Sectoral Overview
LAND SECTOR
Study
Area
Item
Area
Population
GRDP
Metro
Manila
Sq Km
620
% of Total Phils.
0.2
In Thousands
11,856
% of Total Phils.
12.8
1.79
PhP Billion
(2011: current)
% of Total Phils.
% by
Sector
Primary
3,460
35.8
0.5
Secondary
17.0
Tertiary
82.5
Transport
Modes
within the
Study Area
LRT Line 2
UV Express
National
Roads of
Metro Manila
AVIATION SECTOR
41 Community Airports
Consistently Delayed
Flights
Overcrowded Airport
Terminals
Rappler
Photo by Edwin Llobrera
NAIA Terminal 3 | October 2, 2015
RAIL SECTOR
Existing
Rail
Network in
Metro
Manila
14
Weekday
Ridership
Total
LRVs/Trains
Operational
Line Length
Line 1
450,000
139 / 40
62%
21km
Line 2
217,000
72 / 18
56%
14km
Line 3
437,000
73 / 24
71%
16km
PNR
65,0000
6 Trains
N.A.
28km
MRT 3 Webpage
August 9, 2015
Jam-Packed
Trains
Breakdowns = Unsafe
Passenger Conditions
The 5 Elements
Article Posted: June 24, 2015
CHALLENGES AND
SOLUTIONS PER
SECTOR
Department of Transportation
LAND SECTOR
20
Land Sector
Challenge # 1: Land Traffic Congestion
Solutions:
Use of alternate roads in private
subdivisions *
Single authority to formulate and enforce
uniform traffic rules
Fast track procurement process
No TRO and Injunction issued by lower
courts
Acquisition of right of way (ROW)
21
Land Transportation
Franchising and Regulatory
Board (LTFRB)
Land Transportation
Office (LTO)
Challenge # 1: Severe backlog of Drivers
License and License Plates
Solution: Fast track procurement through
direct contracting of:
6.7 million Drivers License cards
5.4 million License Plates
vehicle plates making machine
Department of Transportation
AIR SECTOR
24
MIAA
Challenge # 1: Operate an airport infrastructure
that is:
safe and secure;
compliant with local and ICAO, FAA, EU,
and other international airport agencies
standards; and
able to maintain its Category 1 status.
25
MIAA
Solutions:
Immediately procure, through direct
contracting, security systems to protect
against threats to passengers, aircraft,
and airport facility.
26
MIAA
Solutions:
Immediately adopt a reorganization plan
to create plantilla positions for scanners
and x-ray operators.
27
MIAA
Challenge # 2 : Maximize runway utilization
Solution:
Procurement, through direct contracting,
of civil works improvement (e.g., RET,
taxiway,
aprons,
etc.),
and
aeronautical /navigational equipment
28
MIAA
Challenge # 3 : Inadequate communication
systems and computerization of processes.
Solution:
Immediately procure, through direct
contracting, communication systems
and applicable software and computer
system.
29
CAAP
Challenge # 1: Accelerate transfer of General
Aviation to Sangley Airport to decongest
NAIA.
Solution:
Special powers to enable DOTr/CAAP to
carry out the immediate transfer of
General Aviation to Sangley.
30
CAAP
Challenge # 2 : Sustaining ICAO, FAA
Category 1 Status, and EU Safety and
security ratings.
Solution:
Immediate procurement, through direct
contracting, of CCTV, training of personnel to
meet international standards.
31
CAAP
Challenge # 3 : Extending night operations of
provincial airports.
Solution:
Immediate procurement, through direct
contracting, of equipment to make
provincial airports night rated, in order to
decongest day operations of Manila .
32
CAB
Challenge: Overconcentration of flights in
Manila airport (e.g., 87% of all Philippine air
traffic are serviced in Manila).
Solution:
Special powers to authorize CAB to
redistribute air traffic to Clark, Davao,
and other developmental international
gateways.
33
Department of Transportation
RAIL SECTOR
34
Rail Sector
Challenge:
Lack of spare parts (capital spares) on
all 3 lines,
Line 1 & Line 2, 40-45% of rolling stock
non operational under government
operation and maintenance (O&M)
Spare parts problem especially true for
original
equipment
manufacturers
(OEMs)
Cannot procure long-term supply (5-10
years) as purchases are disallowed by
COA
Rail Sector
Plan:
Special powers to procure long-term
supply contracts with OEMs
After the 2-year Special Powers, secure
PPP partners on each line who have
ability to enter into long-term contracts
with OEMs
36
Rail Sector
Challenge:
Procurement processes are disrupted
by injunctive writs and restraining orders
Plan:
Special powers requested that would
limit the issuance of TROs against traffic
and transportation projects.
Rail Sector
Challenge:
ROW procurement
Plan:
Special powers requested that would
allow long term procurement of ROW
needed for present and future rail lines.