You are on page 1of 41

KD Blansko

Engineering, a.s.

KD Blansko Engineering
KD Blansko Engineering is an engineering and supplier company focused on complete supplies and mechanical equipment technologies for hydro
power plants, pump stations and water structures: standard and reversible hydraulic turbines of all types and sizes and pumps.
KD Blansko Engineering performs not only turnkey supplies of new equipment, but also rehabilitations, upgrades and overhauls of existing units.

KD Blansko Engineering has been a member of the LITOSTROJ POWER Group since 2006.
KD Blansko Engineering is a member of international organizations - IAHR, IHA, Euro-Pump,
IEC/TC4

LITOSTROJ POWER Group - organizational schedule

LITOSTROJ POWER BH
Bosnia and Herzegovina
Tuzla

LITOSTROJ POWER
Slovenia
Ljubljana

LITOSTROJ POWER
Company headquarters, factory

LITOSTROJ HYDRO
Canada
Bromont
KD BLANSKO ENGINEERING
Czech Republic
Blansko

KD Blansko Engineering, a.s.


Company headquarters

KD Blansko Engineering, a.s.


Hydraulic laboratory

KD Blansko Engineering, a.s.


Hydraulic laboratory

Reference projects

KD Blansko Engineering
(160 employees)

General Meeting
Board of Supervisors
Board of Directors
Chairman
of Board of Directors
system

Research and Development


Center

Sale and Project


Management

Realization

Economy and
Administrative

KD Blansko Engineering - historical development

KD Blansko Engineering claims


allegiance to the history of hydraulic
machine research in Blansko as
a direct successor. The
history
of the hydraulic
machine production in Blansko goes
back
to
the beginning of the 20th century
when the first hydraulic turbine was
manufactured there. KD Blansko
Engineering came into existence
in 1996 as an independent joint
stock company by separation
of the Hydraulic turbines Design department, Commercial
department and especially the
Research
and
development department, including
know how, employees, and transfer
of references from KD Blansko a.s.

Certificates
The company has been regularly certified and respects requirements of the following
standards:

ISO 9001 (quality)


ISO 14001 (environment)

OHSAS 18001 (safety)

Quality requirements of welding as per ISO 3834

Large certificate of qualification for design and manufacture of welded steel


structures as per SN 73 1401, SN 73 2601, SN EN 1090, DIN 18800 and DIN
19704

Fields of activity hydraulic turbines and pumps


Kaplan turbines

Pelton turbines

Straight flow turbines

Head from 5 m to 75 m

Head from 50 m to 1500 m

Head from 1,5 m to 30 m

Output from 200 kW to 100 MW

Output from 100 kW to 300 MW

Output from 100 kW to 20 MW

Runner diameter up to 9500 mm

Runner diameter from 400 mm to 4000 mm

Runner diameter up to 6000 mm

Francis turbines

Pump turbines

Big pumps

Head from 10 m to 800 m

Head / delivery head from 30 m to 600 m

- storage, cooling, irrigation

Output from 200 kW to 300 MW

Output / input from 5 MW to 500 MW

Delivery head from 20 m to 800 m

Runner diameter up to 7000 mm

Runner diameter up to 6000 mm

Input from 5 MW to 150 MW


Impeller diameter up to 2500 mm

Operation range diagram

Field of activity hydro mechanical equipment


Valves and gates
Butterfly valves - DN 400 to DN 6500, for pressure PN 2.5 to PN 24
Knife valves - DN 500 to DN 2000, for pressure PN 2.5 to PN 10
Hollow cone valve - DN 400 to DN 2000 for operation pressure PN 6 and PN 16 and discharge speed up to 25 m.s-1
Cone valves - DN 200 to DN 1200 mm, for operation pressure PN 2.5 to PN 16
Spherical valves - DN 200 to DN 3000 mm, for operation pressure PN 2.5 to PN 24
Flap valves in draft tube - width up to 6 m, height up to 4 m, pressure up to 130 m of water column
Segment (Taintor) gates - for higher head - heights up to 15 m and width up to 20 m
Sluice gates and wheeled quick closing gates quick closing gates in front of turbine
Weir tilting gates for height 1- 6 m and span up to 40 m
Steel structures
Penstocks
Locks
Steel structures
Steel frames and pipings
Thrash racks and cleaning machines

Subject of KD Blansko Engineering activities


Rehabilitations and upgrades of existing and supplies of new hydro mechanical equipment for hydro
power plants and pump stations
Uprating of hydraulic machines - efficiency, output, lifetime and reliability at investment cost
minimization

Scope of offered services

Research and development of hydraulic machines

Measurement of hydraulic and operational parameters on physical models at hydraulic laboratory

Outline design and detail design

Project management

Equipment supplies

Erection, supervision of erection and manufacture

Individual and complex tests at site

Guarantee, diagnostic and documentary measurements of hydraulic machines at site

Commissioning of hydraulic machines and hydro mechanical equipment

Research and development of hydraulic machines and hydraulic


laboratory

Newly designed hydraulic machines

Existing upgraded hydraulic machines

Research of hydraulic turbines, pumps and hydro mechanical


equipment; guarantees of hydraulic parameters are provided
based on model tests or by CFD analyses (ANSYS CFD

Research and development of

optimization)

hydraulic machines

Geometry optimization of hydraulic machine flow parts


increase of efficiency, output and realiability at minimization of
investment costs (ANSYS CFD optimization) workshop
documentation of hydraulic turbine physical models

Physical model measurements in


companys own hydraulic laboratory

Model tests in companys own hydraulic laboratory

Presentation of results at international conferences - IAHR,


Hydroturbo, HydroVision, Hydro, Russia Power, Waterpower

Outline and detail design

Expert studies, expert analysis and


consulting in the field of hydraulic
machines

Elaboration

of

outline

technical

documentation of mechanical part of


technology (AutoCAD)

Determination

of

critical

load

at

transients in hydraulic systems of

Outline design

hydro power plants and pump stations


with

optimization

of

regulation

parameters (Matlab)

Elaboration of detail design workshop


documentation of designed hydraulic
machines (Autocad, Pro Engineer,
Unigraphic)

Detail design

FEM analysis of hydraulic machine


main parts (Ansys Mechanical)

Sale and project management

Costumer
Requirement
Offer
Technicalcommercial
information
Purchase order

Informative offer

Binding offer

Purchase order/contract
Design/model tests
Manufacture by sub-supplier companies

Transport
Erection

Tests and commissioning

Tender

ERECTION, existing equipment repair, overhauls

- of turbines of all types and sizes including hydro power


plant equipment, intake and discharge gates and valves,
regulation, cooling and leakage water equipment, pressure
air,

oil

system,

steel

structures,

hydro

mechanical

equipment and piping systems

Spherical, butterfly, flap and conical valves

Trash racks and cleaning machines

Sluices including control systems

Intake equipment of hydro power plants

Professional supervision of erection


of
hydraulic turbine parts and other hydro mechanical
equipment in Czech Republic and abroad

Guarantee and diagnostic measurements and testing of hydraulic


machines and hydro mechanical equipment at site
Measurement of guaranteed parameters
Discharge determination in closed penstock and discharge determination in open channels
of non-specific profile
Optimization of Kaplan turbine guide vane and runner blade opening relationship
Diagnostic measurements for operational defect removal
Measurement characterizing the equipment existing technical condition
Based on test results, setting optimization to increase
- safety
- working life
- operation reliability
Commissioning of hydraulic machines and hydro mechanical
equipment
Pre-complex and complex testing of hydraulic machines
Individual tests of hydraulic machines and hydro mechanical
equipment
Measurement of turbine unit vibrations
Measurements are performed as per recommendations
of IEC standards

Hydraulic laboratory

Hydraulic laboratory deals with development and acceptance tests of physical


models of hydraulic turbines, pump turbines and pumps in accordance with
IEC60193 international standard, and with discharge calibration.

Hydraulic laboratory
Basic parameters of universal test stands

Hydraulic laboratory
Physical model tests are basic parts of research and development of big and
medium-sized hydraulic machines
Application of automated system of computer data collection and evaluation
to model tests
Model test results are the following characteristics and observations:

efficiency (including discharge, head, torque and speed)


cavitation characteristics

distribution of velocities and pressures

hydraulic load

flow visualization

Reference model tests at hydraulic laboratory of KD Blansko


Engineering
Country

Project

Description

Turbine type

H
(m)

Czech Republic Dlouh Strn


Sweden
Slovenia
India

Hydraulic design, model manufacture, model


tests

Borgforsen

Hydraulic design, model manufacture, model


tests
Hydraulic design, model manufacture, model
Doblar 1
tests
Gangaram (Phase Hydraulic design of pump, model manufacture,
model tests
3)

Sweden

Hllforsen

Iran

Khoda-Afarin

Norway

Klosterfoss

India

Koyna

Canada

Kwoiek Creek

Finland

Lieksankoski

Finland

Pankakoski

Sweden

Moforsen

Vietnam

Ngoi Hut 2

Albania

Peshqeshit

Ecuador

Sarapullo

India

Singrauli

Czech Republic Slapy


Costa Rica

Toro 3

Sweden

Vsa

Poland

ydowo

Hydraulic design, model manufacture, model


tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulicdesign of vert. Deriaz turbine, model
manufacture, model tests
Hydraulic design, model manufacture, model
tests, outline and detail technical documentation
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design of runner and wicket gate,
model manufacture, model tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests

Numbe
r of
(mm)
units

Unit
output
(kW)

Francis reverible

vert.

533

4 540

328000

Kaplan

vert.

554
16

3 900

319 000
19 450

Francis

vert.

47

2 130

13 700

pump

vert.

149

2 015

15 000

Kaplan

vert.

9.3

5 100

14 000

Kaplan

vert.

57

4 500

53 000

Kaplan

vert.

5.7

4 500

8 300

Deriaz

vert.

77

3 900

52 500

Pelton

hor.

513

1 290

14 800

Kaplan

vert.

12.2

3 350

9 300

Kaplan

vert.

10.6

3 350

7 800

Kaplan

vert.

28

5 200

57 000

Pelton

vert.

356

1 720

27 200

Francis

vert.

90

1 550

14 000

Francis

vert.

138

1 650

17 100

Kaplan Stype
Kaplan

hor.

16

2 900

4 630

vert.

53

3 700

55 400

Francis

vert.

270

1 700

26 000

Kaplan

vert.

10.6

4 880

15 800

Francisreversible

vert.

82.7

4 500

50 000
60 400

Selected references - reversible Francis turbine

PSHPP Dlouh Strn Czech Republic


2x reversible Francis turbine
Overhaul and upgrade of unit TG1
Runner diameter:
D = 4 540 mm
Unit output: P = 328 000 kW

Selected references - reversible Francis turbine

PSHPP Daleice Czech Republic


4x reversible Francis turbine
Overhauls of units TG1, TG3 and TG4
Runner diameter: D = 6 000 mm
Unit output: P = 112 500 kW

Selected references - reversible Francis turbine

PSHPP Goldisthal - Germany


4x reversible Francis turbine
Supplies and installation of pump turbine parts
Runner diameter: D = 4 610 mm
Unit output: P = 265 000 kW

Selected references - reversible Francis turbine

PSHPP arnowiec-Poland
4x reversible Francis turbine
Overhaul and upgrade of unit TG2
Runner diameter: D = 2150 mm
Unit output: P = 67 000 kW

Deriaz turbines other selected references

Country

Project

Year of

Description

Equipment type

completio
n

(m)

(mm)

India

Koyna
under execution

2014

vertic.

77

3 900

52 500

Poland

Czorsztyn

1990

vertic.

39.1 / 47.5

4 300

42 000 / 51 300

India

Kadana

1977

vertic.

48.2 / 51

5 000

61 700 / 65 000

Slovakia

Liptovsk Mara

1974

vertic.

46.6 / 48

4 600

50 300 / 52 900

Selected references Francis turbines


HPP Lipno Czech Republic
2x Francis turbine
Overhaul and upgrade of unit TG2
Runner diameter: D = 2150 mm
Unit output: P = 67 000 kW

Francis turbines other selected references


Country

Project

Year of

Description

Equipment type

completi
on
Czech Republic

Lipno

2014

Overhaul and upgrade of unit TG2, hydraulic


design, supply of new parts, erection,
testing and commissioning

Francis

vert.

Number

(m)

(mm
)

of units

162

2 150

Unit
output
(kW)
67 000

Georgia

Khrami GES-2

2013

Supply of equipment for butterfly valve


control, measurement supervision, testing
and commissioning

Francis

vert.

306

2 530

59 300

Ecuador

Sarapullo

2013

Model manufacture, model tests

Francis

vert.

138.4

1 650

17 100

Albania

Peshqeshit

2013

Francis

vert.

90

1 530

14 000

Costa Rica

Toro 3

2010

Francis

vert.

270

1 700

26 000

Congo

Mwadingusha

2009

Francis

vert.

111

1 730

12 000

U.S.A.

Parker Dam

2004

Hydraulic design, model manufacture,


model tests
Hydraulic design, model manufacture,
model tests
Rehabilitation of unit TG5, erection, repair,
testing, commissioning
Model tests

Francis

vert.

25

4 740

40 000

Pakistan

Mangla

2003

Reulation rehabilitation of TG5 and TG6

Francis

vert.

125

4 000

103 000

U.S.A.

Round Butte

2002

Model tests

Francis

vert.

110

3 500

127 000

Colombia

Dolores

1999

Hydraulic design, technical documentation,


erection supervision, commissioning

Francis

hor.

95

1 130

8 186

Georgia

Khrami

2001

Francis

vert.

324

2 500

55 300

Greece

Messochora

2001

Francis

vert.

225

2 800

82 650

India

Kundah

1997

Hydraulic design, model manufacture,


model tests
Hydraulic design, technical documentation,
model tests, erection supervision, dry tests
technical
documentation,
erection,
commissioning

Francis

hor.

210

1 800

36 475

Selected references Kaplan turbines

HPP Gabkovo Slovakia


8 x Kaplan turbine
Runner diameter: D = 9 300 mm
Unit output: P = 90 000 kW

Selected references Kaplan turbines

HPP Lubilanji II - Congo


6x straight flow PIT turbine
Hydraulic design, supplies, erection, commissioning
Runner diameter: D = 1 500 mm
Unit output: P = 1 750 kW

Kaplan turbines other selected references


Country

Project

Year of

Description

Equipment type

completi
on
Czech Republic

Kamk

2014

Sweden

Borgforsen

2013

Brazl

Ibitinga

2013

Sweden

Hllforsen

2013

Sweden

Moforsen

2012

Sweden

Vsa

2012

Finland

Lieksankoski

2011

Iran

Khoda-Afarin

2011

Czech Republic

Slapy

2011

Czech Republic

Kamk

2008

Czech Republic

Orlk

2004

Czech Republic

Slapy

2003

Czech Republic

tchovice I

2003

Rehabiltation and overhaul of unit TG1,


hydraulic design, model manufaxcture, model
tests, supplies of new parts, erection, testing
and commissiining - under execution
Hydraulic design, model manufacture, model
tests
Technical assistance during overhaul of units
TG1 andTG3, supervision of manufacture and
erection
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Hydraulic design, model manufacture, model
tests
Upgrade and overhaul of unit TG3, hydraulic
design of runner and wicket gate, model
manufacture, model tests, supplies, repair,
installation, testing and commissioning
Upgrade and overhaul of unit TG3, hydraulic
design,
supplies,
repair,
installation,
commissioning
Overhaul and rehabilitation of units TG1, TG2
and TG4 after flood
Supply, tests and handover of provisional
stoplogs of downstream outlet channels
Rehabilitation
of
unit
TG1,
erection,
commissioning

(m)

(mm)

Numb
er

Unit
output

of
units

(kW)

Kaplan

vert.

15.5

3 800

12 100

Kaplan

vert.

16

3 900

19 450

Kaplan

vert.

21

6 000

45 000

Kaplan

vert.

9.3

5 100

14 000

Kaplan

vert.

28

5 200

57 000

Kaplan

vert.

10.6

4 880

15 800

Kaplan

vert.

12.2

3 350

9 300

Kaplan

vert.

57

4 500

53 000

Kaplan

vert.

53

3 700

55 400

Kaplan

vert.

15.5

3 800

12 100

Kaplan

vert.

70.5

4 600

95 900

Kaplan

vert.

56

3 700

50 000

Kaplan

vert.

20

3 600

13 500

Selected references Pelton turbines


HPP Khrami GES 1 Georgia
2x Pelton turbine
Supply of runner
Runner diameter: D = 2520 mm
Unit output: P = 38 000 kW

Pelton turbines other selected references


Country

Project

Year of

Description

Equipment type

completi
on

Vietnam

Ngoi Hut 2

2013

Hydraulic
design,
model
manufacture, model tests, technical
documentation, supply of 2new
runners

(m)

(mm)

Numbe
r

Unit
output

of
units

(kW)

Pelton

vert.

356

1 720

27 200

- under execution
Canada

Kwoiek Creek 2013

Hydraulic
design,
model
manufacture, model tests, outline
and detail technical documentation

Pelton

hor.

513

1 290

14 800

Vietnam

Yan Tann Sien 2009

Hydraulic design, technical


documentation

Pelton

hor.

685

1 350

10 164

India

Tillari

Hydraulic design of runner, supply,


erection supervision and
commissioning

Pelton

vert.

625.4 2 020

68 200

2004

Selected references - small hydro power plants


SHPP Les Krlovstv
- Czech Republic

SHPP ur - Poland

2x Kaplan vertical turbine


Rehabilitation and upgrade of SHPP

Runner diameter: D = 2 410 mm


Unit output: P = 4 735 kW

2x Francis turbine
Overall turnkey rehabilitation of SHPP
Runner diameter: D = 1 040 mm
Unit output: P = 1 180 kW

Small hydro power plants other selected references


Country

Project

Year of

Description

completi
on

Equipment
type

Number

Unit

(m)

(mm
)

of units

outpu
t
(kW)

Sweden

Gvunda

2014

Peru

Curumuy

2013

Czech Republic

Vranov 2

2012

Poland

Wroclaw I.

2010

Czech Republic

Vran

2009

New Zealand

Mangaio

2008

Czech Republic

Vran

2007

Czech Republic

Stekov

2006

Czech Republic

Vydra

2004

Australia
Czech Republic

Burrendong
Kruberk

2003
2003

Czech Republic

Vranov

2003

Democratic
Republic of
Congo (Zare)
Czech Republic

Lubilanji-II
BIS

2003

Vranov

2002

Czech Republic

Vr

2001

2001

Hydraulick design, technical documentation, runner


supply, other supplies, erection, testing, commissioning
under execution
Technical assistance, installation supervision, testing,
commissioning, supplies of spare parts
Supply of complete technological equipment for new
SHPP
Overhaul and upgrade of unit TG2, hydraulic design of
guide vanes and runner blades, supply of new runner
blade set and new guide vane set, commissioning
Upgrade and overhaul of unit TG1, hydraulic design,
technical
documentation, supplies, erection, testing,
commissioning
Supply of new SHPP. Outline and detail technical
documentation, supply of new Francis turbine incl.
asynchronous generator, butterfly valve, hollow cone
valve, spare parts, commissioning
Upgrade and overhaul of unit TG2, hydraulic design of
runner blades, technical documentation, supplies of new
parts, erection, commissioning
Overhaul and rehabilitation of unit
TG1, supplies,
erection, commissioning
Hydraulic
design
and
runner
supply,
erection,
commissioning, wicket gate repair
Supply of 2 new runners of Francis turbine
Upgrade and overhaul of SHPP unit, technical
documentation, supply of new parts, erection, testing,
commissioning
Overhaul and upgrade of units TG3 and TG1, hydraulic
design of runner, technical documentation, erection,
testing, commissioning
Hydraulic design, technical documentation, supplies,
erection, commissioning
Overhaul and upgrade of unit TG2, hydraulic design of
runner, techjnical documentation, erection, testing,
commissioning
Overhaul of unit TG1, supply of new parts, erection,
testing, commissioning

Kaplan

vert.

19.1

2 550

8 550

Kaplan

39

1 650

6 900

Francis

vert.

37

700

810

Kaplan

hor.

5.2

3 000

2x Kaplan
(2x Francis

1 760

Kaplan

vert.

10

3 600

800
8 000

Francis

hor.

50

850

2 000

Kaplan

vert.

10

3 600

8 000

Kaplan

vert.

10

4 300

6 000

Francis

hor.

235

1 000

4 200

Francis
Francis

hor.
vert.

36.9
71

1 660
1 000

2
1

5 640
4 380

Francis

vert.

42

2 000

6 300

Kaplan PIT

hor.

13.8

1 500

1 750

Francis

vert.

42

2 000

6 300

Francis

vert.

64

1 150

6 440

Selected references pumps

Chokka Rao India

Pump stations: Gangaram, Dharmasagar, Bhimghanapur,


Salivagu
8 x pump
Hydraulic design of pump, detail design
and workshop documentation, model
tests, manufacture and installation
supervision, testing and commissioning,
supplies
Impeller diameter:
D = 1 940 1 980 mm
Unit output:
P = 9 850 11 350 kW

Pumps + pump stations selected references


Country

Project

Year of

Description

Equipment type

completi
on

India

Gangaram

2013

Hydraulic design of pumps, model

(m)

(mm)

Numbe
r

Unit
output

of
units

(kW)

pump

vert.

149

2 015

15 000

pump

vert.

131

1 945

10 880

138

1 980

11 350

field tests

123

1 880

9 850

Supply of 8 impellers and rotating

130

1 940

10 550

110

4 200

45 000

manufacture, model tests, outline

(Phase 3)

and detail design documentation,


erection, supply of 7 impellers,

India

Chokka Rao

2012

testing, commissioning
Hydraulic design of
outline

(Phase2)

and

pumps,

detail

documentation,

Pump station

manufacture,

- Gangaram,

supervision

- Dharmasagar

- Salivagu

tests,

supervision,
of

commissioning,

Bhimghanapura
m

model
model

manufacture

design

testing
supervision

and
of

parts + spare impellers

U.S.A.

Grand Coulee

2001

Model tests

pump

vert.

Selected references hydro mechanical equipment

PSHPP
Daleice
Republic

Czech

1x lattice blade of butterfly quick closing valve of


unit TG2
New hydraulic design, erection
Diameter: D = 5 400 mm
Weight: m = 60 400 kg

Hydraulic equipment other selected references


Country

Project

Year of
completi
on

Description

Georgia

Khrami GES-2

2013

Germany

Markersbach

2008

New Zealand

Mangaio

2008

Supply of equipment for butterfly valve control, test supervision, testing


and commissioning
Rehabilitation and upgrade of flap vales in draft tube pump turbines A, B,
C, D, E and F dimensioned 4800x3600x1000 mm
Technical documentation and FEM calculation, disassembly, back
assembly, commissioning

Supply of new small hydro power plant

Democratic Republic
of Congo (Zare)

Inga

2006

Czech Republic

Daleice

2005

Czech Republic
Czech Republic
Slovak Republic

Bystika
Hracholusky
Doma
Run
Botocan
Daleice TG3

2004
2004
2003

New Zealand
Czech Republic

2001
1999

Outline and detail design documentation, supply of new Francis turbine


incl. asynchronous generator, butterfly valve, hollow cone valve, spare
parts, commissioning
Supply of 4 stoplog gate dimensioned 3,9 x 4,5 m in draft tube inlet incl.
installation and 2 stoplog gates dimensioned 4,5 x 9,1 m in draft tube
incl. installation supervision
Overhaul of quick closing butterfly valve of unit TG4 DN 5400 PN16 incl.
research and shape design of rotating disc, outline and detail design
documentation, supplies of new parts, installation, commissioning
Supply and installation of stoplog gate, flap valve and hollow cone gate
Repair and rehabilitation of two hollow cone valves DN 1400
Repair of quick closing gate of unit TG1
Supply of 2 butterfly valves DN1200 PN22
Overhaul and upgrade of unit TG3, supply of new parts, technical
documentation, installation, testing, commissioning
Overhaul of quick closing butterfly valve DN5400 PN16 incl. outline and
detail design documentation, supplies, erection, commissioning

Hydro power plants significant renewable and ecofriendly sources of electric energy
Experience in using water for electric
energy generation for longer than 130
years;
Long lifetime with low operational costs
resulting
from
equipment
correct
operation and maintenance;
Controlable energy source in comparison
with solar or wind sources;
Multipurpose use of storage lakes for
hydro power plants;
Capability of quick operation start in tens
of seconds and immediate response to
electric grid demands;

80% share of hydro power plants in total electric


energy generation from renewable sources
worldwide;
3% share of hydro power plants in total electric
energy generation in Czech Republic;

Pumped storage power plants


Capability of quick starting in operation in tens of seconds and immediate response to electric grid requirements (energy
delivery and consumption) peak source of electric energy
Capability of indirect storage of high quantity of electric energy

Standard operation modes of turbine units at pumped storage hydro power plant time was measured at PSHPP Daleice

KD Blansko Engineering, a.s.


apkova 2357/5
678 01 Blansko
Czech Republic
tel.: +420 515 554 561
fax: +420 515 554 588
e-mail: info@cbeng.cz
www.cbeas.com

You might also like