AIM

BUILDING CONSTRUCTION
ACTIVITY AND STAGES OF
BUILDING CONSTRUCTION

BUILDING CONTRUCTION
ACTIVITY

After
principally
agreed
by
Admin
authority the work is included in CWP with
guess estimated cost.
After approval of CWP for the FY (Current) the
SBP is prepared and got approved with
indication of cost.
Project estimate is prepared after approval of
SBP.

BUILDING CONTRUCTION
ACTIVITY

Contract is concluded on approval/issued


of Admin approval.

Work order is issued on


acceptance letter issued by
engineer authority.

receipt of
competent

Work is started by the contractor at site as


per contract agreement BQ, Drawings and
specifications etc.

STAGES BUILDING
CONTRUCTION

Layout

Termite proofing

PCC (1:4:8) lean

RCC (1:2:4) Raft

Brick work upto ground level

Brick work upto FFL

DPC

STAGES BUILDING
CONTRUCTION

Brick work upto lintal level

Provision of Door/Window chowkat

RCC lintal

Brick work upto roof level

Shuttering of roof RCC

Steel reinforcement
6

STAGES BUILDING
CONTRUCTION

RCC (1:2:4) roof

Provision of elect conduit and fan


boxes
and switch /socket and power
plug boxes

Plastering work (Internal)

Earth fill for floor

Earth back filling (external)

Flooring

STAGES BUILDING
CONTRUCTION
Bath tiling work

Plastering work (external)

Provision of door/windows and


vents

Electricity work

Water supply work

GAS work

STAGES BUILDING
CONTRUCTION

Distempering and painting

Provision of glasses

Provision of sanitary items

Provisioning of switches, sockets,


power plug and fan

Water Supply valves etc

Gas valves etc

Plinth Protection

STAGES BUILDING
CONTRUCTION
Weather shield (External)

Provision of out gates

Provision of Ext Elect

Provision of Ext water supply

Provision of Ext Gas

Provision of Sewerage

Site clearance
10

Q&A