BASICS OF EARTHING
Contents
1.
2.
3.
4.
5.
6.
7.
TERMINOLOGIES
DISADVANTAGES OF UNEARTHED SYSTEM
TYPES OF EARTHING
BASIC PRINCIPLE
& METHODS OF SYSTEM EARTHING
SCHEME ADOPTED IN PROCESS PLANT FOR SYSTEM
EARTHING
EARTHING CONDUCTORS SCHEDULE FOR SUBSTATIONS OF
PROCESS PLANT
RECOMMENDED PRACTICES AS PER IEC 60364 AND IS 3043
Terminologies
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
CLASS I EQUIPMENT
CLASS II EQUIPMENT
EARTH ELECTRODE
EARTH ELECTRODE RESISTANCE
EARTH FAULT LOOP IMPEDANCE
EARTH LEAKAGE CURRENT
PROTECTIVE CONDUCTOR
NEUTRAL CONDUCTOR
PEN CONDUCTOR
RESIDUAL CURRENT DEVICE
RESIDUAL OPERATING CURRENT
TOUCH VOLTAGE
STEP VOLTAGE
EARTH GRID
EARTH MAT
Disadvantages of Unearthed
System
1.
2.
3.
4.
Types of
Earthing
1.
2.
3.
4.
SYSTEM EARTHING
EQUIPMENT EARTHING
REFERENCE OR SIGNAL EARTHING
STATIC AND LIGHTNING PROTECTION EARTHIN
Equipment Earthing
The connection between non current carrying
1.
2.
3.
1.
2.
3.
2.
3.
4.
R
Y
B
N
PE
2.
3.
4.
5.
R
Y
B
N
PE
2.
3.
R
Y
B
N
PE
10
11
VOLTAGE
NEUTRAL
EARTHING
Solidly earthed
Solidly earthed
SECONDARY POWER
DISTRIBUTION
EMERGENCY POWER
GENERATION
LV POWER DISTRIBUTION
Solidly earthed
12
Earthing Conductors
Schedule
EQUIPMENT
BODY EARTH
CONNECTION
INSTRUMENT/CLEA
N EARTH
Transformer
33/6.6kV
Neutral Point To
NER
75X10mm, at 4
places
Single Core XLPE
cable of relevant
size
Not Required
75X10mm,with 2
pit connections
75X10mm (2
No's)
Not Required
Marshalling Box
Not Required
Not Required
13
BODY EARTH
CONNECTION
INSTRUMENT/CLEA
N EARTH
Transformer 6.6/0.433kV
75X10mm,at 4 places
Not required
Neutral
75X10mm,with 2 pit
connections
Not required
Bus-Duct
1cX70 sq mm
Not required
1cX35 sq mm
Not required
14
BODY EARTH
CONNECTION
INSTRUMENT/
CLEAN EARTH
6.6kV Switchgear
PCC,MCC,Battery
charger,VFD,main
earth grid & riser
conductor
75X10mm
1cX16 mm sq only
for PCC,MCC VFD
50X6mm
15
1.
2.
16
17
2.
3.
E56888
TT system
R
Y
B
N
PE
Rn
Ru
2.
E56890
TN system
R
Y
B
N
PE
E56890
TN-S system
R
Y
B
N
PE
).
E56892
TN-C system
R
Y
B
PEN
E56892
TN-CS System
R
Y
B
N
PE
22
TN system examples
OVERHEAD LINE
POINT OF SUPPLY
L1
L2
L3
PE
SOURCE
EARTH
INSTALLATION
EARTH
EXPOSED
CONDUCTIVE
PARTS ARE
CONNECTED TO
PE
CONSUMER
EQUIPMENT
23
TN system examples
TN-S System is adopted for LV System Earthing.
Refer following Fig. for an explanatory
schematic of a TN-S system.
SOURCE
L1
L2
L3
N
PE
EXPOSED CONDUCTIVE
PARTS ARE CONNECTED
TO PE
CONSUMER
EQUIPMENT
SOURCE EARTH
CONSUMER EQUIPMENT
24
2.
3.
25
2.
3.
4.
26
PE and EB system
Although the PE-system and the EB-system have
distinctly different functions (namely fault clearing and
Equipotential), these systems are permanently interconnected.
Thus, in addition to its function the EB-system will affect earth
loop impedance and fault clearing. Similarly, in addition to its
function, the PE-system will provide supplementary connections
between exposed conductive parts and the earth grid, via the
neutral point of the source of supply.
27
2.
3.
E56894
IT system
L1
L2
L3
N
PE
TN-C
TN-S
TT
IT
I fault
High
High
Low
Very low
Protection
of people
SCPD
SCPD
RCD
No problem
Fire
Protection
Forbidden
Not
recommended
Recommended
with RCD
Recommended
with RCD
Cost
Most
economical
Expensive
economical
than TN
TT and IT Systems naturally manage the Fire Risk by limiting the fault current
ELECTROMAGANETIC
COMPATIBILITY
IEC 60364
Earthing
System
TN-C
EM
Forbidden
disturbances PE and
Neutral are
together
(PEN)
TN-S
TT
IT
Good
But be careful
avoiding PE
and Neutral to
be in contacts
Very good
No problems
even if Neutral
and PE are in
contacts
Very good
No problems
even if Neutral
and PE are in
contacts
l
Thank You
31