To the presentation on
(6 week) industrial training
At BHABA Hydro power plant
PRESENTED BY:
DALIP KUMAR
B-TECH {EEE} 7TH SEM
ROLL No.-14293
Description
Weir site
TRASH RACKS
De-silting chamber
penstock
The penstock transports water under
pressure from the fore bay tank to the
turbine, where the potential energy of
water is converted into kinetic energy in
order to rotate the turbine
WATER TURBINE
Bypass MIV
AC Generator/Alternator
Control Panels
synchronizing panel
SWITCH YARD
Aswitchingsubstation, orswitchyard, is a
substation without transformers that operates
only at a single voltage level..
Transformers
Earthing Switch