You are on page 1of 17

Construction

The Niava River Bridge

Sika Romania

View
1

Construction

The Niava River Bridge


The Project
Bridge over Niava River, Ni Belgrade-NiSkopje Highway Yugoslavia
Reinforced concrete continuous three spans
bridge: built in 1959/1960
Sika Romania

Length of the bridge


L = 14,0 + 68,0 + 14,0 = 96,0 m
Width of the bridge:
B = 18,36 m
2

Construction

The Niava River Bridge

Sika Romania

Longitudinal section
3

The Niava River Bridge

Construction

Cross sections

Sika Romania

At mid-span

Over support
4

Construction

The Niava River Bridge

The Problem

Insufficient flexural strength due


to increased traffic load
Over supports in longitudinal direction
Large transversal cracks in the bridge deck
Sika Romania
Risque of corrosion
in reinforcement steel
In the bridge deck for local bending moments due to
concentrated load

Construction

The Niava River Bridge


The Solution
Prestressed CarboDur CFRP plate Typ
S914 over supports
Length of plates

max. 33,0 m

Number of plates
Sika Romania :

108

Total CarboDur

ca. 3200 m

Prestressing force

Vo = 135 KN

Construction Phase: 15th. July-30th. October 2001

Construction

The Niava River Bridge


Consultant & Contractor
MOSTOGRADNJA Ltd. Co.
Civil Engineering and Construction Company Belgrade,
Yugoslavia
Sika Romania

Prestressing of SikaCarboDur CFRP plate S914


with a System
Developed, Tested, Manufactured and Patented by
MOSTOGRADNJA

Construction

The Niava River Bridge


Longitudinal section

Sika Romania

Distribution of prestressed CarboDur CFRP plates


Length : max. 33 m
8

Construction

The Niava River Bridge


The Solution
Traditional-non prestressed CarboDur
CFRP plate Type S914 for the bridge deck
Length of plates:

4-5m

Sika Romania

Number of plates:

400

Total CarboDur:

ca. 1800 m

Construction

The Niava River Bridge

Sika Romania

Equipment for Application


of CarboDur plates
1

Construction

The Niava River Bridge

Sika Romania

Application of Sikadur-30 and of CarboDur


plate on the bridge deck
1

Construction

The Niava River Bridge

Sika Romania

Preparation of
anchorage plates

Construction

The Niava River Bridge

Sika Romania

Detail of anchorage system

Prestressing in progress
1

Construction

The Niava River Bridge

Sika Romania

Prestressing in progress
1

Construction

The Niava River Bridge

Sika Romania

Prestressing equipment
1

Construction

The Niava River Bridge

Sika Romania

Anchorage system during curing of


Sikadur-30 epoxy adhesive
1

Construction

The Niava River Bridge


Sika System Solution

Sika Romania

Temperature protection of Prestressed


CarboDur CFRP plate system
1

You might also like