reschedule an existing supply order (scheduled receipt) to a later date to avoid carrying
excess inventory. It occurs when the planning engine detects a non-firm existing supply
order with a due date that is earlier than it suggests (suggested due date).
6. Orders to be cancelled
This exception message appears when the planning engine suggests that you cancel an
existing supply order. It occurs when the planning engine detects a non-firm existing
supply order that you do not need to satisfy demand or safety stock requirements.
38

7. Orders to be rescheduled in
This exception message appears when the planning engine suggests that you
reschedule an existing supply order to an earlier date. It occurs when the planning
engine detects a non-firm existing supply order with a due date that is later than it
suggests (suggested order date).
8. Orders with compression days
This exception message appears when the planning engine detects that a supply
order needs to be completed in less time that its minimum processing time in order
for it to meet a demand. If the planning engine plans the order according to its lead
time, it would start in the past (before the planning horizon start date).
9. Items with a shortage
This exception message appears when projected available balance for a planning
bucket is negative and is within the exception set Shortage Exceptions exception
time period. Projected available balance is Previous bucket projected available
balance + Sum of supply quantities with due date in this planning time bucket - Sum
of demand quantities with due date in this planning time bucket.
10. Items below safety stock
This exception message appears when projected available balance for a planning
bucket is below the specified safety stock level for the planning bucket. Projected
available balance is Previous bucket projected available balance + Sum of supply
quantities with due date in this planning time bucket - Sum of demand quantities with
due date in this planning time bucket.
11. Items with excess inventory
The planning engine generates this message when projected available balance for a
bucket is greater than the exception set Excess Quantity value for the item and
within the exception set Excess Exceptions exception time period. Projected
available balance is Previous bucket projected available balance + Sum of supply
39

Exception Context Windows

Exception summary
Exception details

40

Exception Context Windows

41

Exception Context Windows

42

Exception Context Windows

43

Topic Overview: Reports

Oracle Supply Chain Planning Detail Report


OPM MPS Enhanced Material Activity Report
OPM MPS Enhanced Bucketed Material Report
Oracle Inventory Reorder Point Report
ASCP Planning Detail Report

44

Oracle Supply Chain Planning Detail Report


A comprehensive planning report to understand the
material plan
Includes the following sections:
Horizontal Listing
Vertical Listing
Detail sections showing

Gross requirements

Scheduled receipts

Planned orders

Bill of material and engineering changes

Expired lots, and

Byproduct information

45

OPM MPS Enhanced Material Activity Report


A revised OPM report against source transaction data
Lists (in chronological order):
Pending inventory transaction activity for an item in a
specific warehouse, or
All warehouses over which the planner has authority

Helps buyers decide which requisitions and suggested


purchases should be approved
Helps planners decide when to convert firm-planned
orders to batches
Indicates when batches should be rescheduled,
consolidated, or canceled

46

OPM MPS Enhanced Bucketed Material Report

A revised OPM report against source transaction data


Lists pending transaction information for a single item
in one or more warehouses in specified time buckets
Groups transactions into categories such as purchase
order receipts and planned production
Time bucket-based format

47

Oracle Inventory Reorder Point Report

An existing report replacing OPM Reorder Point Report


Suggests a new order for an item when the available
quantityonhand quantity plus planned receipts
drops below the items safety stock level plus forecast
demand for the item during its replenishment lead time.
Improves overall customer service by reducing stockout probability.

48

ASCP Planning Detail Report

OPM users now have access to this existing report by


virtue of the merging of OPM MRP into ASCP.
This report requires Oracle Discoverer
For a given supply chain plan, the report includes the
relevant details about items, resources, gross
requirements, scheduled receipts, planned orders, plan
constraints, and exceptions in separate worksheets
The report gives detailed information to help you
understand and analyze the supply chain planning
results by presenting the data selectively and
coherently

49

Topic Overview: Recommendations

Introduction
Reschedules exception messages
Orders to be rescheduled out exception message
Viewing recommendations
Make item
Buy item
Transfer item
Firm planned orders
Releasing recommendations

50

Introduction
Demand

Demand

Supply

Supply
Reschedule existing
orders out

Create
new orders

Planning

Demand

Demand
Supply

Supply

Reschedule existing
orders in

Cancel
existing orders

51

Reschedules Exception Messages


Exception messages that refer to recommendations:

Past due orders


Orders to be rescheduled out
Orders to be cancelled
Orders to be rescheduled in
Orders with compression days
Orders scheduled to next inventory point
Order is firmed late
Requirement is firmed late
Order is firmed early
Requirement is firmed early
Shared supply scheduled late

52

Orders To Be Rescheduled Out Exception


Message

Demand

Supply

Reschedule existing orders out

53

Viewing Recommendations

Exceptions
Supply/demand

54

Viewing Recommendations

55

Viewing Item Planning Information

56

Viewing Item Planning Information

57

Viewing Item Planning Information

58

Viewing Item Planning Information

59

Releasing Recommendations

Org
Item
For Release
Firm
Order Type
Suggested Due Date
Orig. Qty
Order Number
Action : Recommendation
New Date
New Qty
60

Releasing Recommendations

61

Releasing Recommendations

62

Releasing Recommendations

63

Releasing Recommendations

64

Summary

In this module, you should have learned how to:


Describe exceptions
Describe unconstrained exception messages
Describe recommendations

65

Integrating Advanced Supply Chain Planning


with Other Oracle Applications

66

Objectives

After completing this module, you should be able to:


List types of manufacturing environments that are
integrated with Advanced Supply Chain Planning
List and describe relevant integration points between
the following Oracle applications
Demantra Demand Management (DM)
Advanced Planning and Scheduling (APS):

Advanced Supply Chain Planning (ASCP)

Inventory Optimization (IO)

Production Scheduling (PS)

Strategic Network Optimization (SNO)

67

Topic Overview: Mixed Mode Manufacturing


Planning
Plan manufacturing and distribution operations for
hybrid manufacturing methods:
Discrete Manufacturing:

Oracle Shop Floor Management

Oracle Engineering Bills of Material


Oracle Project Manufacturing
Oracle Flow Manufacturing
Oracle Process Manufacturing

Simultaneously plan make-to-stock, make-to-order,


assemble-to-order, and configure-to-order
products, using a single plan across all methods.

68

Mixed Mode Manufacturing

Support for common features in hybrid manufacturing


environments:
Phantom routings
Utilization efficiency
Routing effectivity
Sequence-dependent setups
Simultaneous, aggregate, and alternate resources
Co-products
Lot-based component usage

69

Integration with Oracle Project Manufacturing

Include project, task, or Seiban numbers in planning data.


Manage planning data with project, task, or Seiban
numbers.
Recognize, allocate, and combine supply and demand
information with common plans.
Perform netting by planning groups, project or Seiban, and
tasks.
Generate and execute planned orders with project or
Seiban, and task references.
Implement planning suggestions for planned orders.

70

Integration with Oracle Flow Manufacturing

Supply chain synchronization


Improve supply-chain throughput and reduce inventories
Decrease manufacturing times and increase
manufacturing plant throughput

Support for flow schedules


Define and manage flow schedules
Release flow schedules

Support for demand management


Support for Kanban planning and execution

71

Integration with Oracle Process Manufacturing

Support for complex routings


Support for contiguous operations
Support for managing material shelf life
Support for Oracle Process Manufacturing planning
convergence

72

73