AUGUST 2016
Prepared by:
Noorulhuda Binti Ismail
Table of Content
1. Investigation Team Members
2. Problem Statement
3. Sequence of Events
4. Process Sequence of Event
5. Facts and Findings
6. Root Cause Failure Analysis (5 WHYs)
7. Recommendation Actions
Team Leader
Nooratikah Bt Shaari
Facilitator
RMU Representative
Team Member
Engineer Area 3
M Safwan B Atan
Team Member
Assistance Operation
Engineer Area 6
Team Member
Assistance Operation
Engineer Area 6
M Fadzlee B Samsubaha
Resource Person
Bazurim B Ibrahim
Resource Person
TTS
Nurulain Bt Baharuddin
Resource Person
Jawatan penuh
Isma'il B A Halim
Resource Person
Assistance Operation
Engineer Area 6
Naimah Bt Azizan
Resource Person
Inspection Area 6
Problem Statement
P-1809B V3SS Pump reported mechanical seal leak badly leaked
externally at 60 drops/minute and pressure at accumulator also
dropped on Jun 2015. Replace mechanical seal and maintenance
cost incurred USD 20,000.00 in 2015.
Last maintenance in August 2014
Motor
overhaul &
alignment
by Elect
vendor
7.9.14
Rpt m/seal
leak(after
m/seal
flushing)
leak 60
m/seal
D/min.
leak 30
sealpot
D/min.
pressure= sealpot
10.77 vs pressure=
13
12.15 vs
kg/cm2 13 kg/cm2
20.5.15 21.5.15
Mech6
to do
seal
flushin
g
Leak 60
d/min
(100N)
Opr
topup
1x/shift.
26.5.1
5
M/seal badly
leak 60 d/m
and coupling
membrane
damage.
Sealpot
pressure
9.85 kg/cm2
Highest vib
at P2H =
15.14
mm/sec
RMS.
28.5.15
Motor
solo
run
Internal
inspection
, replace
m.seal,
coupling
membranc
e
8.6.15
2.6.15
Switch to A
and CRG to
replace
coupling
membrane
and replace
m/seal
Running
with
good
conditio
n.
Highest
vib at
P1H =
1.41
mm/sec
RMS
Motor
Overha
ul
9.6.15
16.6.15
No changes in
flow and pump
vibration
Fact
Findings
References
Info
Detail
Info
Detail
CBM
Flowserve re
port
CRG report
PI system
Info
PI system
8
P1809B
m.seal
leak
Failure
Mechanis
m
High
vibration
at P2H =
15.14
mm/sec
Transactio
nal Active
Cause
Membrane
broken
Transactional
Active Cause
Misalignment
Transactio
nal Active
Cause
piping stress at
suction piping
(offset: +20mm; Gap: +16mm)
Inadequate
coupling
installation
after motor
maintenance
Underlying
Cause
Lack of
QA/QC during
construction
Lack of final
QC/QC after
motor
maintenance
Lack of final
QC/QC after
motor
maintenance
What will
happen if.
Potential outcome
Conclusion
Contributory
(Root
Cause)
Dominant
Cause
(Root
Cause)
Recommendations
N
o
1
Underlying cause
Lack of QA/QC
during
construction
Lack of final
QC/QC after
motor
maintenance
Recommendation Action
Action By
Date line
PESD
Next TA
Electrical
/Rotary
Immediate
11
Thank You
12
M.Seal Plan
API Plan 02
API Plan 53M
13
Datasheet P-1809A/B
14
15
14.5.1
5
16
Flow trendingP-1809B
17
Min flow
=79.9m3/h
r
Running
flow=170
m3/hr
BEP =
344.9
m3/hr
70-120% from
BEP
18
19