Lean Six

Sigma
Improve
Phase
Tollgate
Review

Improve
Phase

Review

Project Charter
High-Level Value
Stream Map and Scope
Validate Voice of the
Customer
& Voice of the Business
Validate Problem Statement
and Goals
Validate Financial Benefits
Create Communication Plan
Select and Launch Team
Develop Project Schedule
Complete Define Tollgate
Validate

Define
Define
Project Charter
Voice of the Customer

Lean Six Sigma


DMAIC Tools and
Activities
Value

Identify

Identify

Stream Map Flow


Key Input, Process
and Output Metrics
Develop Operational
Definitions
Develop Data Collection Plan
Validate Measurement
System
Collect Baseline Data
Determine Process Capability
Complete Measure Tollgate

Reduce

Measur
Measur
e
e

and

Kano Analysis
SIPOC Map
Project Valuation/ROIC
Analysis Tools
RACI and Quad Charts
Stakeholder Analysis
Communication Plan
Effective Meeting Tools
Inquiry and Advocacy Skills
Time Lines, Milestones,
and Gantt Charting
Pareto Analysis

Value Stream Mapping


Process Cycle

Efficiency/Littles Law
Operational Definitions
Data Collection Plan
Statistical Sampling
Measurement System
Analysis (MSA)
Gage R&R
Kappa Studies
Control Charts
Spaghetti Diagrams
Histograms
Normality Test
Process Capability Analysis

Root Causes
List of Potential Root

Causes
Confirm

Root Cause to
Output Relationship
Estimate Impact of Root
Causes on Key Outputs
Prioritize Root Causes
Value-Add Analysis
Takt Rate Analysis
Quick Wins
Statistical Analysis
Complete Analyze Tollgate

Analyz
Analyz
e
e

Process

Constraint ID and
Takt Time Analysis
Cause & Effect Analysis
FMEA
Hypothesis Tests/Conf.
Intervals
Simple & Multiple Regression
ANOVA
Components of Variation
Conquering Product and
Process Complexity
Queuing Theory

Develop

Potential Solutions
Select, and
Optimize Best Solutions
Develop To-Be Value Stream
Map(s)
Develop and Implement Pilot
Solution
Implement 5s Program
Develop Full Scale
Implementation Plan
Cost/Benefit Analysis
Benchmarking
Complete Improve Tollgate
Evaluate,

Improv
Improv
e
e

Replenishment Pull/Kanban
Stocking Strategy
Process Flow Improvement
Process Balancing
Analytical Batch Sizing
Total Productive Maintenance
Design of Experiments (DOE)
Solution Selection Matrix
Piloting and Simulation
Work Control System
Setup reduction
Pugh Matrix
Pull System

Develop

SOPs, Training
Plan & Process Controls
Implement Solution and
Ongoing Process
Measurements
Confirm Attainment of Project
Goals
Identify Project Replication
Opportunities
Training
Complete Control Tollgate
Transition Project to Process
Owner

Contro
Contro
ll

Mistake-Proofing/

Zero Defects
Operating
Procedures (SOPs)
Process Control Plans
Visual Process Control Tools
MGPP
Statistical Process Controls
(SPC)
Solution Replication
Visual Workplace
Metrics
Project Transition Model
Team Feedback Session
Standard

Kaizen Events Targeted in Measure to Accelerate Results


International Standards for Lean Six

Analyze Overview
Hypothesis Tests

Value-Add Analysis

Tools Used

Root Cause / Effect

Root cause:

Effect

Root cause:

Effect

Root cause:

Effect

Value Add Analysis


One-Way ANOVA
Two-Way ANOVA
Pareto Plots
Simple Linear Regression
Multiple Regression
Test for Equal Variance
Scatter Plots

C&E Matrix
Complexity
Cause & Effect Diagram
Kaizen/Quick Wins
FMEA
Control/Impact Chart
T-Test
Other

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

To-Be Process Map


Client Mgr

Client HR

Notify HR of
employee exit date

Avg. Cycle
time = 0
days

Places information into HR


EXIT database

Utilize web tool to


submit a delete request
to vendor

Client
Contact

NT
Admin

Access database
daily

Avg. Cycle
time = 1
day

Create Work
Request

Email
Vendor

Avg. Cycle
time = 1
day

Delete account

Admin closes work request and


manager notified

Avg. Cycle
time = 1
day

Avg. Cycle
time = 1
day

Admin

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

Quick Win Documentation


Template
Process Name: __________________

Process Lead: ___________________

Process Owner: ______________________ Start Date: ______________


Process Area: ________________________ Stop Date: ______________
1.
2.
3.
4.
5.
6.

Root Cause: _________________________________________________


Obvious Solution: __________________________________________
5s
Low or No Cost: __________________________________________
4-Step Setup Reduction
Low Risk:
________________________________________________
Inventory Reduction
Implementation Plan: ______________________________________________
MSA Improvements
Stakeholder (s) Approval: ___________________________________________
Price reductions

Reduced DOWNTIME
Benefits:
(NVA steps or work)
__________________________________________________________
Pull System
__________________________________________________________
Kaizen events
Other
__________________________________________________________

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

FMEA

Risk Analysis recommended actions (Key Speaking Points)


Rating Index
Total Current RPN Risk

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

Value Stream Map (VSM)


Future State
Information
Flow

Sources of Value

Supplier

Customer

<Step1>

<Step3>

<Step3>

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

Business Impact

State financial impact of future project leverage opportunities


Separate hard or Type 1 from soft Type 2 or 3 dollars
AnnualEstimate

ReplicatedEstimate

Revenue
Enhancement

Type1:?

Type1:?

Type2:?

Type2:?

Type3:?

Type3:?

Expenses
Reduction

Type1:?

Type1:?

Type2:?

Type2:?

Type3:?

Type3:?

LossReduction

Type1:?

Type1:?

Type2:?

Type2:?

Type3:?

Type3:?

Type1:?

Type1:?

Type2:?

Type2:?

Type3:?

Type3:?

Type1:?

Type1:?

Type2:?

Type2:?

Type3:?

Type3:?

CostAvoidance
TotalSavings

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

Business Impact Details

Type 1: Describe the chain of causality that shows how you determined the Type 1 savings. (tell the story with
causeeffect relationships, on how the proposed change should create the desired financial result (savings) in
your project )
Show the financial calculation savings and assumptions used.

Type 2: Describe the chain of causality that shows how you determined the Type 2 savings. (tell the story with
causeeffect relationships, on how the proposed change should create the desired financial result (savings) in
your project )
Show the financial calculation savings and assumptions used.

Assumption #1 (i.e. Labor rate used, period of time, etc)


Assumption #2 (i.e. contractor hrs or FTE, source of data, etc)

Describe the Type 3 Business Impact(s) areas and how these were measured

Assumption #1 (i.e. source of data, clear Operational Definitions?)


Assumption #2 (i.e. hourly rate + incremental benefit cost + travel)

Assumption #1 (i.e. project is driven by the Business strategy?)


Assumption #2 (i.e. Customer service rating, employee moral, etc)

Other Questions

Stakeholders agree on the projects impact and how it will be measured in financial terms?
What steps were taken to ensure the integrity & accuracy of the data?
Has the project tracking worksheet been updated?

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

Current Status
Key actions
completed
Issues
Lessons learned
Communication,
team building,
organizational
activities

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

10

Next Steps

Key actions
Planned Lean Six Sigma Tool use

Questions to answer
Barrier/risk mitigation activities

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

11

Improve Summary

Solution Selection Criteria


How the solution was determined:
What was the solution selection tool used?
What project management tools were used?
Cost/benefit analysis?
Include any other tools or methods used

Pilot and Implementation Plan


1.
2.
3.
4.
5.

?
?
?
?
?

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

12

Sign Off
I concur that the Improve phase was successfully completed on
MM/DD/YYYY
I concur the project is ready to proceed to next phase: Analyze

Enter Name Here

Green Belt/Black Belt

Enter Name Here

Enter Name Here


Sponsor / Process Owner

Financial Representative

Enter Name Here


Deployment Champion

Enter Name
Here
Master Black Belt

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

13

Tollgate Reviews
Backup Slides
Go Forward

ld
o
H
t
l
Ha

M Wait - Go Back
A
I
C

Project Charter
Financial Impact

Problem/Goal Statement
Problem: Describe problem in non-technical terms
Statement should explain why project is important; why
working on it is a priority
Goal: Goals communicate before and after conditions

Shift mean, variance, or both?

Should impact cost, time, quality dimensions


Express goals using SMART criteria

Specific, Measurable, Attainable, Resource


Requirements, Time Boundaries
Explain leverage and strategic implications (if any)

State financial impact of project


Expenses
Investments (inventory, capital, A/R)
Revenues
Separate hard from soft dollars
State financial impact of leverage opportunities (future
projects)

Team

Tollgate Review Schedule

PES Name
Project Executive Sponsor (if different from PS)
PS Name
Project Sponsor/Process Owner
DC Name
Deployment Champion
GB/BB Name
Green Belt/Black Belt
MBB Name
Master Black Belt
Core Team
Role
% Contrib.
LSS Training
Team Member 1
SME
XX
YB
Team Member 2 TM XX
GB
Team Member 3 SME XX
PS
Extended Team
Team Member 1 BFM XX
Not Trained
Team Member 2 IT XX
Not Trained

Tollgate
Define:
Measure:
Analyze:
Improve:
Control:

Scheduled
XX/XX/XX
XX/XX/XX
XX/XX/XX
XX/XX/XX
XX/XX/XX

Revised
XX/XX/XX
XX/XX/XX
XX/XX/XX
XX/XX/XX

Complete
XX/XX/XX
XX/XX/XX
XX/XX/XX
XX/XX/XX
XX/XX/XX

Review high-level schedule milestones here:


Phase Completions
Tollgate Reviews

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

15

Measure Overview
Process Capability

Graphical Analysis

CTQ: ?
Unit (d) or Mean (c): ?
Defect (d) or St. Dev. (c): ?
PCE%: ?
DPMO (d): ?
Sigma (Short Term): ?
Sigma (Long Term):?
MSA Results: show the percentage result of the GR&R,
AR&R or other MSA carried out in the project

Root Cause / Quick Win

Root cause:
Quick Win #1

Root cause:
Quick Win #2

Root cause:
Quick Win #3

Tools Used

Detailed process mapping


MSA
Value Stream Mapping
Data Collection Planning
Basic Statistics
Process Capability
Histograms

Time Series Plot


Probability Plot
Pareto Analysis
Operational Def.
5s
Pull
Control Charts

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

16

Analyze
Tollgate Checklist

Has the team examined the process and identified potential bottlenecks,
disconnects and redundancies that could contribute to the problem statement?

Deliverables:

Has the team analyzed data about the process and its performance to help stratify
the problem, understand reasons for variation in the process, and generate
hypothesis as to the root causes of the current process performance?

Prioritized List of Validated


Root Causes

Has an evaluation been done to determine whether the problem can be solved
without a fundamental recreation of the process? Has the decision been
confirmed with the Project Sponsor?

Has the team investigated and validated (or devalidated) the root cause
hypotheses generated earlier, to gain confidence that the vital few root causes
have been uncovered?

Does the team understand why the problem (the Quality, Cycle Time or Cost
Efficiency issue identified in the Problem Statement) is being seen?

Has the team been able to identify any additional Quick Wins?

Have learnings to-date required modification of the Project Charter? If so, have
these changes been approved by the Project Sponsor and the Key Stakeholders?

Have any new risks to project success been identified, added to the Risk
Mitigation Plan, and a mitigation strategy put in place?

List of Potential Root causes

Additional Quick Wins, if


applicable
Refined Charter, as necessary
Updated Risk Mitigation Plan
Deliverables Uploaded to Central
Storage Location or Deployment
Management System
Stop

Tollgate
Review

Has the team identified the key factors (critical Xs) that have the biggest impact on
process performance? Have they validated the root causes?
International Standards for Lean Six

17
17

Improve
Tollgate Checklist

What techniques were used to generate ideas for potential solutions?


What narrowing and screening techniques were used to further develop and qualify
potential solutions?
What evaluation criteria were used to select a recommended solution?
Do proposed solutions address all the identified root causes, at least the most critical?
Were the solutions verified with the Project Sponsor and Stakeholders? Has an
approval been received to implement?
Was a pilot run to test the solution? What was learned? What modifications made?
Has the team seen evidence that the root causes of the initial problems have been
addressed during the pilot? What are the expected benefits?
Has the team considered potential problems and unintended consequences (FMEA) of
the solution and developed preventive and contingency actions to address them?
Has the proposed solution been documented, including process participants, job
descriptions and if applicable, their estimated time commitment to support the process?
Has the team developed an implementation plan? What is the status?
Have changes been communicated to all the appropriate people?
Has the team been able to identify any additional Quick Wins?
Have learning's to-date required modification of the Project Charter? If so, have
these changes been approved by the Project Sponsor and the Key Stakeholders?
Have any new risks to project success been identified and added to the Risk Mitigation
Plan?

Deliverables:
Prioritized List of Solutions
To-Be Value Stream
Map(s)
Pilot Plan & Results
Approved Solution and
Detailed Implementation
Plan
Additional Quick Wins, if
applicable
Refined Charter, as
necessary
Updated Risk Mitigation
Plan
Deliverables Uploaded to
Central Storage Location or
Stop
Deployment
Management
System

Tollgate
Review

Has the team developed improvement solutions for the critical Xs, piloted the solution
and verified that the solution will solve the problem?
International Standards for Lean Six

18

Control
Tollgate Checklist

Has the team prepared all the essential documentation for the improved process,
including revised/new Standard Operating Procedures (SOPs), a training plan and a
process control system?
Has the necessary training for process owners/operators been performed?
Have the right measures been selected, and documented as part of the Process
Control System, to monitor performance of the process and the continued
effectiveness of the solution? Has the metrics briefing plan/schedule been
documented? Who owns the measures? Has the Process Owners job description
been updated to reflect the new responsibilities? What happens if minimum
performance is not achieved?
Has the solution been effectively implemented? Has the team compiled results data
confirming that the solution has achieved the goals defined in the Project Charter?
Has the Benefits Realization Schedule been verified by the Financial
Representative?
Has the process been transitioned to the Process Owner, to take over responsibility
for managing continuing operations? Do they concur with the control plan?
Has a final Storyboard documenting the project work been developed?
Has the team forwarded other issues/opportunities, which were not able to be
addressed, to senior management?
Have lessons learned been captured?
Have replication opportunities been identified and communicated?
Has the hard work and successful efforts of our team been celebrated?

Deliverables:
SOPs
Training Plan
Process Control System
Benefits Realization
Schedule, validated by
Financial Representative
Validated Solution
Replication/ Standardization
Plan
Lessons Learned
Transitioned Project
Project Risk Performance
Deliverables Uploaded to
Central Storage Location or
Deployment Management
Stop
System

Tollgate
Review

Has the team implemented the solution, and a control plan to insure the process is
robust to change?
International Standards for Lean Six

19

Lean Six Sigma


DMAIC Improvement Process
Define
Tollgat
e
Stop
Review
Tollgat
e
Stop
Review
Stop

Define the opportunity from both the customer


and business perspective

Measur
e

Understand the baseline process


performance

Analyze
Tollgat
e
Review
Tollgat
e
Stop
Review

Identify the critical X factors


and root causes impacting
process performance

Improv
e

Develop solutions
linked to critical xs

Control

Implement
solutions &
control plan

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six Sigma

20

Evaluating Solutions
Against Criteria (Optional)
Example: Independent Solutions
Solutions
Solution A
Solution B
Solution C

% Contribution of Root Cause to Process Deficiency


Root Cause #1
40%

Root Cause #2
25%

Root Cause #3
20%

Root Cause #4
10%

80%
20%

80%

30%

250

100%

200

80%

150

60%

100

40%

50

20%

0%

100%

Solution D
Solution E

20%

5%

#1

#2

#3

#4

Root Causes

Solution A = a 32% reduction in defects (80% of 40%)


Solution B = a 21% reduction in defects (20% of 25% + 80% of 20%)=(5%+16%)
Solution C = a 17.5% reduction in defects (30% of 25% + 100% of 10%)=(7.5%+10%)
Implementing Solutions A & B achieve a 53% reduction in defects.
(Assumes no interaction effects of the solutions)
Original goal is a 50% reduction.

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

21

Design of Experiments
(DOE) Results (Optional)
Main Effects Plot (data means) for Mean
Training Dollars

60

J ets

45

Mean of Mean

30
15
0
-1

-1

Employees

60

1
%Overbooked

45
30
15
0
-1

-1

The number of Employees is the biggest


driver for Mean Time Late

Employee is the only statistically significant factor for


Mean besides the constant term. All other main effects
& 2-way interactions have a p-value > 0.05.

Ymean=f(x) equation is:


Pareto Chart for
Mean Time Late

Ymean = -27.97(Employee) + 29.64


Number of Employees is the only significant
factor for Mean - Time Late

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

22

Pugh (Selection) Matrix


(Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

23

Benefit-Effort Matrix
(Optional)
Benefit

Highly Desirable Opportunities


Projects in upper left are the most
desirable projects.

High

16
7

12

Med

4
17

13

10

Potential Quick Hits


Possibility for Kaizen event or small GB
project

Low

11

14
5

Low

Potentially Desirable Opportunities


Projects in the upper right are potentially
desirable, but usually require more
analysis to ensure good decision making.

15
Med

High

Least Desirable Opportunities


Projects in the lower right are the least
desirable.
Effort

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

24

Stakeholder Analysis
(Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

25

Influence Strategy
(Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

26

Measurement Systems
Analysis (MSA) (Optional)
Reported by:
Gage
Tolerance:
name:
Date
Misc:
of study:

Gage R&R

Study Var %Study Var


Source
StdDev (SD) (6 * SD)
(%SV)
Total Gage R&R .039870 0.23922
19.22
Repeatability
0.023594 0.14156
11.38
Reproducibility 0.032140 0.19284
15.50
Operator
0.018488 0.11093
8.91
Operator*Part 0.026290 0.15774
12.68
Part-To-Part
0.203531 1.22118
98.13
Total Variation
0.207399 1.24439 100.00

Components of Variation

Response by Part

100
Percent

VarComp
0.0015896
0.0005567
0.0010330
0.0003418
0.0006912
0.0414247
0.0430143

Gage R&R (ANOVA) for Response


% Contribution
%StudyVar

10.00
9.75

50

9.50
0

Gage R&R

Repeat

Reprod

Part-to-Part

0.10

10

Part

R Chart by Operator
1
Sample Range

Source
Total Gage R&R
Repeatability
Reproducibility
Operator
Operator*Part
Part-To-Part
Total Variation

%Contribution
(of VarComp)
3.70
1.29
2.40
0.79
1.61
96.30
100.00

Response by Operator
UCL=0.1073

0.05

_
R=0.0417

0.00

LCL=0

10.00
9.75
9.50

Xbar Chart by Operator

2
Operator

Operator * Part Interaction

Number of Distinct Categories = 7

Measurement system is
acceptable with the Total
% Contribution <10%
Enter Key Slide Take Away (Key Point) Here
International Standards for Lean Six

27

Pull System
(Optional)
1. Always pull stock from bin with GREEN card if it
is there.
2. Store/supply room replaces stocked items and
switches RED card to items just replaced.
3. The cards are attached to magnetic strip labels
(for ease of movement for resizing).

Bin 1
Order Cards
Bin1Bin
1 2 Bin 1 Bin 2 Bin 1 Bin 2
Bin

2-Bin
Mailbox

Bin
Bin 1
1 Bin
Bin 2
2
Bin
1
Bin
2
Bin
1
Bin
2
Bin
1
Bin
2
Bin 1Bin 2
Bin 1

Bin 1 Bin 2 Bin 1

Bin 1Bin 2 Bin 1 Bin 2 Bin 1 Bin 2


Enter Key Slide Take Away (Key Point) Here
International Standards for Lean Six

28

Setup Reduction
(Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

29

PDCA
(Optional)
Plan:
?
?
Do:
?
?
Check:
?
?
Act:
?
?

Plan

Do

Check

Act

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

30

5s
(Optional)
Sort
?
?
Set Order
?
?
Shine
?
?
Standardize
?
?
Sustain
?
?
Enter Key Slide Take Away (Key Point) Here
International Standards for Lean Six

31

Kaizen
(Optional)

Typical Kaizen Weekly Schedule

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

32

Benchmark Analysis
(Optional)

Based on the information above, what is the performance objective*?


Reduce defects by
%
Reduce long-term DPMO from
to
.
Improve short-term Z from
to
.
*If you do not benchmark, performance standards are based on:
For a process with 3 sigma level, decrease % defects by 10x.
For a process with > 3 sigma level, decrease % defects by 2x.
Other.please explain (corporate mandate, compliance/legal, VOC data, etc)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

33

Key Buying Factor Analysis


(Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

34

Pilot Plan
(Optional)
Pilot Test
Hand-Chek/
Hot-Chek
Interface
Test

Check-in
Verification
Test

Description

Test Team

Schedule

Sample Check-in Data entered in Hand-Chek


device
Sample Data Sets Transmitted to Hot-Chek
System All Hotel Floors, All Hotel Rooms
Confirmation Data Received from Hot-Chek to
Hand-Chek Device All Hotel Floors &Rooms

Data Set Entry Accuracy


< 3.4 DPMO
Data Time < 6 Sec
Data Transmission/
Accuracy < 3.4 DPMO

SB, plus
Hot-Chek
tech rep

Start 3/1
Complete
3/3

Sample Guest Data Entered in Hot-Chek System


(variety of room requirements)
Guests (Hotel Employees) Walked Through
Check-in Process (90% Pre-Registered, 10%
Non-Pre-Registered)
Volume Stress Test Simulated Arrival 20
Guests in a Tour Bus
Process Measurements recorded via Observer
(see Design Scorecard); Guest Observations
Recorded.

Data Set Entry Accuracy


< 3.4 DPMO
Data Set Entry Time < 6
Seconds
Data Set Transmission/
Reception Accuracy <
3.4 DPMO
Design Scorecard CCRs

SB, + 6
Check-in
Staf

Start 3/6
Complete
3/7

25 Guests invited to experience hotel check-in


Guests pre-registered with their room
requirements in Hot-Chek system.
Guests Walked Through Check-in Process (90%
Pre-Registered, 10% Non-Pre-Registered)
Process Measurements recorded via Observer
(see Design Scorecard)
Guests Debriefed Following Experience.

Data Set Entry Accuracy


< 3.4 DPMO
Data Set Entry Time < 6
Seconds
Data Set Transmission/
Reception Accuracy <
3.4 DPMO
Design Scorecard CCRs

SB, + 6
Check-in
Staf

Start 3/10
Complete
3/10

Check-in
Validation
Test

Success Criteria

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

35

Verify Pilot Results


(Optional)
Measurement Plan:
Plan
Target

Measure

Pilot

CTQs
Process time

1 minute

0.5 min.

CTQs
Data Transmission
Accuracy

< 3.4 DPMO

100 DPMO

Pilot Observations:

Comments

0.05 min.

1) Data Reception Weak 12th Floor, SW Rooms

2) Data Entry Sequence Confusing


GAP Analysis/Root Causes:

1) Insufficient radio transceivers, 12th Floor

2) Order of questions confusing staff


Follow-up Actions:

1) Add four more radio transceivers

2) Resequence guest questions

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

36

Summarizing Pilot
Conclusions (Optional)

Once all the pilot data has been collected and the results verified, the team can
determine the next steps toward solution implementation. Only after an objective and
comprehensive assessment of the pilot can responsible next step decisions be
made.

Some questions a team should ask upon the completion of a pilot to help guide them
toward identification of the proper next steps are:

Did pilot have anticipated results?

Was the plan for conducting the pilot effective?

What improvements can we make to the solution?

Can the solution be implemented as-is? Should it be?

Can the solution remain in place at the pilot location?

What lessons learned and best practices can we apply during solution implementation?

Did the solution achieve the required design goals?

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

37

Kaizen
Action Workout (Optional)
Planning

Execution

Before

GraphicalAnalysis

RootCauses/QuickWins

Root cause:
Quick

Root cause:
Quick

Win #1
Win #2

Root cause:
Quick

After

Win #3

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

38

Technical-Political-Cultural
TPC Analysis (Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

39

Multi-Generational Project
Plan (Optional)

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

40

Cost/Benefit Analysis
(Optional)

Identify the various solution options


Describe the Type 1 solution $ gained from the expected process
improvement
Calculate the total cost of ownership to fully implement the solution

Enter Key Slide Take Away (Key Point) Here


International Standards for Lean Six

41

You might also like