Engineering Team
2006
-1-
Organization
Organization Diagram
Project T/F
C/A
Material
Standards
Noise
Q/A
Proposal
Proposal
Execution
DESIGN PART
Stress
SPECIAL PART
-2-
MECHANICAL
PLOT PLAN
LINE SCHEDULE
MAIN CABLE ROUTING DRAWINGS
LIGHTING PLAN
CATHODIC PROTECTION PLAN
ENGG DRAWINGS
VENDOR PRINTS
NOZZLE ORIENTATION
INFORM DRAWINGS
PIPING INPUTS TO PACKAGE
PIPING
ENGINEERING
ELECTRICAL
PLOT PLAN DRAWINGS
PLOT PLAN
DRAWINGS
PIPING PLAN
DRAWINGS
PROJECT SCHEDULE
CLIENT REQUIREMENTS
PROJECTS
-3-
INSTRUMENT
CASE 3
CASE 2
-4-
CASE 1
30%,60%,9
0%
-5-
Piping Deliverables
Piping Deliverables
- Plot Plan
- 3D Model
- Isometric Drawing
- Piping Bill of Material
Bill of Material
Section Introduction
Design
Matl
MATERIAL
Major Work
Work Flow
-7-
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
MATERIAL
Major Work
Work Flow
-8-
Matl
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
Matl
F/F
Noise
Stress
HVAC
MATERIAL
Major Work
Work Flow
Line Schedule
Piping Material Class Data
-9-
C/A
Section Introduction
Design
Matl
F/F
Noise
Stress
FIRE FIGHTING
Major Work
Work Flow
F-2501B
F-2501A
Calculation by
Code
G-2513
G-2523
FF2502 2502
A
A
F2502
B
-10-
HVAC
C/A
Section Introduction
Design
Matl
FIRE FIGHTING
Major Work
Work Flow
- PIPENET
Fluid Flow Analysis
Design for General Steady Flow of Liquids, Gases and Steam
Design for Fire Protection System (Deluge, Ring Main, Springkler, Foam Solution)
-11-
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
NOISE CONTROL
Major Work
Work Flow
-12-
Matl
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
Matl
F/F
Noise
STRESS ANALYSIS
Major Work
Work Flow
-13-
Stress
HVAC
C/A
Section Introduction
Design
STRESS ANALYSIS
Major Work
Work Flow
-14-
Matl
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
Matl
F/F
Noise
STRESS ANALYSIS
Major Work
Work Flow
- CARSAR II
Structure Analysis
Dynamic Analysis
Thermal Analysis
FE PIPE
Stress
HVAC
C/A
Section Introduction
Design
Matl
F/F
Noise
Stress
HVAC
C/A
HVAC
Major Work
Work Flow
- Design HVAC system for plant buildings, which require specific temp., humidity, internal pressure and
cleanliness under various conditions.
- Preparation of System Diagram and Duct/Piping Plan
- Equipment Sizing & Selection
Comfortable Office
always 18~26
30~70% Humidity
Enough Oxygen
From Room
Sun
Tempe
rature
Humi
dity
Out of
Building
XXX
Gas
Dust,
Sand
Pressurization
To
Room
Explo
sion
Prevent from
gas and dust
Explosion Proof
Section Introduction
Design
Matl
F/F
Noise
Stress
HVAC
Work Flow
ISO. DWG.
3D Model
Customizing
PGMs
3D Reports
Plan DWG.
Model Review
-17-
C/A
Section Introduction
Design
Work Flow
-18-
Matl
F/F
Noise
Stress
HVAC
C/A
Section Introduction
Design
Matl
F/F
Noise
Stress
HVAC
Work Flow
VENDOR
Intergraph, US
3D CAD
SYSTEM
PDMS
LICENSE
MODEL REVIEW
PDS
SmartPlant Review
AVEVA, UK
PDMS
Review Reality
Bentley, US
PlantSpace
PlantSpace Navigator
PDS
-19-
3D CAD
REVIEW
27
+8(SEI)
11
+4(SEI)
48
C/A
21%<Progress <30%
Actualization of Vision
PIMS
3D
CAD
FMC
Material Data
Line Information
Weld DIA. Data
3D Design
Bill of Material
Model Review
Model Review
Construction
Field
Const. Progress Control by Model Review
CPR
Wrap up
Q&A
-22-