Professional Documents
Culture Documents
TPM & 3
Awareess
Programme
BMMIL/HR/201516
BMMIL/HR/201516
INTRODUCTION
Efficient work and quality
require clean environment,
safety and discipline
AIM TO IMPROVE THE
CONDITION
5S
1. 5S is a workplace organization technique
2. It is a way to involve associates in the
ownership of their workspace
3. It helps create and maintain the efficiency
and effectiveness of a work area
Why 5S
Safety
Quality
Productivity
Clean
Environment
Good housekeeping
promotes
Good Housekeeping
Inventory of
every item
Place for
every thing
Why do we
need?
Get rid of
unwanted
material
Low inventory
means less
cost
Good Housekeeping
Identification
system in the
dept.
Every thing
in its
place
Discipline
in the dept.
Searching
time is
eliminated
Improved
productivity &
high moral
SOR
T
When in
doubt
move it
out- RED
TAG
techniqu
e
SET IN
ORDERT
A place
for
everyth
ing
&
everyth
ing in
its
SHIN
E
Clean
&
inspe
ct/
inspe
ct
throu
gh
STANDARDI
ZE
Make
up the
rules,
follow
and
enforce
them
SUSTAI
N
Part of
daily
work it
becomes
a habit
1S
SEIRI
SEITON
2S
3S
4S
5S
SEISO
SEIKETSU
SHITSUKE
Sorting
2. Seiton
Systematic
3 Seiso
4 Seiketsu
Standardize /
Sanitation
5. Shitsuke
Self discipline
Discipline yourself.
Systematic
Organizatio
n
Seiri
Cleanup
Orderlines
s
Cleanlines
s
Seiton
Seiso
Seiketsu
Seiketsu
Standardization/Perseverance
Shitsuke
Steps of 5S
Planning & Starting
5S
Implementation
Plan
Step 1 PLANNING
Establish 5 S
Implementation Team
Step 2-EVALUATION
Step 3 Develop
Implementation
Communication Plan
Systematic
Organization
Step 4- Develop
Step 5
5 S Training
Plan
Implement
5S
Progressive
Enhancements
Standardization
Cleanliness
Visual
Placement
Step 6 - Verification
of Effectiveness
5S
Boundaries
Maintained By
Area 1 TG
Maintained By
Maintained By
Area 3
BOP
Maintained By
Area 2
Boiler
Area 4
CHP
5S Steps
1S - Sorting
2S Simplifying
Needed & not needed items are mixed throughout work area
Needed and not needed items have been sorted & not needed
have been removed from work area
A list of needed items for the work area has been documented
5S Steps
Level
3S
Systematic
Cleaning
Key work area items to be checked during a sweep are not identified
Visual controls for equipment, files and supplies have been established
for the work area
Work area SOP are identified and documented for needed item
organization and work area controls
Work area SOP for needed item labeling and visual controls are
posted and followed by work team
4S Standardizi
ng
5S Steps
Level
5S
Sustaining
1
2
3
4
The outcomes of 5S
A standard is set :
Only items that are required or essential to support
the work are held in the area.
Essential items are organised and located in a set
position to support effective and efficient work, with
the view of minimising wasteful motion.
Tools, plant and equipment are maintained to
support safe operations and ensure good working
conditions.
BMMIL/HR/201516
BMMIL/HR/201516
BMMIL/HR/2015-16
PROCEDURE
The Conditions required for enforcing 1s is
as follows:
MUST CONDITION: List of required items (for each of the
Plant:
Circle no:
SI. NO
Item Description
Area
Specification
Quantity
Sorting
1S - SEIRI - SORTING
1S - SEIRI - SORTING
BMMIL/HR/2015-16
6 Steps of 1S
Steps
Step 1
Step 2
Step 3
Activity
Make List of item existing at Present
Decide Usage Frequency of Each Item
Divide this into five Category : A)Items to
keep at Work Area B)Items to be kept in
another Area Managed by User
C)Items to be kept at common place like Store
D)Items not required by this area but other
areas E)Items not usable by own / other Areas
Remarks
As per above format
-Do Items A) , B)
Required Items for
your Area
Items C) , D), E)
Not Required Items
for your Area
Step 4
To be mentioned in the
above format.
Step 5
Step 6
Division :
1S Listing Format
Area / Location :
SN
Item
Description /
List
Quantity
Usage
Frequency
1 S Category
(5 Types
A,B,C, D,E)
Identificati
on Date
Disposal
Plan
1
2
3
4
5
6
7
8
9
10
Target
Date
Resp
Imple
mentat
ion
Status
SN
1S Activity
1S Listing Format (1/9/12 to
Identificati Disposal
Target
Resp
130/3/13)
S
Daily
1/9/12
N/A
N/A
Daily
1/9/12
N/A
N/A
Accretion
measuring
scale
Water hose
Daily
4/9/12
N/A
N/A
Air hose
Daily
4/9/12
N/A
N/A
QRT wire
Daily
6/9/12
N/A
N/A
Tool box
Daily
12/9/12
N/A
N/A
Plan
Date
1/9/12
N/A
N/A
Trilochan
Gorai
Done
1/9/12
N/A
N/A
Trilochan
Gorai
Indrajit
singh
Trilochan
Gorai
Done
Indrajit
singh
Indrajit
singh
Indrajit
singh
Trilochan
Gorai
Trilochan
Gorai
Dilip
Kumar
Trilochan
Gorai
Trilochan
Gorai
Indrajit
singh
Indrajit
singh
Trilocha
Trilochan
n Gor
Done
Daily
20/9/12
N/A
N/A
10
Cooling fan
Daily
20/9/12
N/A
N/A
Light up
19/9/12
N/A
N/A
Shut down
20/9/12
N/A
N/A
Light up
19/9/12
N/A
N/A
14
Light up
19/9/12
N/A
N/A
8
1
Shut down
B16
20/9/12
N/
N/A
N/
N/A
11
1
15
Implemen
tation
Status
o n Date
BMMIL/HR/2015-
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Don
Done
Item Description /
List
Quantity
1
2
3
4
5
6
7
8
Hammer 5 kg
Hexagonal bar
Round bar long
Round bar small
Air hose
Tool Box
Scoop
Fire extinguisher
1
1
1
1
1
1
1
1
Hand lamp
Usage
Frequency
Identificatio
1S
n Date
Category
(5 Types
A,B,C, D,E)
Daily
A
1/11/12
Daily
A
1/11/12
Daily
A
1/11/12
Daily
A
1/11/12
Daily
A
3/11/12
Daily
A
16/11/12
Weekly
B
3/11/12
Emergency
B
17/12/12
requiremen
t
Daily
B
17/12/12
BMMIL/HR/201516
Resp
Makar tudu
Manohar
Manohar
Manohar
Makar tudu
Makar tudu
Manohar
Manohar
Makar tudu
CATERGORIZATION
After prepartion of list of all available items, a separate list to
be made for the items which are useful within the circle and
put them in catergory-1.
List of balance items to be circulated to the Leader/Dy.Leader
of other circles of the same plant by hard copy to notify and
seek a reply within a time period of 7 days for the usefulness
of the material in their circle. The responsibility is lying with
the TPM Coordinator
Enlist the items required in any other circle of the same plant
and put them in Category-2
If no replay is received from any circles or after selecting the
materials for Category- 2,rest items list to be circulated by email to TPM Coordinators & Plant Head of all plants to find out
whether the same materials are of useful in some other plant
in the organization & seek confirmation within 10 days. The
responsibility is lying with the TPM Coordinator.
If any communication is received, accordingly prepare the list
and group them in
Category-3
After preparation of item BMMIL/HR/2015list for Category-1, Category-2 and
16
SI. Item
NO Description
Circle Name:
Specificati
on
Area
Quantity
Category
SI.
NO
Item
Descripti
on
Specificati Quantit
on
y
Category
Responsibilit
y
SI.
NO
Item
Descripti
on
Specificati
on
Quantit
y
Category
Responsibility
for
counter
Item
Descripti
on
Specificati
on
Quantit
y
Category
Responsibility
for
counter
SI
Item
.
Descripti
N on
O
Responsibil
ity
Date of
deletion
PLANT:
TPM CIRCLE:
AREA:
DATE:
Item
Criteria
Levels
1
Categorization of items
available in the work place
Remarks
4
The Second S
Simplifying Set in
Order and everything
A place for everything
in its
place, clean and ready to use
Arrange workplace for safety and
efficiency
4
1
2S - Organizing
4
3
Check :
1.Are passages and storage places clearly
indicated.
2.Are commonly used tools separated from those
seldom used.
3.Are containers and boxes stacked up properly.
4.Are fire extinguishers and hydrants readily
accessible.
5.Are there grooves, cracks or bumps on the floor
which hinder
work or safety.
4
4
4
5
4
6
4
7
Step 1
Step 2
Step3
Step
Method of
Replenishment
Stock
Quantity
Subject to
Supplier
Item
Locat
ion
Pull
System
(User is
Drawin
g)
Push
System
(Suppli
er is
Sendin
g)
Uni
t
Qty
Spe Man
cific ufact
atio urer
n
Purc
hase
Sour
ce
Mode
of
Supp
ly
Lead Co
Time st
for
Proc
urem
ent
Ma
x
Mi
n
Step 5 Ordering
Type (Based
on Step 1 &
2)
Fix
ed
Per
iod
O
P
O
Q
Unfix
ed
(As
per
requi
reme
nt)
4
8
Step 6
Deciding
Ordering
Quantity
Max
Step 7
Include This Additional
Informations in
required Item list of 1S
(Step5)
Step 8
Remarks
Standardizatio
n for
Sustaining
Min
4
9
5S Steps
2S Simplifying
Level
5
0