PDCA CYCLE
PLAN
:-
DO
:-
CHECK :-
ACTION :-
Underground piping
Grade slab casting
Wall marking
Dike wall concreting
Block work with stiffener column and beam concreting
Tile marking on wall
Lining wall concreting
Waterproofing
Plastering
Tile laying on wall
Ceiling work
Flooring
Sanitary fixing
(Attribution Analysis of
Wet wall)
Environment
Slow Schedule.
Quality.
constructionTile groove not
Curing for
n aligned, Bent
block & plaster
tile, Floating on
work, Chipping
surface
Delay in
for MEP
Not proper Cohanding over
services
ordination with
in project
MEP cause
chipping and
repairing work.
Poor workman
Wastage of
ship for tiling
material.
work.
Manpower.
Dirty
Workplace
Material.
PLAN :-
No block work
No plaster work
(FOR TOILET)
Drawing
In total co-ordination with M&E including fixture details.
Underground piping work
To be done as per co-ordination drawing.
Grade slab work to be done with rebar anchorage for dike
wall.
Wall layout marking
Dike wall concreting
Aluminum/LGS partition work
Marking to be done on wall for pipe location.
Pipe arrangement
MS lining wall to be framed with piping to be properly
attached to MS lining wall.
Wainscot granite cladding.
Wall cladding to be done in cement board/PVC panels.
Ceiling work
Flooring work
M&E fixtures.
POINTS TO BE CONSIDERED:
Samples (including M&E) selection to be done before
drawings are prepared.
Pipes pressure check should be done before wall cladding.
Required anchors for sanitary ware to be fixed before wall
cladding.
DO :-
DO :-
DO :- CO-ORDINATION DRAWING
DO :- DETAILS
DO :- DETAILS
DO :- DETAILS
DO :-
DO :-
WALL ELEVATIONS
DO :-
WALL ELEVATION
CHECK :-
Consumption :- 0.155kg/Sq.mt.
Cost : - 20 Rs/Sq.mt.
Consumption :- 25ml/Sq.mt.
BOQ +
40%.
BOQ +
60%.
=BOQ
BOQ +
54%.
=BOQ
BOQ +
45%.
BOQ +
40%.
BOQ +
27%.
BOQ +
47%.
BOQ +
53%.
=BOQ
=BOQ
BOQ +
12%.
BOQ +5%.
BOQ 600%.
CHECK :- REQUIREMENTS
(FOR TOILET)
Requirement of..
1) Safety Gadgets,
2) Tools,
3) Components,
4) Material,
5) Consumable material,
6) Equipment,
7) Method statement,
8) Quality- Acceptable criteria.
ACTION :-
ACTION :-
ACTION :-
ACTION :-
ACTION :-
ACTION :-
ACTION :-
ACTION :-
Installed basin.
Problems with
Conventional method.
1.
Slow
construction
2. Dirty work
place
3. Co-ordination
with M&E
Overcomes by Dry
wall Method.
To be complete site
office toilet in 45
days with trial
and error.
Because of using
plywood and
cement board we
maintained clean
work place
35
Problems with
Conventional method.
4. Poor workmanship for tile laying
Overcomes by Dry
wall Method.
Accuracy level high because of
fixing by using of Araldite.
We are using
polycarbonate
sheet, PVC
board and
prefinished
Gypsum Board.
Toilet work
complete on
time
36
37
Solution.
1.Drilled & Weld threaded locking nut and bolt
at correct location. Need to take care
while welding cause damage of PVC pipe.
38
ACHIEVEMENT :-
After Execution.
After Execution.
After Execution.
After Execution.
After Execution.
After Execution.
k
c
i
th ds.
m ar
m
12 C Bo
PV
After Execution.
COMPARISION OF TECHNIQUES
SL.N
O.
PARTICULARS
WET WALL
DRY WALL
Consumption of water
High
Nominal
Recyclable Material
No
Almost
Construction period
Curing period
Long
Nominal
Repairing/dismantling
Difficult
Easy
Working environment
Initial Cost
Framing; 24%
Framing
External finishes
Internal finishes
Civil work
Civil work; 46%
External finishes
Internal finishes
COMPARISION OF COST
(Rate/Sq.mt)
COMPARISION OF COST
(Rate/Sq.mt)
COMPARISION OF COST
(Rate/Sq.mt)
COMPARISION OF COST
(Rate/Sq.mt)
8,673.00
BUT.
By Implementing Dry wall method, We
are able to finish 38 Sq.mt Toilet in 45
days with productivity of 8.79
sq.mt/MD with compare to Shimizu Indias
recent productivity i.e. 5.23 sq.mt/MD.
THANK YOU