Item
1.
2.
3.
4.
5.
Is
the
geotechnical
provided?
6.
8.
9.
Are
the
technical
specifications
presented?
Are the general plan, elevation sections
and details of flood control/drainage and
other related structures indicated?
Are the following analysis/calculations
undertaken?
a. Hydrologic/Hydraulic
10.
b.
Comments
(boring
log)
N/A
Item
#
a.
32.
33.
34.
35.
36.
36.
37.
37.
38.
Comments
39
.
40
.
41
.
42
.
43
.
43
.
45
11
.
12
.
b.
Slope Stability
13
.
c.
Overall Stability
14
.
d.
Scour
15
.
e.
Is there any detailed
quantitycalculations?
16
.
f.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Are
the
following
survey
requirements
indicated?
a. Benchmarks
used
in
the
surveys
(reference elevation)
a. Azimuth for alignment of revetment (flow
control structure) longitudinal axis
26
.
27
.
28
.
29
.
a. Directional
(northing)
c.
30
.
31
.
sign
b.
sign/informatory
#
47
.
N/
A
48
.
49
.
50
.
51
.
Item
Is the detail of anchorage of retards
and pile hurdles to the bank indicated?
Are the following requirements for the
dike details indicated?
a. Elevation at the proposed top of
dike in plan/profile, cross section
and typical section indicated?
a. Elevation at proposed berm of dike
in plan/profile, cross sections and
typical section indicated?
a. Side slopes, top width of dike in
cross sections and typical section
presented?
d.
Description
and
degree
of
compaction of embankment material
in typical section indicated?
Comments