USING
COMPONENTS
&
THE CONCEPT of
BUILDABILITY
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
CONTENTS
Concept of Buildability
Examples of Prefabricated Components
Used in Buildings
General Guidelines on Design Concepts
Using Components
Examples of Projects Employing
Components
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
BUILDABILITY
Defined as the extend to which design of the
buildings facilitates ease of construction,
subject to the overall requirements of
completed building.
Ditakrifkan sebagai "meliputi reka bentuk bangunan bagi memudahkan
pembinaan, tertakluk kepada keperluan keseluruhan bangunan siap."
DESIGN
Impact of
design
decisions
BUILDABILITY
Influence
on design
decisions
CONSTRUCTION
Applies to soft (management) and hard (technical) aspects.
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
WHY BUILDABILITY
Problems existed in CI .comparative
isolation of many designers from practical
construction process. The shortcomings as
seen by builders .., due to the separation
of design and construction functions which
has characterised the building industry over
the last century or so.
pemisahan reka bentuk dan pembinaan fungsi yang mempunyai ciri-ciri industri pembinaan
sejak abad yang lalu atau lebih.
CIRIA
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
BUILDABILITY
Also defined as the ability to construct a
building efficiently, economically
and to agreed quality levels from its
constituent materials, component and
sub-assemblies.
Juga ditakrifkan sebagai "keupayaan untuk membina sebuah bangunan yang
cekap, berhemat dan tahap kualiti yang dipersetujui dari bahan konstituennya,
komponen dan sub-pemasangan ".
KEY FEATURES OF
BUILDABILITY DESIGN
Usage of Components
Employment of Modular Coordination
in Dimensions
WALL COMPONENTS
Precast Concrete Panels
Metal Claddings
Traditional Design Repetition of
Components
TYPICAL EXAMPLES of
COMPONENTS
Precast
Column
Precast Beam
Precast Planks
Precast Staircase
OTHER EXAMPLES
Self compacting concrete
Tunnel form construction
Hybrid concrete construction
Post tensioned construction
Tilt up
EXAMPLES of ADVANCED
COMPONENT PRODUCTS
Tunnel Form
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Box System
Prefabricated Bathroom
Unit
3D Components
Container
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Spacebox
BENEFITS of BUILDABILITY
Practical Buildability, the result of a CIRIA
study, will prove valuable to practising civil
and structural engineers, designers,
builders, quantity surveyors and
architects.
Buildability praktikal, hasil daripada kajian CIRIA, amat bernilai
kepada para pengamal seperti jurutera, pereka, pembina, juruukur bahan
awam serta struktur dan arkitek.
Manufacture in Factory
Conventional Method
On site Precast
Tunnelling System
Erection
High Productivity
Advantages
AESTHETICS
Appearances of materials,components, subassemblies and of the complete building: size,
shape, colour, texture, pattern, etc;
experience of materials,components, subassemblies and of the complete building:
quality of spatial relationships, pleasure in
use, relationship to surrounding, etc.
Architecturally Finished
Precast Concrete Frames
Capital Bank in Chester:
excellent example of how design
can be positively influenced by
skilled input from a specialist
contractor.
The result was a fully precast
architecturally finished structure.
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Safety
Finished components are delivered to site
and lifted directly from the vehicle into
position on site, often without the need for
scaffolding. This reduces the potential for
accidents, and removes the risk of handsetting stone or brickwork in potentially
hazardous locations.
Environment
Precast production uses less energy than
that required for either structural steel
frame components or system curtain
walling. On site, precast construction
creates less air pollution, noise and debris.
Road traffic to and from the site is also
reduced.
PRINCIPLES OF BUILDABILITY
Standardisation
Simplicity
3 Ss
1.
Standardisation
Repetition of Grids
Sizes of Components
Connection of Details
2.
Simplicity
3.
Systems Building
"System building" refers to a building in which
methods for adjusting the individual component
systems for the building -- such as main
structure, external wall, and windows -- are
established.
At NEXT21, a highly flexible architectural
system is being put into practice. This
component system is divided into four groups
according to the required life of each component
and production path, and are then manufactured
as separate systems and modules so that outer
walls, kitchens, baths and toilets, and gardens
can be moved.
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
COST
materials, components, sub-assemblies and
conversion one to the other
labour needed to design, manage and
assemble the building
tools, plant and equipment needed to assemble
the building
providing certain level of durability (life-cycle
costs)
Location
Building
200,000.00 m2
Contract
Specified
Construction Period
Main Contractor
Gamuda Berhad
Owner
Architect
Structural Eng.
Ministry Of Health
Public Works Department
Public Works Department
Precast Elements
Supplied
Scope of Works
Location
Building
10 storey building
60,000.00 m2
Contract
Specified
Construction Period
Main Contractor
Owner
Architect
Structural Eng.
Ministry Of Health
Public Works Department
Public Works Department
Precast Elements
Supplied
Scope of Works
Location
Building
121,000m2
Contract
Construction Period
Main Contractor
Owner
Architect
Structural Eng.
Scope of Works
Supply and Install Precast Columns, Precast Beams, Hollow Core Slabs, Precast Solid Planks, Precast Shear Walls,
Precast Staircases, Precast Gutters, including all the associated Cast In-situ works to Precast and Cast In-situ area
design.
Location
Building
7,500m2
Contract
Construction Period
Main Contractor
Owner
Architect
Structural Eng.
Precast Prestressed Hollow Core Slab Precast Beam and Precast Column
Scope of Works
Supply and delivery of Precast Columns, Precast Beams, Hollow Core Slabs,
Location
Building
3-storey factory
7,500 m2
Contract
Alternative Design
Construction Period
Main Contractor
Owner
Architect
Structural Eng.
Precast Elements
Supplied
Scope of Works
Location
Building
Townhouse
3200 m2
Contract
Alternative Design
Construction Period
Main Contractor
Owner
Architect
Structural Eng.
MK Developer
Veritas Architect
Eastern Pretech (M) Sdn Bhd
Precast Elements
Supplied
Scope of Works
Buildable Features:
Structural components standardised to a single size
Precast elements-arch.concrete lattices, ring water tanks, curved auditorium walls,
perimeter fencing wall
Buidability and aesthetics could be achieved without compromising one another
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
standardised grids and repetitive floor layouts, use of flat floor slabs resulted in less
columns and bigger span
integrated roof system, lightweight concrete blocks - no plastering needed, faster
construction
monospace lift - expedite construction and increase usable space
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Modular horizontal and vertical grids, repetitive floor layouts, use of system formwork for
efficiency
precast columns, beams, slabs and staircases - on-site and off-site
RC external walls - use of jumping formwork enabled walls to be cast three storey ahead of
each floor slab
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Successful integration of cast stone and brick resulted in a building that was contextual
to the existing campus
the juxtaposition scale between cast stone and brick module and the playful movement
between curved and orthogonal plane made for an exciting project
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
APA AWARDS
THE EMORY UNIVERSITY PARKING DECK
Project commended for the ability to transform a difficult faade into a work of art. The
window/bay patterns create a rhythm along the faade developing a human scale not
often found in parking decks.
The architectural faade is express as an applique to the concrete structural frame in a
contemporary and genuine fashion was well done
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
APA AWARDS
THE KING FARM OFFICE BUILDING
The proportion of massing and articulation of base, body and top contributed to the
building monumental appearance
the attention to detail and use of natural light made the building visualyy exciting and
the consistency of colour and finish was well done
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Heat Insulation
Existence of voids in hollow core slabs
provide heat insulation.
Cool comfort, less consumption of aircon.
Gives better heat insulation for roof
Less Labour
Labour usage is very low. One team needs
about 4 to 5 people only.
Less worker on site to manage.
Labour savings in general about 70%.
Lembaga Pembangunan Industri Pembinaan Malaysia
Construction Industry Development Board Malaysia
Environmental Friendly
Less noise pollution on site.
Less cutting of trees since formwork less
needed on site. (Factory uses steel
moulds).
Durability / Low Maintenance Cost
High strength concrete (G50) resist
damage better than cast insitu structure.
Buildability:
Successful
Construction from
Concept to
Completion
Trevor M. Holroyd
2004, American
Society of Civil
Engineers (Thomas
Telford, Ltd.)
THANK YOU