Professional Documents
Culture Documents
PLANNING AND
CONTROL
(MEFB 433)
Dr. Weria Khaksar
Email: weria@uniten.edu.my
Room No. BN-03-08
and
building
Waste
represents
Disruptions
have
blocks
of
lean
unproductive
a negative
A
flexibleand
resources
influenceison
the
system
one
eliminating waste
system by
thatfree
is robust
can
up
upsetting
the
resources
and
enough
to of
smooth
flow
enhance
handle
athrough
mix of
products
production.
products,
often
the system,
and
There
are seven
on
a should
daily
they
be
wastes
in thebasis,
lean
and
to handle
philosophy:
eliminated.
1.
Inventory
Disruptions
changes
in are
the
2.
Overproduction
caused
poor
level
ofby
output
3.
Waiting time
quality,
while
still
4. Unnecessary
equipment
maintain
transporting
breakdowns,
balance
and
5.
Processing
changes
to
the
waste
speed.
schedule, and
schedule,
and
6.
Inefficient
work
mixes require
frequent
Quality Improvement:
Production Flexibility:
Workers as assets:
Cross-trained workers:
Manufacturing
Planning
and
Manufacturing
Manufacturing