AND
PRACTICE
PREPARED BY: -GABZ-
ISOLATED SURVEYS
OF LAND ADJOINING
ANY ACTUAL OR
PROPOSED NATIONAL
ROAD NOTIFICATION
LETTER SHALL BE
SENT
TO
DISTRICT ENGINEER OF DPWH
BEFORE PROVINCIAL
ROADS ARE
MONUMENTED A
NOTICE SHALL BE
SENT TO THE
DISTRICT ENGINEER OF DPWH
IN THE HEARING OF
THE CADASTRAL
CASE, THE COURT
SHALL BE ASSISTED
BY.
GEODETIC ENGINEER DENR
ISOLATED SURVEYS
OF LAND ADJOINING
ANY ACTUAL OR
PROPOSED CITY OR
MUNICIPAL STREETS,
NOTIFICATION
LETTER SHALL BE
CITY/MUNICIPAL
ENGINEER
SENT TO
AS THE CADASTRAL
SKETCHING
PROGRESSES THE
CENTER LINES AND
WIDTH OF ALL ROADS
OTHER THAN
PROVINCIAL ROAD
SHALL BE REQUESTED
MUNICIPAL
ENGINEERBY
TO BE
INDICATED
ISOLATED SURVEYS
OF LANDS ADJOINING
ANY ACTUAL OR
PROPOSED
PROVINCIAL ROAD
NOTIFICATION
LETTER SHALL BE
PROVINCIAL
SENTENGINEER
TO
ISOLATED SURVEYS OF
LANDS ADJOINING
PROPERTIES CLAIMED
OR OWNED BY
PROVINCIAL
GOVERNMENT,
NOTIFICATION SHALL
BE
SENT
TO
THE
PROVINCIAL TREASURER
ISOLATED SURVEYS OF
LANDS ADJOINING
PROPERTIES OWNED OR
CLAIMED BY THE CITY
OR MUNICIPALITY,
NOTIFICATION LETTER
SHALL BE SENT TO THE
CITY OR MUNICIPAL
CITY/MUNICIPAL
MAYORTREASURER
OR
IN DELIMITATION SURVEY
OF FOREST RESERVES
USING GPS RECEIVER TO
ESTABLISH POSITIONS OF
THE CORNERS,
DELIMITATION OF THE
SURVEYS DESIGN AND
EXECUTING OF GPS
SURVEY BE UNDERTAKEN
NAMRIA
BY
IN DELIMITATION OF
RESERVATIONS, PARKS AND
OTHER PROTECTED AREAS
DONE BY AUTHORIZED
PRIVATE GEODETIC
ENGINEERS, THE OBSERVED
GPS DATA FOR PROCESSING
AND ADJUSTMENT TO PPCSTM/PRS92 SHALL BE
SUBMITTED
TO
NAMRIA
REPOSITORY OF LAND
CLASSIFICATION
RECORDS WHICH
INCLUDED FIELD
NOTES, COMPUTATION
AND LAND
CLASSIFICATION MAPS
AND OTHER
RELATED
NAMRIA
IN DELIMITATION SURVEY
OF FOREST RESERVE AND
DONE BY AUTHORIZED
PRIVATE GEODETIC
ENGINEERS, THE GPS DATA
FOR PROCESSING AND
ADJUSTMENT TO PPCSTM/PRS92 SHALL BE
SUBMITTED
NAMRIA
ESTABLISHMENT OF
FIRST AND SECOND
ORDER PRS92 IS
ONE OF THE
FUNCTION OF THE
NAMRIA
IN CASE OF OWNER OR
CLAIMANT OF A PROPERTY
COVERED BY A
PREVIOUSLY APPROVED
SURVEY WITHIN A
CADASTRAL PROJECT
DESIRE CHANGES OR
SUBDIVISION, HE SHALL
SECURE
AUTHORITY FROM THE RTD FOR
MINERAL LAND
SURVEY RETURNS
SHALL BE VERIFIED
AND APPROVED BY
RTD
UPON COMPLETION OF
CADASTRAL SURVEY A
COPY OF THE PUBLIC
NOTICE
COMPLIANCE BEFORE
THE FINAL LOT SURVEY
SHALL BE FORWARDED
TO
THE
LAND MANAGEMENT SECTOR
IN MINERAL LAND
SURVEY, ASIDE
ORIGINAL PLAN
APPROVED, THE
SURVEY RETURNS
SHALL BE RETAINED
AND CUSTODY OF
LAND MANAGEMENT
THE SECTOR
SURVEY AUTHORITY OR
ORDER IN SUBDIVISION
OF PUBLIC LAND
SURVEY COVERED BY
PUBLIC LAND
APPLICATION SHALL BE
ISSUED BY
CENRO
A TRACT APPLIED
FOR SALE BY AN
APPLICANT, SURVEY
SHALL BE MADE
PRIOR TO FILING OF
SALE APPLICATION IN
THE
CENRO
A TRACT APPLIED
FOR LEASE BY AN
APPLICANT, SURVEY
SHALL BE MADE
PRIOR TO FILING OF
SALE APPLICATION IN
THE
CENRO
ISOLATED SURVEYS OF
LANDS ADJOINING
PROPERTIES OWNED OR
CLAIMED BY THE
NATIONAL
GOVERNMENT,
NOTIFICATION LETTER
SHALL BE
SENT
TO
PENRO
MINERAL LAND
SURVEY RETURNS
SHALL BE
SUBMITTED TO THE
RD OF MINES AND GEO-SCIENCES
IN MINERAL SURVEY,
TOPOGRAPHY OF THE
PREVIOUSLY APPROVED AND
THE NEW SURVEY, SHOULD
CONFORM AT COMMON
BOUNDARY, IN CASE THEY
DIFFER AND ERROR IS IN THE
FORMER, THE SURVEY PLAN,
A SURVEY CORRECTION
ORDER
BE
ISSUED
BY THE
DIRECTOR OF
MINES
AND GEO-SCIENCES
SURVEY RETURNS OF
COMPLEX SUBDIVISION
PROJECT FOR HOUSING
SHALL BE ACCOMPANIED
BY SCHEME OF
SUBDIVISION OR SITE
DEVELOPMENT PLAN WITH
THE RESOLUTION
APPROVE
BY
THE
SANGUNIAN BAYAN/PANGLUNGSOD
LAND SURVEYS
AFFECTING BARANGAY
ROAD IN A CERTAIN
MUNICIPALITY, A
NOTICE AND
CONSULTATION BE
MADE ON THE WIDTHS
AND CENTER LINE OF
SANGUNIAN
BARANGAY
THE OFFICE
OF
DURING CADASTRAL
SURVEY, ADVERSE
CLAIM ON TITLED
PROPERTIES SHALL BE
DISREGARDED UNLESS
SUPPORTED BY AN
ORDER FROM THE
RTC
DURING CADASTRAL
SURVEY, CLAIMS INSIDE
TITLE OR DECREED
PROPERTIES SHALL BE
DISREGARDED EXCEPT
BY AN ORDER FROM
THE
RTC
NO CADASTRAL LOT
PENDING
REGISTRATION SHALL
BE AMENDED OR
SUBDIVIDED BY
GEODETIC ENGINEER
WITHOUT ORDER FROM
THE
COURT
PROVINCIAL
BOUNDARIES
DISPUTES SHALL BE
SETTLED IN
ACCORDANCE WITH
PROCEDURES IN
LOCAL R.A.
GOVT
CODE
7160
SPACING OF STATIONS IN
PRIMARY CONTROL
TRAVERSE
100m-1,000m
SPACING OF STATIONS IN
SECONDARY CONTROL
TRAVERSE
100m-500m
SPACING OF
STATIONS IN
TERTIARY CONTROL
TRAVERSE
AS REQUIRED
MAXIMUM ANGULAR
ERROR OF CLOSURE
IN PRIMARY
TRAVERSE
2.5P
MAXIMUM ANGULAR
ERROR OF CLOSURE
IN SECONDARY
TRAVERSE
10S
MAXIMUM ANGULAR
ERROR OF CLOSURE
IN TERTIARY
TRAVERSE
30T
NUMBER OF
OBSERVATIONS:
POSITIONS WITH 1
SECOND
THEODOLITE IN
PRIMARY TRAVERSE
2
NUMBER OF
OBSERVATIONS:
POSITIONS WITH 1
SECOND
THEODOLITE IN
SECONDARY
TRAVERSE
1
NUMBER OF
OBSERVATIONS:
POSITIONS WITH 1
SECOND
THEODOLITE IN
TERTIARY TRAVERSE
AS REQUIRED
SETS WITH 20 OR 30
SECOND TRANSIT IN
PRIMARY TRAVERSE
6 D/R FOR INTERIOR & EXTERIOR ANGLES
SETS WITH 20 OR 30
SECOND TRANSIT IN
SECONDARY
TRAVERSE
4 D/R FOR INTERIOR ANGLE FOR CIRCUIT AND
LOOP TRAVERSE CLAMPED
SETS WITH 20 OR 30
SECOND TRANSIT IN
TERTIARY TRAVERSE
CLAMPED PLATE
MAXIMUM LINEAR
ERROR OF CLOSURE
IN PRIMARY
TRAVERSE
0.0001P
MAXIMUM LINEAR
ERROR OF CLOSURE
IN SECONDARY
TRAVERSE
0.0002P
MAXIMUM LINEAR
ERROR OF CLOSURE
IN TERTIARY
TRAVERSE
0.0005P
AZIMUTH SHALL E
DETERMINED TO THE
NEAREST ___ OF ARC AND
DISTANCES SHALL BE
MEASURED ___ TO THE
NEAREST ___ TAKING INTO
ACCOUNT THE
TEMPERATURE, SAG, PULL,
GRADE AND SEA LEVEL
1,CORRECTIONS.
TWICE, MILLIMETER
THE PRIMARY
CONTROL RELATIVE
ERROR SHALL NOT
BE GREATER
1/20,000
THE SECONDARY
CONTROL RELATIVE
ERROR SHALL NOT
BE GREATER
1/10,000
THE TERTIARY
CONTROL RELATIVE
ERROR SHALL NOT
BE GREATER
1/5,000
MAXIMUM PROBABLE
ERROR OF
ASTRONOMICAL
OBSERVATIONS IN
PRIMARY TRAVERSE
5
MAXIMUM PROBABLE
ERROR OF
ASTRONOMICAL
OBSERVATIONS IN
SECONDARY
TRAVERSE
10
MAXIMUM PROBABLE
ERROR OF
ASTRONOMICAL
OBSERVATIONS IN
TERTIARY TRAVERSE
15
IN PRIMARY
TRAVERSE, THE
NUMBER OF
STATIONS BETWEEN
AZIMUTH CHECKS
NOT TO EXCEED
25
IN PRIMARY
TRAVERSE, THE
NUMBER OF
STATIONS BETWEEN
AZIMUTH CHECKS
NOT TO EXCEED
25
IN SECONDARY
TRAVERSE, THE
NUMBER OF
STATIONS BETWEEN
AZIMUTH CHECKS
NOT TO EXCEED
35
IN TERTIARY
TRAVERSE, THE
NUMBER OF
STATIONS BETWEEN
AZIMUTH CHECKS
NOT TO EXCEED
50
IN PRIMARY
TRIANGULATION, THE
SPACING OF
STATIONS NOT TO
EXCEED
1-3 KM
IN SECONDARY
TRIANGULATION, THE
SPACING OF
STATIONS NOT TO
EXCEED
1 KM
IN TERTIARY
TRIANGULATION, THE
SPACING OF
STATIONS NOT TO
EXCEED
CONSISTENT WITH GOOD SIGHTING
IN PRIMARY
TRIANGULATION,
TRIANGLE CLOSURE
NOT TO EXCEED
BASE MEASUREMENT
5
IN SECONDARY
TRIANGULATION,
TRIANGLE CLOSURE
NOT TO EXCEED
BASE MEASUREMENT
10
IN TERTIARY
TRIANGULATION,
TRIANGLE CLOSURE
NOT TO EXCEED
BASE MEASUREMENT
30
QUALITY OF
CONTROL TO BE
USED WHEN THE
AREA IS LESS THAN
1,500 HECTARES
TERTIARY CONTROL
QUALITY OF
CONTROL TO BE
USED WHEN THE
AREA IS 1,500 TO
15,000 HECTARES
SECONDARY CONTROL
QUALITY OF
CONTROL TO BE
USED WHEN THE
AREA IS ABOVE
15,000 HECTARES
PRIMARY CONTROL
ADVANCE SURVEYS
SHALL BE MADE
ONLY AFTER A
WRITTEN AUTHORITY
IS ISSUED UPON
RECOMMENDATION
OF THE
RTD FOR LANDS
SURVEY AUTHORITY OR
ORDER IN PUBLIC LAND
SUBDIVISION AND
GROUP SETTLEMENT
AND CADASTRAL
SURVEY UP TO 1500
HECTARES SHALL BE
ISSUED BY
RTD FOR LANDS
SURVEY AUTHORITY
OR ORDER FOR
LANDS WITHIN THE
CLASSIFIED AND
UNCLASSIFIED
PUBLIC FOREST
RTD
GEODETIC ENGINEERS IS
THE PRIVATE PRACTICE
WHO WANTS TO ENTER
INTO CONTRACT WITH THE
LANDS WITH THE
LANDOWNERS OF LGUS
SHALL FIRST OBTAIN
WRITTEN AUTHORITY OR
PERMISSION FROM THE
RTD
CADASTRAL SURVEY OF
MUNICIPALITIES
AUTHORIZED BY THE
PRESIDENT OF THE
PHILIPPINES SHALL BE
MADE BY GEODETIC
ENGINEERS UPON
ORDER TO BE FLOWN
RTD OR RED
SURVEY AUTHORITY
OR ORDER IN PUBLIC
LAND SUBDIVISION
AND CADASTRAL
SURVEY ABOVE 1500
HECTARES SHALL BE
ISSUED BY
RED
SURVEY AUTHORITY
OR ORDER IN
INTEGRATED SOCIAL
FOREST PROJECTS
SHALL BE ISSUED BY
RED
DURING CADASTRAL
SURVEY PRIVATE
CLAIMS WITHIN
UNCLASSIFIED FOREST
SHALL NOT BE SURVEY
EXCEPT WITH WRITTEN
AUTHORITY FROM THE
RED
UPON
RECOMMENDATION
FOR THE ISSUANCE
OF ADVANCE
SURVEY, A WRITTEN
GRANTED BY THE
RED
REDUCTION OF
PERSONNEL AND
EQUIPMENT PER
CADASTRAL SURVEY
MANAGEMENT PLAN
SHALL BE MADE
WITHOUT PRIOR
RED OF THE
APPROVAL
CADASTRAL SURVEY,
ADVERSE CLAIM INSIDE
LEASED PROPERTIES
SHALL BE
DISREGARDED UNLESS
SUPPORTED BY
WRITTEN AUTHORITY
REDTHE
FROM
SURVEY AUTHORITY
OR ORDER IN
POLITICAL
BOUNDARY SURVEYS
AND SETTLEMENT OF
BOUNDARY DISPUTE
SHALL BE ISSUED BY
RED
CADASTRAL SURVEY
PROJECT NUMBER
SHALL BE SECURED
FROM THE
LMB
IN DELIMITATION OF
RESERVATIONS PARKS AND
OTHER PROTECTED AREAS
PROCESSED DATA AND
OTHER SURVEY RETURNS
SHALL BE SUBMITTED FOR
VERIFICATION AND
APPROVAL OF THE PLAN
TO THE
LMS
GEODETIC
ENGINEERS MAY
UNDERTAKE SURVEYS
INSIDE CADASTRAL
PROJECT PROVIDED
PARCELS WERE
TITLED AND COPY OF PLAN BE PROVIDED TO
THE CHIEF CADASTRAL PROJECT
THE SURVEY OF
CADASTRAL PROJECT
SHALL BE
CONSIDERED AS IN
PROGRESS FROM
THE DATE THE
SURVEY IS ORDER BY
IN MINERAL LAND
SURVEY AUTHORITY
OR ORDER ISSUED
VALID FOR
12 MONTHS
WHITE OF PRINTS OF
THE CADASTRAL MAP
BE FURNISHED TO THE
BARANGAY OF THE LOT
CLAIMANTS TO VERIFY
AND REPORT ANY
ERROR OR MISTAKE
WITHIN
30 DAYS FROM DATE OF POSTING
NOTIFICATION OF LOT
CLAIMANTS, A PUBLIC
NOTICE SHALL BE
POSTED CONSPICUOUS
PLACES IN THE
LOCALITY AND
MUNICIPALITY BUILDING
30-DAY NOTICE
KNOWN
AS
ISSUANCE OF CADASTRAL
PROJECT SURVEY ORDER,
GEODETIC ENGINEERS
SHALL SUBMIT A LIST OF
THEIR SURVEY IN
PROGRESS INSIDE THE
PROJECT TO THE CHIEF OF
CADASTRAL PROJECT
WITHIN
60 DAYS
DURING SKETCHING,
THE CORNER AT THE
POINTS OF
INTERSECTION OF
THE ROAD AND LOT
BOUNDARY LINES
SHALL BE
MONUMENTED ON THE GROUND
DURING THE
CADASTRAL SURVEY,
FORESHORE LANDS
SHALL
BE SURVEYED AS CADASTRAL LOT
WHEN A CADASTRAL
PROJECT COMPRISES
ONLY PORTION OF A
CITY OR
MUNICIPALITY THE
NUMBERING SHALL
BEGIN
FROM
ON TO THE LAST NUMBER OF THE
CONSECUTIVELY
PROJECT
SURVEY, NAME OF
GEODETIC ENGINEER AND
CLAIMANT OR
REPRESENTATIVE WHO
APPEARED WITH
SIGNATURE, DATE OF
SURVEY AND
APPEARANCE, MUST BE
NUMERICAL
SKETCH
SURVEY RECORD
AFFIXED
TOAND
COMPLETE
WITHIN THE
CADASTRAL PROJECT
MUST BE SUBMITTED
TO THE LAND
MANAGEMENT SECTOR
FOR VERIFICATION
THROUGH THE CHIEF
OF CADASTRAL
FOUR MONTHS
ADVANCE SURVEY IS
ALLOWED IN ONGOING
CADASTRAL PROJECT
BASED ON SUFFICIENT
URGENT NEEDS OF
CLAIMANT, PROVIDED
THAT AT LEAST
THE PROJECT CONTROL HAS BEEN APPROVED
SURVEYS IN THE
BARANGAY, LOT
CLAIMANTS MUST
VERIFY THE BOUNDARY
AS SKETCHED AND
MONUMENTED AND
THEY SHALL BE
SURVEY
NOTIFICATION
NOTIFIED
BYCARD
IN CASE OF
TRANSFER OF
OWNERSHIP, THE
SURVEY
NOTIFICATION CARD
MUST BE
TRANSFERRED
AS AN INTEGRAL PART OF DOCUMENT OF
TRANSFER
OF UNTITLED
PROPERTY; ALL
ADJOINING OWNERS
SHALL BE INFORMED BY
THE GEODETIC
ENGINEER TO ATTEND
THE SCHEDULED DATE
SURVEY
LETTER
OFNOTIFICATION
SURVEY BY
PARCELS ADJOINING
THE PROJECT
BOUNDARIES SHALL BE
NOTIFIED OF THE
SURVEY AND A SET OF
INDEX CARD SHALL BE
PREPARED FOR THEM
A LOT CARD
KNOWN
AS
SHALL BE SHALL BE
FURNISHED BY THE
GEODETIC ENGINEER
CONCERNED THE
APPROVED NARRATIVE
TECHNICAL
DESCRIPTION OF AT
3 COPIES
LEAST
MINOR DIFFERENCE
BETWEEN THE PLAN OF
PREVIOUS SURVEYS AND
THE ACTUAL BOUNDARIES
AS AGREED IN THE
CADASTRAL SURVEY AND
ADJOINING LOTS ARE NOT
YET DECREED/TITLED
THE LATTER SHALL BE ACCEPTED
DURING THE
CADASTRAL SURVEY,
WHEN OVERLAP IS
BETWEEN A TITLED OR
LEASED PROPERTY AND
AN APPROVED SURVEY
NOT YET LEASED OR
TITLED THE
THE LATTER SHALL BE AMENDED
SKETCH PLAN ON
POLITICAL BOUNDARY
DISPUTE SHALL BE
PREPARED FOR
SETTLEMENT. A HEAVY
FULL LINES BASE ON TAX
DECLARATION, SHALL BE
REPRESENT THE DIVISION
BETWEEN
MUNICIPALITIES
AFTER LOT
SKETCHING, THE
PROJECT SHALL BE
DIVIDED INTO
CADASTRAL CASES IN
WHICH ONE CASE
SHALL BE COMPOSED
OF
1 BARANGAY
THE OBSERVED
CORRECTED DATA
NEAREST ARE
SECOND OF ARC OF
THE PRIMARY
TRAVERSE LINE
SHALL BE RECORDED
IN ANGLE
THE BOOK
PRIMARY
IN PRIMARY CONTROL
TRAVERSE, THE
ANGULAR ERROR
AZIMUTH CLOSURE
SHALL BE DISTRIBUTED
AMONG THE ANGLES
BETWEEN THE
AZIMUTH LINE
UNIFORMLY
GENERALLY, IN THE
TOPOGRAPHIC
SURVEY THE FIRST
STEP IS TO
ESTABLISH
HORIZONTAL CONTROL
PORTION OF PATENTED,
LEASED, OR DECREED
WHICH FORM PART OF
RIVER, ESTERO,
ARROYO, CREEK
DURING CADASTRAL
PROJECT SHALL BE
SURVEYED
AS A SEPARATE LOT
SURVEYS NOT
PATENTED LEASED OR
DECREED WHICH FORM
PART OF RIVER,
ESTERO, ARROYO OR
CREEK DURING
CADASTRAL PROJECT
AS BE
A SEPARATE
LOT AND
SHALL
SURVEY
WHEN A CLAIMANT
INSIST UPON HER
RIGHTS TO BE TAKEN
BY A ROAD OF WAY THE
AREA SHALL BE
SURVEYED WITH OTHER
PORTION OF THE CLAIM
AS A SEPARATE LOT
WHEN ADVANCE
CLAIMANTS DO NOT
DESIGN A SURVEYS OF
THE CLAIM
UNDERGOING SURVEY
SHALL BE INDICATED
THE PLAN AND
SURVEYED
AS A SEPARATE LOT
AS DETERMINED BY THE
DISTRICT ENGINEER ON
PORTION OF LOT
CLAIMED AS PRIVATE
PROPERTY BUT FALLING
WITHIN RIGHT-OF-WAY
OF ROAD IT.
SHALL BE NUMBERED AS A SEPARATE LOT
IN CADASTRAL
SURVEY, CLAIMS
INSIDE PREVIOUS
SURVEY NOT YET
TITLED SHALL.
BE MADE AS SEPARATE LOT
LOT SKETCHING IN A
CADASTRAL SURVEY,
FORESHORE LANDS
SHALL BE A SEPARATE CADASTRAL LOT
AND GROUP
SETTLEMENT SURVEY
SHALL BE
TRANSFORMED INTO
THE SYSTEM OF THE
CADASTER AND BE
PLOTTED ON THE
AS ONE BIG LOT
CADASTRAL
MAP.
FUNDING CADASTRAL
SURVEY OF THE
MUNICIPALITY MAY BE
AWARDED BY
CADASTRAL CASE,
CADASTRAL SURVEY
NUMBER FOR A
BE MUNICIPALITY
ONLY ONE
CERTAIN
.
GEODETIC ENGINEER IN
THE DEPARTMENT OF
ENVIRONMENTAL AND
NATURAL RESOURCES
SHALL HAVE THEIR
FIELD NOTES AND
FIELD NOTES COVER BE
SWORN.
BEFORE AND OFFICIAL AUTHORIZED TO
SUBSCRIBED
PRS92, GEODETIC
ENGINEERS
PRACTITIONER MUST
SUBMIT STATUS OF
REFERENCE POINTS IN
ALL THEIR FIELD
SURVEY PRESCRIBE
LOCATION
MONUMENT
RECOVERY REPORT
FROM
KNOWN.
INVOLVE LARGE
AREAS AND TAKE
INTO ACCOUNT THE
EARTHS CURVATURE.
GEODETIC SURVEYING
COVER LIMITED
AREAS AND EARTH
CURVATURE
NEGLECTED
PLANE SURVEYING
CONSIST OF FOUR
PLANO-CONVEX
LENSES PLACED IN
EYEPIECE SLIDE
ERECTING EYEPIECE
COMPOSED OF TWO
PLANO-CONVEX
LENSES PLACED IN
EYEPIECE SLIDE
INVERTING EYEPIECE
A ROD READING ON
A POINT WITH
KNOWN ELEVATION
BACK SIGHT LEVELING
DETERMINING THE
SHAPE OF THE
SURFACE OF THE
GROUND AND THE
LOCATION OF
NATURAL AND
ARTIFICIAL FEATURES
ON IT.SURVEY
TOPOGRAPHIC
A DEVICE USE TO
ENLARGE OR
REDUCE THE SCALE.
PANTOGRAPH
THE ELEVATION OF
THE GROUND
SURFACE ALONG A
DEFINITE LINE
DESIRED.
PROFILE LEVELING
IN POLITICAL
BOUNDARY DISPUTES
THE DEPARTMENT OF
ENVIRONMENTAL
AND NATURAL
RESOURCES.
PROVIDED TECHNICAL ASSISTANCE
BOUNDARY DISPUTE
BETWEEN MUNICIPALITIES
NOT SETTLED BEFORE THE
COMPLETION OF THE
FIELD WORK OF THE
CADASTRAL PROJECT
SHALL BE SURVEYED AND
BE TREATED AS SEPARATE.
CADASTRAL CASE
WHEN THE
SECONDARY
CONTROL IS DIVIDED
INTO LOOPS, AT
WHAT STATION AN
ASTRONOMICAL
OBSERVATION BE
JUNCTION STATIONS
BETWEEN LOOPS
TAKEN?
WITHOUT
CORRESPONDING
NOTIFICATION CARD
SUBMITTED, DURING
COURT HEARING THE
ANSWER SHALL NOT BE VERIFIED
ADVANCE SURVEY IS
ALLOWED IN GOING
CADASTRAL PROJECT
BASED ON SUFFICIENT
URGENT NEEDS OF
CLAIMANT, PROVIDED
THAT AT LEAST.
THE PROJECT CONTROL HAS BEEN APPROVED
IT IS AN INTERPOLATION
METHOD OF CONTOUR
LINE WHICH IS MENTALLY
TRACED BY MOVING
CLOCKWISE OBSERVING
THAT IT WILL JOIN ONLY
ALL POINTS OF SAME
ELEVATION UNTIL IT
CLOSES UPON ITSELF
BY INSPECTION METHOD
ON NATURAL
FEATURES AS
POLITICAL
BOUNDARIES, SHALL
BE MONUMENTED.
ON THE FIRST AND THE LAST CORNER
IN FLIGHT PLANNING
OF AERIAL SURVEY,
THE TOTAL
EFFECTIVE WIDTH
DIVIDED BY
EFFECTIVE WITH OF
PHOTOGRAPH IN THE
NUMBER OF FLIGHT LINES
PARALLAX OCCURS
IN A TRANSIT OR
LEVEL TELESCOPE
BECAUSE?
THE CROSS-HAIRS ARE NOT IN THE FOCAL
PLANE OF THE EYEPIECE
ASTRONOMICAL
OBSERVATION FOR
AZIMUTH IN THE LINES OF
THE MAN CONTROL OF
CADASTRAL PROJECT,
OTHER THAN LIVE BLLMN
TO 2, SHALL BE USED TO
CHECK ON THE CARRIED.
GRID AZIMUTH
THE AZIMUTH IN
CADASTRAL PROJECT
IS KNOWN AS
GRID AZIMUTH
CONTROL IN ISOLATED
LAND SURVEYS,
ASTRONOMICAL
AZIMUTH SHALL BE
DETERMINED BY
ASTRONOMICAL
OBSERVATION OF AT
A SERIES
OF TWO SETS
LEAST.
IN TOPOGRAPHIC
SURVEY, SPOT
ELEVATION ARE
TAKEN TO SHOW
SUMMIT AND OTHER CRITICAL POINT
LAND SURVEYS
AFFECTING ROAD
WITHIN RESIDENTIAL
SUBDIVISION, NOTICE
AND CONSULTATION BE
MADE ON THE MINIMUM
WIDTHS OF ROADWAYS
TOLGP&DO
THE OFFICE
OF
(NOW NHA)
SURVEY AUTHORITY OR
LAND CLASSIFICATION
OR DELIMITATION
SURVEYS AND
DELIMITATION SURVEYS
OF AREAS PROPOSED
FOR RESERVATION
SECRETARY
OF DENR BY
SHALL
BE ISSUED
IS A SURVEY OF
GEOGRAPHIC AND
SCIENTIFIC INVESTIGATION
EXPERIMENTS OF ALL
OTHER SURVEYS NOT
OTHERWISE MENTIONED
IN THE MANUAL FOR LAND
SURVEYS AND CANNOT BE
SUBJECT OF TITLING.
SPECIAL WORK ORDER SURVEY
IT IS A KIND OF SURVEY
FOR THE PURPOSE OF
SEGREGATING TWENTY
PERCENT OR LESS OF
AREA OF PREVIOUSLY
SURVEYED LARGE
TRACT OF PUBLIC
LAND.
SEGREGATION SURVEY
IT IS A SURVEY OF A
PREVIOUSLY SURVEYED
TRACT OF LAND FOR THE
PURPOSE OF VOIDING THE
ORIGINAL APPROVED BUT
UNDECREED SURVEY DUE
TO FAILURE TO INCLUDE
ALL THE AREAS CLAIMED
BY THE APPLICANTS.
RESURVEYS
DURING CADASTRAL
LOT SURVEY, TITLED
AND LEASED
PROPERTIES WITHOUT
TECHNICAL
DESCRIPTIONS FROM
MAGNETIC SURVEYS
SHALL BE SUBJECT TO
RESURVEYS
GEODETIC ENGINEERS
WHO ARE COMMISSIONED
BY THE OWNER
/DEVELOPERS ON A
PROPERTY TO BE
DEVELOPED INTO
HOUSING SUBDIVISION
PROJECT, HE SHALL FIRST
CONDUCT IN THE AREA OF
RELOCATION SURVEY
IN HOUSING
SUBDIVISION OF TITLE
PROPERTY, IT IS
NECESSARY TO
DETERMINE THE
EXTENT OF PROPERTY
BEFORE TOPOGRAPHIC
SURVEY HENCE, A NEED
RELOCATION SURVEY
A KIND OF SURVEY,
BASIS FOR THE
PREPARATION OF
DEVELOPMENT PLAN
FOR LOTS, ROADS, AND
DRAINAGE CANAL IN A
HOUSING SUBDIVISION
PROJECT IS
TOPOGRAPHIC SURVEY
PARCEL OF LAND
TITLED FORM A
CADASTRAL MAPPING
SUBJECT TO
SUBDIVISION MUST
FIRST BE SUBJECT TO
CONVERSION SURVEY
AFTER TAKING A
BACKSIGHT ON THE
ROD HELD AT THE
STATION THEN A
FORESIGHT BE TAKEN
AT THE FORWARD
STATION BY LOOSENING
THE
LOWER CLAMP SCREW
THE POINT OR
OBJECT SIGHTED
COULD BE BISECTED
BY THE USE OF THE
LOWER CLAMP TANGENT SCREW
THE VERNIER OF AN
ENGINEERS TRANSIT
BE SET TO 000000
READING WITH THE
USE OF
UPPER CLAMP TANGENT SCREW
AN ERROR THAT SO
LONG AS CONDITIONS
REMAIN UNCHANGED
ALWAYS HAS THE SAME
MAGNITUDE AND SAME
ALGEBRAIC SIGN,
POSITIVE OR NEGATIVE.
SYSTEMATIC
CONSTANT OR
SYSTEMATIC ERRORS
ARE
CUMULATIVE
IN ISOLATED LAND
SURVEY, BEFORE
LEAVING THE PLACE
OF SURVEY THE
TRAVERSES SHALL BE
COMPUTED AND
CLOSED AND
DETERMINE
THE
RELATIVE ERROR CLOSURE
THE DIFFERENCE
BETWEEN THE
MEASUREMENT AND
TRUE VALUE IS
RESULTANT ERROR
THE DIFFERENCE
BETWEEN EACH
INDIVIDUAL
MEASUREMENTS AND
THE MEAN VALUE OF
MEASUREMENTS IS
DEVIATION
MEASUREMENTS BY
REPETITION THE
DIFFERENCE IN THE
STARTING BACK
AZIMUTH AND THE
CLOSING BACK
AZIMUTH OF THE
ANGULAR
ERROR
CLOSURE
INITIAL
LINE
IS
IN PRIMARY CONTROL
MEASUREMENT, THE
DIFFERENCE IN THE
STARTING BACK
AZIMUTH AND CLOSING
BACK AZIMUTH OF THE
INITIAL LINE IS THE
ANGULAR ERROR CLOSURE
CONDITION CHANGE
RESULTING IN
CORRESPONDING
CHANGES IS THE
MAGNITUDE OF THE
ERROR IS A
VARIABLE SYSTEMATIC ERROR
CONDITION DO NOT
CHANGE DURING A
SERIES OF
MEASUREMENTS IS
CONSTANT SYSTEMATIC ERROR
INTERIOR ANGLES OF
THE POLYGON FROM
ONE HUNDRED AND
EIGHTY DEGREES
MULTIPLIED BY THE
QUANTITY NUMBER OF
ANGLES IN THE CIRCUIT
LESS TWO IS CALLED
LINEAR ERROR OF CLOSURE
FOR OBSERVED
ALTITUDES OF THE
STAR, WE APPLY ONLY
CORRECTIONS FOR
INDEX ERROR AND REFRACTION
COMBINATION OF
CAUSES BEYOND THE
ABILITY OF THE
OBSERVER TO
CONTROL AND FOR
WHICH IT IS
IMPOSSIBLE TO MAKE
ACCIDENTAL ERROR
CORRECTION.
ERRORS DUE TO
IMPERFECTIONS OR
FAULTY ADJUSTMENTS
OF THE INSTRUMENTS
OR DEVICES WITH
MEASUREMENTS IS
TAKEN IS
INSTRUMENT ERROR
AN UNINTENTIONAL
FAULT OF CONDUCT
ARISING FROM POOR
ADJUSTMENT OR
CONFUSION OF MIND
OF THE OBSERVER IS
MISTAKE
GENERALLY,
DIFFERENTIAL
LEVELING DIFFERS
FROM PROFILE
LEVELING IS THE
NUMBER OF
FORESIGHT
SKETCH PLANS ON
POLITICAL
BOUNDARY DISPUTES
SHALL BE PREPARED
FOR SETTLEMENT.
ORDINAL
FULL LINES
INDICATES
LOT LINES
POLITICAL BOUNDARY
DISPUTES SHALL BE
SURVEYED AT REGULAR
LOTS, AND OTHER
MINERAL LAND SURVEY
SHALL BE INDICATED
ON THE CADASTRAL
LOT LINES
MAP
BY
RESERVATION, PARKS
AND OTHER
PROTECTED AREAS,
THE UNSURVEYED
CLAIMS SHALL BE
SKETCHED AND
REFLECTED IN THE
LOT LINES
PLAN
IN
IN TOPOGRAPHY, IT
IS A LINE DIVIDING
THE WATER SHEDS,
AND ON ONE SIDE
WATER WILL FLOW
IN ONE DIRECTION
RIDGE LINE
IN TOPOGRAPHY,
ARE LINES ALONG
THE BOTTOM OF
THE VALLEY
WHERE TWO SIDES
OF THE
VALLEY
MEET
VALLEY LINES
A LINE TANGENT
TO A LEVEL
SURFACE IS
HORIZONTAL LINE
A LINE
PERPENDICULAR
TO THE PLANE OF
HORIZON IS
VERTICAL LINE
THE SLOPE OR
RATE OF ASCENT
OR DESCENT IS
GRADE OF LINE
RESERVATIONS, PARKS
AND OTHER PROTECTED
AREAS, PREVIOUSLY
APPROVED SURVEYS
INSIDE THE AREA SHALL
BE REFLECTED IN THE
PLAN, INDICATING THERE
IN THE SURVEY NUMBERS
BY LINES
LIGHT FULL
IT IS THE LINE
DRAWN ON A MAP OR
CHART TO
REPRESENT THE
TRACT TO WHICH AN
AIRCRAFT HAS
FLOWN OR TO BE
FLOWN.
FLIGHT LINE
IT IS THE
INTERSECTION OR
TRADE OF A
HORIZONTAL PLANE
WITH THE SURFACE
OF THE GROUND
CONTOUR LINES
A CONTOUR LINES
WHICH CLOSES
WITHIN THE MAP
INDICATES A
DEPRESSION
IT IS A SURVEY MADE OF
REESTABLISHMENT OF
CORNERS OR BOUNDARY
LINES USING THE BEARING
DISTANCE, AND AREA
STATED IN THE
PREVIOUSLY APPROVED
PLAN OR WRITTEN IN THE
LEASE OR TORRENS TITLE.
RELOCATION SURVEY
CONTOUR INTERVAL
BETWEEN LINES
INDICATED LINES
INDICATES
STEEPNESS
CLOSELY-SPACED
CONTOUR LINES
INDICATES A
STEEP SLOPE
CONTOUR LINES
CHARACTERISTICS IS
THAT ALL POINTS AS
ANY ONE CONTOUR
LINE HAVE
EQUAL ELEVATION
CONTOUR LINES
CROSS EACH OTHER
WHERE THERE IS
AN OVERHANGING CLIFF
IT IS THE PROCESS
OF SPACING THE
CONTOUR LINES
PROPORTIONALLY
BETWEEN POINTS OF
KNOWN ELEVATION.
CONTOUR INTERPOLATION
IN UNDERGROUND
SURVEYING THE
HEIGHT OF POINTS
IS POSITIVE IF THE
POINT SIGHTED
IS
ABOVE THE STATION
A LIMITED
GEOGRAPHIC
COVERAGE SUCH
AS MUNICIPALITY, A
LARGE ISOLATED
TRACT OF LAND.
PROJECT CONTROL SURVEYS
SURVEY MADE TO
DETERMINE THE METES
AND BOUNDS OF ALL
PARCEL WITHIN THE
ENTIRE MUNICIPALITY
OR CITY FOR
REGISTRATION AND
OTHER PURPOSES.
CADASTRAL SURVEY
WHEREIN THE
BEARINGS AND
DISTANCES OF THE
INDIVIDUAL LOTS ARE
DETERMINED FROM
COMPUTATIONS BASED
ON THE ACTUAL
NUMERICAL
CADASTRE
SURVEY
.
CADASTRAL SURVEY
WHEREIN THE BEARINGS
AND DISTANCES OF THE
INDIVIDUAL LOTS ARE
DETERMINED USING
TRANSIT AND STADIA,
SCALING FROM PHOTO
MAP AND OTHER RELATED
METHODS.
GRAPHICAL SURVEY
CLASSES OF SURVEYS OF
PARCELS OF LANDS USE
FOR AGRICULTURAL,
RESIDENTIAL,
COMMERCIAL,
RESETTLEMENT, OR
OTHER PURPOSES
COVERING AREAS NOT
MORE THAN 1,500
ISOLATED SURVEYS
HECTARES.
THE SUBDIVISION OF
ALIENABLE AND
DISPOSABLE LANDS
COVERING AN AREA
OF MORE THAN 1,500
HECTARES.
PUBLIC LAND SUBDIVISION
SURVEYS COVERING
UNTITLED/UNDECREED
PROPERTIES BY CHANGING
THE NUMBER OF LOTS
THEREOF WITHOUT
AFFECTING THE ORIGINAL
TECHNICAL DESCRIPTION
OF BOUNDARY.
AMENDMENT SURVEY
SURVEYS OF LAND
ADMINISTERED BY
OR BELONGINGS TO
THE NATIONAL
GOVERNMENT OR
ANY OF ITS
BRANCHES OR
INSTRUMENTALITIES.
GOVERNMENT LAND SURVEYS
SURVEYS OF ALL
PATRIMONIAL
PROPERTIES OWNED
BY THE
GOVERNMENT NOT
INTENDED FOR
PUBLIC USE.
SURVEYS ON LANDS
ACQUIRED BY THE
PROVINCIAL
MUNICIPAL/CITY AND
BARANGAY
GOVERNMENT
PURSUANT TO
REPUBLIC
ACT
7160.
LOCAL GOVERNMENT UNIT LAND SURVEYS
TO CONDUCT PARKS
AND PROTECTED
AREAS DELIMITATION
SURVEYS WITH AREA
COVERS TWO OR MORE
REGIONS, THE SURVEY
ORDER SHALL BE
ISSUED BY THE
SECRETARY OF DENR
TO CONDUCT
DELIMITATION SURVEY
FOR WATERSHED
RESERVATION WITH
AREA COVERS TWO OR
MORE REGIONS, THE
SURVEY ORDER SHALL
BE ISSUED BY THE
SECRETARY OF DENR
BOUNDARY DISPUTES
BETWEEN TWO OR
MORE PROVINCES
BELONGINGS TO
DIFFERENT REGIONS,
THE SURVEY ORDER
SHALL BE ISSUED BY
DIRECTOR,
THE LMB
TO CONDUCT ISOLATED
LAND SURVEYS ON AREAS
COVERED BY SPECIAL
LAW/PROCLAMATION
GIVING JURISDICTION TO
THE LAND MANAGEMENT
BUREAU, AS PROVIDED IN
THE SURVEY AUTHORITY
SHALL BE ISSUED BY THE
DIRECTOR, LMB
TO CONDUCT
DELIMITATION
SURVEY ON LAND
CLASSIFICATION,
SURVEY ORDER
SHALL BE ISSUED
BY
THE
ADMINISTRATOR NAMRIA
TO CONDUCT
DELIMITATION SURVEYS
ON PARKS AND
PROTECTED AREAS
WITH 5,000 HECTARES
AND ABOVE, THE
SURVEY ORDER SHALL
BE ISSUED BY THE
RED
POLITICAL
BOUNDARY SURVEY
IN AN
INTERREGIONAL
BOUNDARY
DISPUTES, THE
SURVEY ORDER
SHALL BERED
ISSUED BY
TO CONDUCT A
DELIMITATION SURVEY FOR
WATERSHED RESERVATION
IN A REGION WITH AN
AREA OF SIX THOUSAND
(6,000) HECTARES, THE
SURVEY ORDER SHALL BE
ISSUED BY THE
RED
TO CONDUCT SURVEY OF
LOCAL GOVERNMENT
UNITS LANDS OF ONE
HUNDRED FIFTY (150)
HECTARES, AS ONE
HUNDRED FIFTY (150)
HECTARES, THE SURVEY
ORDER SHALL BE ISSUED
BY THE
RED
IN UNDERGROUND
SURVEY, THE
HEIGHT OF
INSTRUMENT IS
POSITIVE IF THE
INSTRUMENT IS
ABOVE THE STATION
POLITICAL
BOUNDARY SURVEY
OF BARANGAYS IN
THE SAME
MUNICIPALITY, THE
SURVEY AUTHORITY
SHALL BE ISSUED BY
RTD OF LANDS
IN UNDERGROUND
SURVEYING THE
HEIGHT OF POINT IS
NEGATIVE IF THE
POINT SIGHTED IS
BELOW THE STATION
IN UNDERGROUND
SURVEYING, EXPECT IN
NEARLY LEVEL
WORKING, THE
DISTANCE FORM ONE
STATION TO THE NEXT
STATION IS MEASURED
ON THE
SLOPE DISTANCE
IN TOPOGRAPHIC
MAP WHERE THERE
IS WATER IN
DEPRESSION, THE
CONTOUR LINE IS
SHADED
BLUE
DISPLACEMENT OF THE
IMAGE OF OBJECTS
WITH RESPECT TO THE
OTHER OBJECTS DUE
TO DIFFERENCE IN
THEIR RESPECTIVE
DISTANCE FROM THE
PARALLAX
OBSERVER
DISTANCE SUBSTANDED
BY THE INTERSECTION
OF THE PATH OF THE
SUN AND CELESTIAL
HORIZON OF THE
OBSERVER TO THE
SUNS POSITION
ALTITUDE
OF THE SUN
DURING
OBSERVATION
IT IS THE ANGULAR
DISTANCE NORTH OR
SOUTH OF THE
CELESTIAL SPHERE
DECLINATION OF THE SUN
IN STELLAR
OBSERVATION, THE
ANGULAR DISTANCE
FROM THE MARK TO
THE STAR IS
OBSERVED HORIZONTAL ANGLE
SOLAR OBSERVATION
CONDUCTED IN THE
AFTERNOON, THE
AZIMUTH OF THE
SUN IS EQUAL TO
HORIZONTAL ANGLE A
IN AFTERNOON
OBSERVATION, WHEN THE
MARK OBSERVED IS IN THE
NORTHEAST AND ON THE
RIGHT SIDE OF THE SUN,
THE TRUE AZIMUTH OF
THE LINE (STATION
OCCUPIED TO MARK) IS
A-OBSERVED HORIZONTAL ANGLE
IN AFTERNOON
OBSERVATION, WHEN THE
MARK OBSERVED IS IN THE
SOUTHEAST AND ON THE
LEFT SIDE OF THE SUN,
THE TRUE AZIMUTH OF
THE LINE (STATION
OCCUPIED TO MARK) IS
A-OBSERVED HORIZONTAL ANGLE
OBSERVATION, WHEN
THE MARK OBSERVED
IS ON THE SOUTHWEST
AND ON THE RIGHT
SIDE OF THE SUN, THE
TRUE AZIMUTH OF THE
LINE (STATION
(AZIMUTH OF THE
SUN)-(OBSERVED
OCCUPIED
TO
MARK)
IS
HORIZONTAL ANGLE)
OBSERVATION, WHEN
THE MARK OBSERVED
IS ON THE NORTHEAST
AND ON THE LEFT SIDE
OF THE SUN, THE TRUE
AZIMUTH OF THE LINE
(STATION OCCUPIED TO
(AZIMUTH
OF THE SUN)-(OBSERVED
MARK)
IS
HORIZONTAL ANGLE)
OBSERVATION OF
WESTERN
ELONGATION, WHEN
MARK IS ON THE
RIGHT OF STAR, THE
TRUE AZIMUTH
STATION TO MARK
180-OBSERVED
HORIZONTAL ANGLEBEARING OF STARPOLARIS OBSERVATION AT
WESTERN ELONGATION
WHEN MARK TO THE LEFT
OF STAR, THE TRUE
AZIMUTH STATION TO
MARK
EQUALS.
180-OBSERVED HORIZONTAL ANGLE-BEARING
OF STAR
OBSERVATION AT
EASTERN
ELONGATION, WHEN
MARK IS ON THE
LEFT SIDE OF STAR
THE TRUE AZIMUTH
STATION TO MARK
POLARIS OBSERVATION
AT EASTERN
ELONGATION, WHEN
THE MARK IS TO THE
RIGHT OF THE STAR,
THE TRUE AZIMUTH
STATION TO MARK
EQUALS.
180+BEARING OF STAR+ (360-OBSERVE
HORIZONTAL ANGLE)
POLARIS AT LOWER
CULMINATION, WHEN
MARK IS ON THE RIGHT
SIDE OF STAR, THE
TRUE AZIMUTH STATION
OCCUPIED TO MARK
EQUALS.
180+HORIZONTAL ANGLE STARS TO MARK
POLARIS AT LOWER
CULMINATION, WHEN
THE MARK IS ON THE
LEFT SIDE OF STAR,
THE TRUE AZIMUTH
STATION OCCUPIED TO
MARK EQUALS.
180-HORIZONTAL ANGLE MARK TO STAR
POLARIS OBSERVATION
AT UPPER
CULMINATION, WHEN
THE MARK IS ON THE
RIGHT SIDE OF STAR,
THE TRUE AZIMUTH
STATION OCCUPIED TO
MARK
EQUALS.
180+(360-OBSERVED HORIZONTAL ANGLE)
POLARIS AT UPPER
CULMINATION, WHEN
THE MARK IS ON THE
LEFT SIDE OF STAR,
THE TRUE AZIMUTH
STATION OCCUPIED TO
MARK EQUALS.
180-(OBSERVED HORIZONTAL ANGLE)
SOLAR OBSERVATION
CONDUCTED IN THE
MORNING THE
AZIMUTH OF THE
SUN RECKONED
FROM THE SOUTH IS
EQUAL TO.
360-HORIZONTAL ANGLE A
OBSERVATION WHEN
THE MARK OBSERVED
IS ON THE NORTHEAST
AND ON THE LEFT SIDE
OF THE SUN, THE TRUE
AZIMUTH OF THE LINE
(STATION OCCUPIED TO
360-A-(OBSERVED
HORIZONTAL ANGLE)
MARK).
OBSERVATION, WHEN
THE MARK OBSERVED
IS ON SOUTHEAST AND
ON THE RIGHT SIDE OF
THE SUN, THE TRUE
AZIMUTH OF THE LINE
(STATION OCCUPIED TO
360-A+(ANGLE
SUN TO
MARK)
IS.THE MARK)
IN AFTERNOON
OBSERVATION, WHEN THE
MARK OBSERVED IS ON
THE SOUTHEAST AND ON
THE LEFT SIDE OF THE
SUN, THE TRUE AZIMUTH
OF THE LINE (STATION
OCCUPIED TO MARK) IS.
360-OBSERVED HORIZONTAL ANGLE+A
THE ADJOINING
CADASTRAL MAP NUMBER
ON THE NORTHEAST OF A
CERTAIN CADASTRAL MAP
IN THE LATITUDE AND
LONGITUDE OF THE POINT
OF INTERSECTION IN THE
QUADRANGLES OF
EXTREMES OF.
NORTH PARALLEL AND EAST MERIDIAN
THE ADJOINING
CADASTRAL MAP NUMBER
ON THE NORTH OF A
CERTAIN CADASTRAL MAP
IS THE LATITUDE AND
LONGITUDE OF THE POINT
OF INTERSECTION IN THE
QUADRANGLE OF ITS
EXTREMES OF.
NORTH PARALLEL AND WEST MERIDIAN
THE ADJOINING
CADASTRAL MAP NUMBER
ON THE EAST OF A
CERTAIN CADASTRAL MAP
IN THE LATITUDE AND
LONGITUDE OF THE POINT
OF INTERSECTION IN THE
QUADRANGLES OF ITS
EXTREMES OF.
SOUTH PARALLEL AND EAST MERIDIAN
THE CORRESPONDING
MAP NUMBER OF A
PROJECTION MAP IS THE
LATITUDE AND
LONGITUDE OF THE
POINT OF INTERSECTION
IN THE QUADRANGLES OF
ITS
EXTREME.
SOUTH PARALLEL AND WEST MERIDIAN
MAP NUMBER OF A
CADASTRAL MAP IS THE
LATITUDE AND
LONGITUDE OF THE
POINT OF INTERSECTION
IN THE SPHEROIDAL
QUADRANGLES OF ITS
SOUTH PARALLEL
AND WEST
EXTREME
OF.MERIDIAN
IN PRIMARY CONTROL
MEASUREMENTS, BY
REPETITION, SUBTRACT THE
RECEIVE ANGLES FROM THE
BACK AZIMUTH OF THE
PRECEDING LINE. IF THE
DIFFERENCES IN NEGATIVE,
ADD 360 .THE POSITIVE SUM
IN THE
FORWARD AND AZIMUTH
MEASUREMENTS BY
REPETITION, AT THE INITIAL
STATION, ADD THE FIRST
ANGLES OR THE MEAN OF
THE OBSERVED ANGLES TO
THE BACK AZIMUTH, AND
SUBTRACT 360DEGREES IF
THE SUM EXCEED 360
DEGREES
FORWARDTHE
AND RESULT
AZIMUTH IS
IN PRIMARY CONTROL
MEASUREMENTS BY
REPETITION, AT THE SECOND
STATION ADD 10 DEGREES
TO THE FORWARD AZIMUTH
OF THE PRECEDING LINE,
SUBTRACT 360 DEGREES, IF
THE SUM EXCEED 360
DEGREES. THE RESULT IS
BACK AZIMUTH
ON PRIMARY
CONTROLS USING
TRIANGULATION BY
REPETITION METHOD,
THE ANGLES SHALL BE
MEASURED
6 TIMES
FOR SECONDARY
CONTROL USING
TRIANGULATION
REPETITION METHOD,
THE ANGLES SHALL BE
MEASURED
4 TIMES
FOR TERTIARY
CONTROL USING
TRIANGULATION
REPETITION METHOD,
THE ANGLES SHALL BE
MEASURED
2 TIMES
POLAR DISTANCE OF
OBSERVATION FROM JUNE
22 TO DECEMBER 22,
DISTANCE IS THE NPD
TAKEN FROM THE
ALMANAC AND THE
TOTAL DIFFERENCE
ADDED
(CORRECTION)
IS
POLAR DISTANCE OF
OBSERVATION FROM
DECEMBER 22 TO JUNE
22, DISTANCE IS THE NPD
TAKEN FROM THE
ALMANAC AND THE
TOTAL DIFFERENCE
SUBTRACTED
(CORRECTION)
IS
IN AFTERNOON
OBSERVATION, WHEN THE
MARK OBSERVED IS ON
THE NORTHEAST AND ON
THE RIGHT SIDE OF THE
SUN, THE TRUE AZIMUTH
OF THE LINE (STATION
OCCUPIED TO MARK) IS.
A+360-(OBSERVED HORIZONTAL ANGLE)
IN STELLAR
OBSERVATION THE
REFRACTION IS
ALWAYS TO BE.
SUBTRACTED
FROM JUNE 22 TO
DECEMBER 22, THE
NORTH POLAR
DISTANCE OF THE SUM
INCREASES
FROM DECEMBER 22
TO JUNE 22, THE
NORTH POLAR
DISTANCE OF THE SUM
DECREASES
IN PRIMARY CONTROL
TRIANGULATION, THE
CHECK BASE NOT TO
EXCEED
1:20,000
IN TERTIARY CONTROL
TRIANGULATION, THE
CHECK BASE NOT TO
EXCEED
1:5,000
UNLESS OTHERWISE
REQUIRED IN THE
AUTHORITY OR ORDER
FOR SURVEY, THE
TOPOGRAPHIC SURVEY
OF TOWN SITE BE
PLOTTED ON A SCALE
1:2,000
IN A SECTIONAL
CADASTRAL MAPS
SCALE 1:1000, THE
NORTHWEST (NW)
SECTION OF THE
SECTIONAL
CADASTRAL MAPS
SCALE SECTION
1:2000
1-A IS THE
IN A SECTIONAL
CADASTRAL MAPS
SCALE 1:2000, THE
NORTHEAST (NE)
SECTION OF THE
SECTIONAL
CADASTRAL MAPS
SCALE SECTION
1:2000
1-B IS THE
IN A SECTIONAL
CADASTRAL MAPS
SCALE 1:1000, THE
SOUTHEAST (SE)
SECTION OF THE
SECTIONAL MAPS
SCALE 1:2000 IS THE
SECTION 1-C
IN A SECTIONAL
CADASTRAL MAP
SCALE 1:1000, THE
SOUTHEAST (SW)
SECTION OF THE
SECTIONAL MAPS
SCALE 1:2000 IS THE
SECTION 1-D
IN A SECTIONAL
CADASTRAL SCALE
1:2000 THE
NORTHEAST (NE)
SECTION OF THE
STAND CADASTRAL IS
THE
SECTION 2
IN A LOCATION MAPS
1:2000, THE
SOUTHEAST (SE)
SECTION OF THE
STANDARD
CADASTRAL MAP IS
THE
SECTION 3
IN A SECTIONAL
CADASTRAL MAPS,
SCALE 1:2000, THE
SOUTHWEST (SW)
SECTION OF THE
STANDARD
CADASTRAL MAP IS
THE 4
SECTION
POLARIS IS AT
WESTERN
ELONGATION, WHEN
THE HORIZONTAL
ANGLE IS
MINIMUM
POLARIS AT LOWER
CULMINATION WHEN
THE VERTICAL ANGLE
IS
MINIMUM
POLARIS IS AT UPPER
CULMINATION, WHEN
THE VERTICAL ANGLE
IS
MAXIMUM
POLARIS IS AT
EASTERN
ELONGATION, WHEN
THE HORIZONTAL
ANGLE IS
MAXIMUM
FIGURE ADJUSTMENT,
THE SUM OF THE
INTERIOR ANGLES OF A
PLANE RECTILINEAR IS
EQUAL TO NUMBER OF
SIDES OF FIGURE MINUS
0
2 TIMES 180 IS THE
GEOMETRIC CONDITION
IN FIGURE
ADJUSTMENT, THEY IN
ANY TRIANGLE THE
SINES OF THE ANGLES
ARE PROPORTIONAL
TO THE LENGTHS OF
THE SIDES OPPOSITE
IS CONDITION
TRIGONOMETRIC
INTEGRATED SOCIAL
FORESTRY MAP SHALL
BE DRAWN IN
MATERIALS OF A
UNIFORM SIZE
54 X 54 CENTIMETERS
54 X 54 CENTIMETERS
PROJECT CONTROL
MAP SHALL BE
PREPARED AT ANY
APPROPRIATE SCALE
THAT WILL ALLOW THE
PLOTTING OF ENTIRE
MUNICIPALITY IN A
MARGINAL LINES 50FILM
X50 CENTIMETERS
DRAFTING
WITH
IT IS A BED OR
CHANNEL THROUGH
WHICH STAGNANT
DIRTY OR SALT WATER
FLOWS UNDER
INFLUENCE OF TIDES.
ESTERO
IS A NATURAL BED OR
CHANNEL THROUGH
WHICH WATER FLOWS
OR CONTINUOUSLY OR
INTERMITTENTLY
THROUGHOUT THE
YEAR
RIVER
IS A NATURAL STREAM
OF WATER LONGER
THAN A BROOK AND
OFTEN TRIBUTARY TO
A RIVER.
CREEK
IS A SMALL BODY OF
STANDING OR
STAGNANT WATER
POOL
IN PRIMARY CONTROL
TRIANGULATION, THE
PROBABLE ERROR NOT
TO EXCEED
1:40,000
IS A BODY OF
NATURALLY OR
ARTIFICIALLY
CONFINED AND
USUALLY SMALLER
THAN LAKE.
POND
IT IS A SHORE OR
BORDER OF LAND
ADJACENT TO THE SEA
OR OCEAN
SEACOAST
THE EASEMENT OF
COAST POLICE IS
WITHIN THE
SALVAGE ZONE
IT IS THE VERTICAL
DISTANCE FROM THE
STATION TO THE POINT
SIGHTED IN THE
TRANSIT IN MINING
SURVEY
HEIGHT OF POINT
A RELATIVELY THIN
DEPOSIT OF MINERAL
BETWEEN DEFINITE
BOUNDARIES
LODE
A PASSAGE DRIVEN
INTO THE ROCK CORE
AHEAD OF THE MAIN
EXCAVATION IN MINING
SURVEYING
HEADING
IN MINE SURVEYING, IT
IS AN INCLINED
PASSAGE DRIVEN IN A
PARTICULAR
DIRECTION.
DRIFT
A VERTICAL OR A
NEARLY VERTICAL
OPENING INTO A MINE
SHAFT
IN MINE SURVEYING,
THE VERTICAL ANGLE
BETWEEN THE PLANE
OF THE VEIN AND A
HORIZONTAL PLANE
MEASURED
PERPENDICULAR TO
THE STRIKE
DIP
THE LINE OF
INTERSECTION OF THE
VEIN WITH A
HORIZONTAL PLANE
ALSO THE DIRECTION
OF THAT LINE
EXPRESSED AS A
BEARING
STRIKE
IN ADJUSTMENT OF
SINGLE CHAIN OF
TRIANGLES, TO MAKE
THE SUM OF THE
ANGLES ABOUT EACH
POINT EQUALS 360
DEGREES
STATION ADJUSTMENT
SINGLE CHAIN
TRIANGLES, TO MAKE
THE SUM OF THE
THREE ANGLES IN
EACH TRIANGLE
EQUAL 180 DEGREES,
PLUS SPHERICAL
FIGURE ADJUSTMENT
A PLANE TANGENT TO
A LEVEL SURFACE TO A
LEVEL SURFACE
HORIZONTAL PLANE
A PLANE OF WHICH A
VERTICAL LINES IS AN
ELEMENTS
VERTICAL PLANE
BECAUSE THE
APPARENT PATH OF
THE SUN IS INCLINED
TO THE EQUATOR, IT
CONTINUALLY
CHANGES DISTANCE
NORTH POLAR
CONVERGENCY
CORRECTION SHALL
BE ADDED TO THE
AZIMUTH FOR POINTS
WEST OF CENTRAL MERIDIAN
CONVERGENCY
CORRECTION SHALL
BE SUBTRACTED TO
THE ASTRONOMICAL
AZIMUTH FOR POINTS
EAST OF CENTRAL MERIDIAN
HEREIN LISTED
METHODS OF
LEVELING, WHICH IS
THE FASTER?
BAROMETRIC
IT IS A VERTICAL
DISTANCE TO
POINTS OR OBJECT
ABOVE THE EARTHS
SURFACE
ALTITUDE
THE VERTICAL
DISTANCE ABOVE A
GIVEN DATUM OF AN
AIRCRAFT IN FLIGHT
OR DURING
SPECIFIED PORTION
OF
A
FLIGHT
FLIGHT ALTITUDE
IT IS THE ANGLE
FORMED BY THE
PLUMB LINE AND
THE PLANE OF THE
EQUATOR IN
ASTRONOMICAL
OBSERVATION
ASTRONOMICAL ALTITUDE
THE TRIANGLE
FORMED BY THE
SUN, ZENITH AND
NORTH CELESTIAL
POLE IN THE
CELESTIAL SPHERE
ASTRONOMICAL TRIANGLE
LOCAL TIME
THE ANGULAR
DISTANCE FORMED BY
INTERSECTION OF THE
CELESTIAL EQUATOR
AND CELESTIAL
MERIDIAN OF
OBSERVER TO THE
ZENITH
LATITUDE
OF THE OBSERVER
A VERTICAL DISTANCE
ABOVE THE DATUM OF
POINT OR OBJECT ON
THE EARTH SURFACE
ELEVATION
A VERTICAL DISTANCE
ABOVE THE DATUM OF
POINT OR OBJECT ON
THE EARTH SURFACE
ELEVATION
A ROD COMMONLY
USED IN LEVELLING
AND A TARGET AND
SELF-READING ROD
PHILADELPHIA ROD
THE VERTICAL
SECTION OF THE LINE
OF SURVEY SHOWING
ELEVATIONS
PROFILE
A DEGREE OF
COMMONLY WITH A
STANDARD
PRECISION
IN A DEGREE
REFINEMENT IN THE
PERFORMANCE OF AN
OPERATION OR IN THE
STATEMENT OF RESULT
ACCURACY
A STEREOSCOPIC
INSTRUMENT FOR
MEASURING PARALLAX
STEREOCOMPARATOR
A MECHANICAL DEVICE
OR DEVICES USED TO
FACILITATE SEEING AS
IN THREE DIMENSIONS
IN PHOTOGRAMMETRY
STEREOSCOPE
A PHOTOGRAPH TAKEN
WITH THE CAMERA
AXIS DIRECTED
INTENTIONALLY
BETWEEN
HORIZONTAL AND
VERTICAL
OBLIQUE PHOTOGRAPH
AN ASSEMBLAGE OF
SEPARATE
PHOTOGRAPHED
MOSAIC
IN PHOTOGRAMMETRY,
THE DISTANCE FROM
THE NEGATIVE TO THE
LENS OF CAMERA
FOCAL LENGTH
THE OPERATION OF
MEASURING
DIFFERENCE IN
ELEVATION
LEVELLING
A CURVED SURFACE
EVERY ELEMENT OF
WHICH IS NORMAL TO
THE PLUMB LINE
LEVEL SURFACE
A TRANSIT STATION,
OR POINT OVER WHICH
THE TRANSIT IS SET
WITH A TRACK IN THE
TOP MARKING THE
POINT
HUB
THE VERTICAL
DISTANCE FROM
STATION OCCUPIED TO
THE HORIZONTAL AXIS
OF THE TRANSIT IN
MINE SURVEY
HEIGHT OF INSTRUMENT
IN PRIMARY CONTROL,
HORIZONTAL
DISTANCE MEASURED
SHALL BE READ AND
RECORDED
REAR CHAIRMAN
IN AGRICULTURAL AREAS,
THE POSITION OF THE
CORNERS OF THE EARLIER
SURVEY SHALL BE ADOPTED
WHEN THE POSITION OF A
CORNER OF LATTER SURVEY
AND THE NEW SURVEY AS
DETERMINE DIFFER BY NO
MORE THAN
30 CENTIMETERS
A TOPOGRAPHIC SURVEY ON
THE AREAS RESERVE FOR
TOWN SITE SHALL BE MADE
AFTER THE BOUNDARY
SURVEY. UNLESS OTHERWISE
REQUIRED IN THE
AUTHORITY OR ORDER FOR
SURVEY, THE CONTOUR
SHALL BE LOCATED AT
2 METERS INTERVAL
THE DIFFERENCE OF
MAXIMUM AND MINIMUM
ELEVATION 99 METERS
BELOW, THE CONTOUR
SHALL SUIT THE
TOPOGRAPHIC
CONDITIONS OF THE
AREAS, CONTOUR
5 METERS
STREAMS, SHALL BE
EXCLUDE FROM THE
BOUNDARIES OF THE
PROPERTY UNDERGOING
SURVEY, THROUGH
WHICH WATER FLOWS
CONTINUOUSLY HAVING
WIDTH OF
LESS THAN 5 METERS
STREAM, SHALL BE
EXCLUDED FROM THE
BOUNDARIES OF THE
PROPERTY
UNDERGOING SURVEY,
HAVING NATURAL BED
OR CHANNEL
5 METERS OR MORE WIDTH
LANDS BORDERING
THE SEAS, GULF, BAYS
OR PORTS ARE
SUBJECT TO EASEMENT
OF COASTAL POLICE
FROM THE SHORELINE
LANDWARD OF
5 METERS WIDE
LANDS BORDERING
THE SEAS, GULF,
BAYS OR PORTS ARE
SUBJECT TO
EASEMENT OF
SALVAGE ZONE OF
20 METERS WIDE
PROVIDES , THAT
STARTING FROM THE
BANKS OF EACH SIDE OF
ANY RIVER OR STREAM
SHALL BE DEMARCATED
AND PRESERVE AS
PERMANENT
40 METERSAWIDE
TIMBERLAND,
STRIP OF
IN A MINERAL LAND
SURVEYS, IF THE
DIFFERENCE OF MAXIMUM
AND MINIMUM ELEVATION IS
100 METERS AND ABOVE,
THE CONTOURS SHALL SUIT
THE TOPOGRAPHIC
CONDITIONS OF THE AREAS,
CONTOUR INTERVAL IS
10 METERS WIDE
STREAMS THROUGH
WHICH WATER
FLOWS
CONTINUOUSLY
SHALL BE EXCLUDED
FROM THE LOT IF
THE
WIDTH
IS
LESS THAN 5 METERS
IN PRIMARY CONTROL
LINE MEASUREMENT, THE
STEEL TAPE SHALL BE
SUPPORTED, TO MINIMIZE
SAGGING, THROUGHOUT
ITS ENTIRE LENGTH AT
EVERY
25 METERS
LOCATION
MONUMENTS SHALL BE
ESTABLISH BY PAIR,
AND THE DISTANCE
BETWEEN A PAIR OF
MONUMENTS SHALL
NOT BE LESS THAN
100 METERS
IN HOUSING
SUBDIVISIONS THE
MAXIMUM LENGTH
OF A BLOCK SHALL
NOT BE MORE THAN
400 METERS
DISTANCE BETWEEN
SECONDARY
TRAVERSE STATION
SHALL NOT BE LESS
THAN
100 METERS
DISTANCE BETWEEN
PRIMARY TRAVERSE
STATION SHALL NOT
BE LESS THAN
100 METERS
BLOCK BOUNDARY OF
HOUSING SUBDIVISION
SHALL BE MARKED WITH
PERMANENT CONCRETE
MONUMENTS AND THE
LENGTH SHALL BE
PREFERABLY
250 METERS
IN MINERAL SURVEY,
THE DISTANCE
BETWEEN LOCATION
POST SHALL NOT
EXCEED
300 METERS
IN PRIMARY CONTROL
TRAVERSE, THE LINEAR
ERROR OF CLOSURE
NOT TO EXCEED
THE PRODUCT OF THE PERIMETER OF THE
CONTROL MULTIPLIED BY 0.00001
IN SECONDARY
CONTROL TRAVERSE,
THE LINEAR ERROR OF
CLOSURE NOT TO
EXCEED
THE PRODUCT OF THE PERIMETER OF THE
CONTROL MULTIPLIED BY 0.00002
IN TERTIARY CONTROL
TRAVERSE, THE
LINEAR ERROR OF
CLOSURE NOT TO
EXCEED
THE PRODUCT OF THE PERIMETER OF THE
CONTROL MULTIPLIED BY 0.00005
IN A REQUIRED SERIES
OF ASTRONOMICAL
OBSERVATIONS FOR
SECONDARY CONTROL
TRAVERSE, THE
ALLOWABLE PROBABLE
ERROR SHALL NOT
EXCEED
10 SECONDS OF ARC
IN ASTRONOMICAL
OBSERVATION FOR AZIMUTH
IN SECONDARY CONTROL,
THE PROBABLE ERROR (P.E)
OF THE ARITHMETIC MEAN
OF TWO SETS IN SERIES OF
OBSERVATION SHALL NOT
EXCEED
10 SECONDS OF ARC
IN ASTRONOMICAL
OBSERVATION OF AZIMUTH
IN TERTIARY CONTROL, THE
PROBABLE ERROR (P.E) OF
ARITHMETIC MEAN OF TWO
SETS IN A SERIES OF
OBSERVATIONS SHALL NOT
EXCEED
15 SECONDS OF ARC
MUNICIPALITY BASE
MAPS SHALL
COMPRISE AREAS
WITHIN SPHEROIDAL
QUADRANGLE OF
15 OR ARC IS LATITUDE & 10 OF ARC IN
LONGITUDE
THE ASTRONOMICAL
AZIMUTH DETERMINE
AT THE PRIMARY
CONTROL LINE SHALL
BE CORRECTED FOR
CONVERGENCY OF
MERIDIAN AND SHALL
20 OF ARC WITH CARRIED
GRID AZIMUTH OF
BE
THE LINE
IN TERTIARY CONTROL
CADASTRAL PROJECT THE
TRAVERSE MUST START AND
CLOSE IN A PRIMARY OR
SECONDARY CONTROL AND
THE INSTRUMENT
ORIENTATION AND CLOSING
READING TO THE NEAREST
30 OF ARC
IN TERTIARY CONTROL OF
CADASTRAL PROJECT
THE INSTRUMENT SHALL
BE ORIENTED IN A
PRIMARY OR SECONDARY
TRAVERSE LINES OF THE
PROJECT TO THE
NEAREST
30 OF ARC
IN TERTIARY CONTROL,
AZIMUTH SHALL BE READ
FROM THE INSTRUMENT
TO THE NEAREST ONE
MINUTE OF ARC EXCEPT
AT CLOSING LINE WHERE
AZIMUTH BE READ TO
THE NEAREST
30 OF ARC
THE ASTRONOMICAL
AZIMUTHS DETERMINED
AT SECONDARY STATIONS
AFTER CORRECTION FOR
CONVERGENCY SHALL
CONFIRM WITH CARRIED
AZIMUTH TO
WITHIN 30 OF ARC
THE ASTRONOMICAL
AZIMUTHS DETERMINED
AT SECONDARY STATIONS
AFTER CORRECTION FOR
CONVERGENCY SHALL
CONFIRM WITH CARRIED
AZIMUTH TO
1 OF ARC
IN A PORTION OF PROJECT
WHERE THE LAND IS
DIVIDED INTO LARGE LOTS
LIE HACIENDA, RESERVATION
AND SIMILAR TRACTS, THE
SECONDARY TRAVERSE
SHALL BE ESTABLISHED AND
INTERVALS OF
NOT EXCEEDING 3 OF ARC
IN PRIMARY CONTROL,
TRIANGULATION
CLOSURE NOT TO
EXCEED BASE
MEASUREMENT BY
5
IN SECONDARY
CONTROL, TRIANGLE
CLOSURE NOT TO
EXCEED BASE
MEASUREMENT BY
10
IN TERTIARY CONTROL,
TRIANGLE CLOSURE
NOT EXCEED BASE
MEASUREMENT BY
30
LOCATION
MONUMENTS SHALL BE
ESTABLISHED BY PAIRS
AND THE DISTANCE
BETWEEN A PAIR OF
MONUMENTS
PREFERABLE BE
ABOUT.
300
METERS
IN EXECUTING CLOSED
CIRCUIT TRAVERSE IN
ISOLATED SURVEY, NO
TRAVERSE LINE SHALL
EXCEED.
500 METERS
THE LENGTH OF
SECONDARY CONTROL
LINES SHALL NOT
EXCEED.
500 METERS
WHEREVER POSSIBLE,
THE LENGTH OF ONE
OF THE SIDES OF THE
RECTANGULAR TRACT
FOR LEASE LAID OUT
ON THE GROUND
SHALL NOT EXCEED.
500 METERS
DISTANCE BETWEEN
SECONDARY TRAVERSE
STATIONS SHALL NOT
EXCEED.
500 METERS
IN ISOLATED SURVEY,
BOUNDARY LINES OF
PARCEL SHALL BE
MARKED WITH
CONCRETE
MONUMENTS AT
INTERVAL NOT TO
EXCEED.
500 METERS
DISTANCE BETWEEN
PRIMARY TRAVERSE
STATION SHALL NOT
BE MORE THAN.
1,000 METERS
IN SECONDARY
CONTROL
TRIANGULATION,
STATION DISTANCE
SHOULD NOT EXCEED.
1,000 METERS
IN ISOLATED SURVEY
REFERENCE POINTS
FROM THE
DESIGNATED CORNER
1 OF THE TRACT
SHALL BE WITHIN BUT
NOT BEYOND.
2 KILOMETERS
IN PRIMARY CONTROL
TRIANGULATION,
STATION DISTANCE
SHOULD NOT EXCEED.
3 KILOMETERS
LOCATION
MONUMENTS SHALL BE
ESTABLISHED BY
PAIRS, AND PAIRS OF
LOCATION
MONUMENTS SHALL BE
SET AT AN INTERVAL
OF.
5-6 KILOMETERS
IN TERTIARY CONTROL,
THE WEIGHT OF STEEL
TAPE PER METER DOES
NOT EXCEED.
FIFTEEN THOUSANDTHS KILOGRAMS
NUMBER OF STATION
BETWEEN AZIMUTH
CHECKS IN PRIMARY
CONTROL TRAVERSE, BY
ASTRONOMICAL
OBSERVATION, NOT TO
EXCEED.
25 STATIONS
NUMBER OF STATION
BETWEEN AZIMUTH
CHECKS IN SECONDARY
CONTROL TRAVERSE BY
ASTRONOMICAL
OBSERVATION, NOT TO
EXCEED.
35 STATIONS
NUMBERS OF STATION
BETWEEN AZIMUTH
CHECKS IN TERTIARY
CONTROL TRAVERSE, BY
ASTRONOMICAL
OBSERVATION SHALL NOT
EXCEED.
50 STATIONS
GRID AZIMUTH
DERIVED FROM
ESTABLISHED
GEODETIC CONTROL
POINTS WITHIN OR
NEAR THE CADASTRAL
PROJECT OF AT LEAST.
2
WHEN SCHEME OF
QUADRILATERALS IN
USED IN A CONTROL,
THERE MUST BE A
MEASURED BASE LINE
OF AT LEAST.
2
IN ISOLATED SURVEY
PLAN, THE
HORIZONTAL AND
VERTICAL CENTER
LINES COORDINATE
SHALL BE VISIBLE BY.
5
FOR SECONDARY
CONTROL TRAVERSE,
HOW MANY
ASTRONOMICAL
OBSERVATION BE
TAKEN IN EVERY
DESIRED STATION.
AT LEAST TWO SERIES OF TWO SETS EACH
IN TERTIARY CONTROL
TRAVERSE ERROR
AFTER AZIMUTH
ADJUSTMENT, SHOULD
NOT BE GREATER
THAN
ONE PART IS TO FIVE THOUSAND
IN PRIMARY CONTROL
MEASUREMENT, THE
SUM OF THE INTERIOR
ANGLES OF A
POLYGON SHALL BE
EQUAL TO
NUMBERS OF LINES IN THE CIRCUIT LESS 2
MULTIPLIES 180 DEGREES
PROVINCIAL BASE
MAPS SHALL
COMPRISE AREAS
WITHIN SPHEROIDAL
QUADRANGLES OF
1 DEGREE & 30 MINUTES OF LAT & 1 DEGREE
LONG
IN PRIMARY CONTROL
TRIANGULATION,
STATIONS ANGULAR
OBSERVATION BE
MADE WITH ONE SEC
THEODOLITE
AT LEAST 2
THE QUALITY OF
CONTROL TO BE USED
FOR LAND SURVEY
PROJECT WITH AN
AREA 1,500 HECTARE
IS
SECONDARY CONTROL
IN SECONDARY
CONTROL TRAVERSE,
THE AZIMUTH ERROR
OF CLOSURE DIVIDED
BY 15, THE QUOTIENT
REPRESENTS THE
NUMBER OF 15 UNITS
IN DIFFERENTIAL
LEVELING, THE
ELEVATION OF A
TURNING POINT IS
SUBTRACTING THE F.S. FRO H.I.
POLARIS OBSERVATION
AT UPPER
CULMINATION, THE
LATITUDE OF PLACE OF
OBSERVATION EQUALS
MAXIMUM VERTICAL ANGLE MINUS POLARIS
POLAR DISTANCE
TERM USED TO
DESIGNATE THAT ADJUST
VALUE WHICH,
ACCORDING TO
PRINCIPLE OF LEAST
SQUARE, HAS MORE
CHANCES BEING
CORRECT THAN HAS ANY
MOST PROBABLE VALUE
A TRAVERSE WHICH
CLOSES TO THE POINT
OF ORIGIN IS KNOWN
AS
CIRCUIT TRAVERSE
TRAVERSE STARTING
FROM A STATION AND
CLOSING INTO
ANOTHER STATION OF
THE SAME OR
ANOTHER TRAVERSE
SHALL BE KNOWN AS
LOOP TRAVERSE
REGISTERED LAND
WHERE IS A CERTAIN
PERCENTAGE OF THE
LAND AREA ARE
ALLOCATED FOR STREET,
PASSAGEWAY, OR OPEN
SPACES IS DELINEATED
COMPLEX
SUBDIVISION
ON THE
PLAN.
IT IS A MAP SHOWING
CONVENTIONAL
SYMBOLS THE
CULTURE, DRAINAGE,
RELIEF, AND
VEGETATION FEATURES
OF PARTS OF THE
EARTHS
SURFACE.
TOPOGRAPHIC
MAP
IT IS A MAP SHOWING
EXTENT, OWNERSHIP,
VALUE OF LAND.
CADASTRAL MAP
A MAP PREPARED IN A
SCALE 1:4000 IN
WHICH HOMESTEAD,
PSU AND OTHER
ISOLATED SURVEY ARE
PLOTTED WITHIN SAME
MUNICIPALITY.
PROJECTION MAP
OF FIGURE CAN BE
EVALUATED
QUANTITATIVELY IN
TERMS OF FACTOR R
BASED ON THE THEORY
OF PROBABILITY, LOWER
THE VALUE OF R, THE
ISFIGURE
STRONGER
OF FIGURE CAN BE
EVALUATED
QUANTITATIVELY IN
TERMS OF FACTOR R
BASED ON THE THEORY
OF PROBABILITY, HIGHER
THE VALUE OF R, THE
IS WEAKER
FIGURE
IN TRIANGULATION
FOR SECONDARY
CONTROL, THE
PROBABLE ERROR
NO TO EXCEED
AS REQUIRED
STANDARD ACCURACY
FOR CONVENTIONAL
SURVEYING INSTRUMENT.
IN TRIANGULATION FOR
PRIMARY CONTROL, THE
PROBABLE ERROR NO TO
EXCEED
1:40,000
IN TRIANGULATION
FOR PRIMARY
CONTROL, THE
CHECK ON BASE
NOT TO EXCEED
1:20,000
IN TRIANGULATION
FOR SECONDARY
CONTROL, THE
CHECK ON BASE
NOT TO EXCEED
1:10,000
IN TRIANGULATION
FOR TERTIARY
CONTROL, THE
CHECK ON BASE
NOT TO EXCEED
1:50,000
POLARIS IS AT
EASTERN
ELONGATION, WHEN
THE HORIZONTAL
ANGLE IS.
MAXIMUM
THE TRIANGLE
FORMED BY THE
SUN, ZENITH AND
NORTH CELESTIAL
POLE IN THE
CELESTIAL SPHERE
IS
CALLED.
ASTRONOMICAL TRIANGLE
NPD CORRECTION IN
AFTERNOON SOLAR
OBSERVATION IN THE
HOURLY VARIATION
MULTIPLIED BY THE
DIFFERENCE IN HOURS
FROM 2:00 P. M., IS
THE TOTAL DIFFERENCE
FROM DECEMBER 22
TO JUNE 22, THE
NORTH POLAR
DISTANCE OF THE
SUN
DECREASE
THE ASTRONOMICAL
AZIMUTH DETERMINED
AT SECONDARY STATIONS
AFTER CORRECTION FOR
CONVERGENCY SHALL
CONFORM WITH THE
CARRIED AZIMUTH TO.
WITHIN 30 OF ARC
BECAUSE THE
APPARENT PATH OF
THE SUN IS INCLINED
TO THE EQUATOR, IT
CONTINUALLY
CHANGES DISTANCE
FROM THE
NORTH POLAR
CONVERGENCY
CORRECTION SHALL
BE ADDED TO THE
ASTRONOMICAL
AZIMUTH FOR.
POINTS NORTH OF CENTRAL MERIDIAN
CONVERGENCY
CORRECTION SHALL
BE SUBTRACTED TO
THE ASTRONOMICAL
AZIMUTH FOR
POINTS.
EAST OF CENTRAL MERIDIAN
IT IS THE ANGULAR
DISTANCE FORMED BY
INTERSECTION OF THE
CELESTIAL EQUATOR
AND CELESTIAL
MERIDIAN OF
OBSERVER TO THE
ZENITH.
LATITUDE
OF THE OBSERVER
POLAR DISTANCE OF
OBSERVATION FROM JUNE
22 TO DECEMBER 22,
DISTANCE IS THE NPD
TAKEN FROM THE
ALMANAC AND THE
TOTAL DIFFERENCE
ADDED
(CORRECTION)
IS.
POLARIS OBSERVATION
AT EASTERN
ELONGATION, WHEN
THE MARK IS TO THE
RIGHT OF THE STAR,
THE TRUE AZIMUTH
STATION TO MARK
180+BEARING OF
STAR+(360-OBSERVED HA)
EQUAL
POLARIS OBSERVATION
AT UPPER
CULMINATION, WHEN
THE MARK IS ON THE
RIGHT SIDE OF STAR,
THE TRUE AZIMUTH
STATION OCCUPIED TO
MARK EQUALHA)
180+(360-OBSERVED
A METHOD OF CONTOUR
LINE INTERPOLATION IN
WHICH THE LINE IS
MENTALLY TRACED BY
MOVING CLOCKWISE
OBSERVING THAT IT WILL
JOIN ONLY ALL POINTS OF
SAME ELEVATION UNTIL IT
CLOSES UPON ITSELF BY.
INSPECTION METHOD
IT IS A METHOD OF
DETERMINING
DIFFERENCE IN
ELEVATION
INDIRECTLY
TRIGONOMETRIC LEVELING
IN DIFFERENTIAL
LEVELING, THE
VERTICAL DISTANCE
FROM DATUM TO
THE LINE OF SIGHT
OF THE TELESCOPE
IS.
HEIGHT OF INSTRUMENT
A CIRCULAR CURVE,
IT IS A STRAIGHT
LINE DISTANCE
CONNECTING THE
POINT OF
CURVATURE TO THE
POINT
OF
LONG CHORD
A DOUBLE RODDED
LINE OF LEVEL
MEANS A LINE RUN
USING TWO
TURNING POINT FOR
EACH.
SET-UP OF THE INSTRUMENT
THE VERTICAL
DISTANCE ABOVE OR
BELOW MEANS SEA
LEVEL OR ANY
OTHER SELECTED.
DATUM ELEVATION
IN LEVELING, A
DOUBLE RODDED
LINE OF LEVEL
MEANS A LINE IS
USING HIGH AND LOW TURNING POINT FOR
EACH SET UP OF INSTRUMENTS
IT IS A MAP
SHOWING EXTENTS,
OWNERSHIP, VALUE
OF THE LAND.
CADASTRAL MAP
IT IS A
STEREOSCOPIC
INSTRUMENTS FOR
MEASURING
PARALLAX.
STEREOCOMPARATOR
IT IS THE DISPLACEMENT
OF THE IMAGE OF
OBJECTS WITH RESPECT
TO OTHER OBJECTS DUE
TO DIFFERENCE IN THEIR
RESPECTIVE DISTANCES
FROM THE OBSERVER.
PARALLAX
THE SECONDARY
CONTROL STATION
SHALL BE DEFINED
BY CONCRETE
MONUMENTS OF
NOT LESS THAN
10 CM DIAMETER AND 50 CM IN LENGTH
AS DETERMINED BY THE
DISTRICT ENGINEER ON
PORTION OF LOTS
CLAIMED AS PRIVATE
PROPERTY BUT FALLING
WITHIN THE RIGHT-OFWAY OF ROAD, IT SHALL
BE
NUMBERED AS A SEPARATE LOT
A ROD COMMONLY
USED IN LEVELING,
AND A TARGET AND
SELF READING ROD,
IS CALLED.
PHILADELPHIA ROD
THE DIFFERENCE
BETWEEN EACH OF
INDIVIDUAL
MEASUREMENT AND
THE MEAN VALUE OF
MEASUREMENTS IS.
DEVIATION
CROSS-HAIR OF THE
TELESCOPE APPEARS
TO MOVE WITH
RESPECT TO THE
OBJECT BEING
SIGHTED IS DUE TO
EFFECT OF PARALLAX
THE.
THE VERNIER OF AN
ENGINEERS TRANSIT
BE SET TO 0O0000
READING, WITH THE
USE OF.
UPPER CLAMP TANGENT SCREW
ERRORS DUE TO A
COMBINATION OF
CAUSES BEYOND THE
ABILITY OF THE
OBSERVER TO CONTROL
AND FOR WHICH IT IS
IMPOSSIBLE TO MAKE
CORRECTION.
ACCIDENTAL ERROR
IN FIGURE
ADJUSTMENT, THAT IN
ANY TRIANGLE THE
SINES OF THE ANGLES
ARE PROPORTIONAL
TO THE LENGTHS OF
THE SIDES OPPOSITE
IS. CONDITION
TRIGONOMETRIC
IS A MATHEMATICAL TERM
USED TO DESIGNATE THAT
ADJUSTED VALUE, WHICH,
ACCORDING TO PRINCIPLE
OF LEAST SQUARES, HAS
MORE CHANCES OF BEING
CORRECT THAN HAS ANY
OTHER.
MOST PROBABLE VALUE
THE ESTABLISHMENT
OF THE PERMANENT
FOREST LAND AND
PROTECTED AREA
BOUNDARIES BY
CONDUCTING ACTUAL
GROUND SURVEY.
DELINEATION SURVEY
IT IS THE STANDARD
GENERIC TERM FOR
SATELLITE NAVIGATION
SYSTEMS THAT PROVIDED
AUTONOMOUS GEOSPATIAL POSITIONING
WITH GLOBAL
COVERAGE.
GNSS
PROPERTIES OWNED BY
THE STATE BUT ARE NOT
INTENDED FOR PUBLIC
USE, PUBLIC SERVICE OR
FOR THE DEVELOPMENT
OF NATIONAL WEALTH.
PATRIMONIAL PROPERTY
IS A TWODIMENSIONAL MAP
SHOWING THE METES
AND BOUNDS OF A
SURVEYED PARCEL OF
LAND AND OTHER
PERTINENT
INFORMATION.
SURVEY PLAN
THE COLLECTIVE
DOCUMENTS SUBMITTED
BY A GEODETIC
ENGINEER AS A RESULT
OF THE SURVEY
CONDUCTED AND OTHER
RELEVANT DOCUMENTS
AS MAY BE REQUIRED.
SURVEY RETURNS
THE NUMBER
EXCLUSIVELY
ASSIGNED TO A LAND
PARCEL IN REFERENCE
TO ITS PHYSICAL
SPATIAL POSITION IN
THE LAND
INFORMATION
MAP.
UNIQUE PARCEL IDENTIFIER
TO DETERMINE THE
HORIZONTAL AND
VERTICAL POSITION OF
POINTS WHICH WILL
FORM PART OF GEODETIC
NETWORK OR PROJECT
CONTROLS OVER AN
CONTROL
SURVEYS
AREA.
COVERING EXTENSIVE
AREAS WHICH TAKE INTO
ACCOUNT THE CURVATURE
AND GEOID-SPHEROID
SHAPE OF THE EARTH AT
SEA LEVEL FOR THE
PURPOSE OF ESTABLISHING
BASIC NETWORK OF
REFERENCE
POINT.
GEODETIC
CONTROL
SURVEYS