Agenda
Test objects and various high voltage tests, General safety and
precautions, Test objects standard requirement, Evaluation of test
results
ABB Ltd - 3
10-03-2003 - Users Guide
Training Module/CTR
ABB Ltd - 4
INPT-R&D
Topics
Test procedures
Uncertainty
INPT-R&D
ABB Ltd - 5
Standards
INPT-R&D
Failure of insulation under electrical stress, in which the discharge completely bridges the
insulation under test, reducing the voltage between the electrodes practically to zero
Disruptive discharge occurs over the surface of a dielectric in a gaseous or liquid medium
Puncture
ABB Ltd - 6
Flashover
A discharge that does not completely bridge the insulation between electrodes, the voltage
between the electrodes does not drop to zero
Sparkover
Definitions
INPT-R&D
External insulation
Non-self-restoring insulation
ABB Ltd - 7
Self-restoring insulation
Is the air insulation and the exposed surfaces of the solid insulation of the
equipment
Internal insulation
Definitions
Is the insulation which losses its insulating properties, or does not recover them
completely, after a disruptive discharge caused by the application of test voltage
INPT-R&D
Impulses
ABB Ltd - 8
Definitions
INPT-R&D
ABB Ltd - 9
INPT-R&D
ABB Ltd - 10
ABB Ltd - 11
INPT-R&D
Dry tests
ABB Ltd - 12
INPT-R&D
Wet tests
The voltage value and various configuration to be tested is as per relevant product
standard
Test specimen should be wetted for minimum15 minutes before start of testing
The test object may be cleaned with a surface-active detergent. This is to be removed
before beginning of wetting
INPT-R&D
Temperature to
20 C
Pressure bo
101.3 kPa
ABB Ltd - 13
Atmospheric conditions
INPT-R&D
Correction factors
b 273 t o
bo 273 t
ABB Ltd - 14
INPT-R&D
Correction factors
k2 kw
h
ABB Ltd - 15
INPT-R&D
Correction factors
ABB Ltd - 16
INPT-R&D
For installation at an altitude higher than 1 000 m, the insulation level of external
insulation is determined by multiplying the insulation withstand voltages required
at the service location by a factor K a in accordance with figure (see next slide)
Ka = e m(H - 1 000)/8150
where
ABB Ltd - 17
ABB Ltd - 18
INPT-R&D
ABB Ltd - 19
INPT-R&D
Test procedures
Uncertainty
INPT-R&D
ABB Ltd - 20
Impulse voltage
High dc voltage
ABB Ltd - 21
INPT-R&D
Alternating voltages
For test durations upto 60 s the measured value of test voltage shall
be maintained within 1%
INPT-R&D
ABB Ltd - 22
Cascaded transformer
ABB Ltd - 23
INPT-R&D
INPT-R&D
They are designed to withstand frequent short circuits when the test object
fails or experiences flashover
ABB Ltd - 24
On external self restoring insulation 0.1 A for dry tests and 0.5 A for wet tests. 1 A
may be necessary for wet test on large specimens.
For artificial pollution test this value should be upto 15 A. Also R/X 0.1
ABB Ltd - 25
INPT-R&D
Though power station equipment are three phase, single phase testing
transformer is normally used for testing
Features;
They differ from power transformer in the sense that they have higher short
circuit impedance to withstand frequent short circuit
ABB Ltd - 26
INPT-R&D
General arrangement
ABB Ltd - 27
INPT-R&D
Tank type
ABB Ltd - 28
INPT-R&D
Tank type
ABB Ltd - 29
INPT-R&D
Tank type
ABB Ltd - 30
INPT-R&D
Tank type
ABB Ltd - 31
INPT-R&D
Cylindrical type
ABB Ltd - 32
INPT-R&D
Cylindrical type
INPT-R&D
Transportation and assembly are easy as the whole unit is divided into smaller
units
ABB Ltd - 33
Cascaded Transformer
The units are enclosed by large size metal rings to prevent corona
ABB Ltd - 34
INPT-R&D
Block diagram
INPT-R&D
V1
ABB Ltd - 35
V1
3V2
V1
2V2
V2
ABB Ltd - 36
INPT-R&D
Cascaded transformer
In the same unit second unit excitation winding is available with the
same no of turns as the primary of the first unit
ABB Ltd - 37
INPT-R&D
Cascaded transformer
ABB Ltd - 38
INPT-R&D
Cascaded transformer
INPT-R&D
ABB Ltd - 39
By varying circuit parameters or the supply frequency, the circuit can be tuned to
achieve a voltage considerably greater than that of the source and with a
substantially sinusoidal shape
This circuit is useful when testing objects such as cables, capacitors in which the
leakage currents on the external insulation are very small in comparison with the
capacitive currents through the test object
INPT-R&D
ABB Ltd - 40
=QV
increases.
Vo
INPT-R&D
ABB Ltd - 41
Advantages
ABB Ltd - 42
INPT-R&D
Transient over voltages due to lightning and switching surges causes fast
rising voltage on transmission tower and hence on electrical equipments
On the basis of the front and tail time following classification is made
INPT-R&D
ABB Ltd - 43
ABB Ltd - 44
INPT-R&D
INPT-R&D
ABB Ltd - 45
V0
C1
Rs
Rp
C1
C2
G
Front resistor
Tail resistor
Generator capacitor
Load capacitance
Sphere gap
Rp
V0 V(t) -
C2
V (t)
Rectified voltage
Impulse voltage
INPT-R&D
Uo charging voltage
Cs impulse capacitor
f sphere gap
Re discharging resistor
RL charging resistor
RD damping resistor
ABB Ltd - 46
RL>>Re>>RD
INPT-R&D
ABB Ltd - 47
U Peak value
( 30%)
T1 Front time
Peak value
O1 Virtual origin
1.2/50 s
( 3%)
INPT-R&D
ABB Ltd - 48
The collapse of the voltage can occur on the front, at the peak, or on
the tail
INPT-R&D
ABB Ltd - 49
INPT-R&D
ABB Ltd - 50
Peak voltage U
Front time T1
ABB Ltd - 51
INPT-R&D
250/2500 s
Nomenclature
U Peak value
( 20%)
Tp Time to peak
Peak value
( 3%)
INPT-R&D
ABB Ltd - 52
Impulse current
Exponential
Tolerances
Peak value
10%
10%
INPT-R&D
Rectangular
ABB Ltd - 53
Impulse current
Defined by the duration of the peak Td and the total duration Tt
Tolerances
Peak value
+20% - 0%
Duration of peak
+20% - 0%
ABB Ltd - 54
INPT-R&D
Test procedures
Uncertainty
INPT-R&D
ABB Ltd - 55
Introduction to HV Measurement
Moving iron and moving coil type instruments are used with series
resistance (multiplier) for low voltage measurement
avoid flashover
INPT-R&D
Measuring system
ABB Ltd - 56
HV measuring system
Complete set of devices suitable for performing a high-voltage or
impulse-current measurement is called as measuring system
Converting device
Transmission device
Recording device
INPT-R&D
ABB Ltd - 57
Classification HV Measurement
Direct method
Examples;
Electrostatic voltmeter
Indirect method
10 kV Electrostatic voltmeter
Examples;
Series resistance
Micro ammeter
Voltage transformer
Potential dividers
Oscilloscopes , HV probe
HV probe
INPT-R&D
Sphere gaps
ABB Ltd - 58
gap
ABB Ltd - 59
INPT-R&D
Sphere gaps
INPT-R&D
The density of the gas (generally air) and humidity affects the spark-over
voltage for a given gap setting
The spark over voltage for a given gap setting under STP must be
multiplied by the correction factor to obtain the actual spark-over voltage
ABB Ltd - 60
Effect of atmosphere
INPT-R&D
ABB Ltd - 61
ABB Ltd - 62
INPT-R&D
Humidity
Dust particle
ABB Ltd - 63
INPT-R&D
INPT-R&D
ABB Ltd - 64
Sphere gaps
Advantage
The sphere gap method of measuring high voltage is the most reliable
and is used as the standard for calibration purposes
Disadvantage
It can not be used for the voltage having rise time of lesser than 0.5 s
ABB Ltd - 65
INPT-R&D
INPT-R&D
ABB Ltd - 66
Uo = 2 + 0,534 d
This equation is valid for gap distances d between 250 mm and 2 500
mm and for a humidity range h/ between 1 g/m 3 and 13 g/m3
ABB Ltd - 67
INPT-R&D
INPT-R&D
Advantage
ABB Ltd - 68
Disadvantages
When the above method is used for alternating voltages, there would
be the effect of the distributed capacitances
The two resistors are set by heat dissipation and heat transfer outside
ABB Ltd - 69
INPT-R&D
INPT-R&D
Voltage/potential transformer
Potential transformer
ABB Ltd - 70
INPT-R&D
ABB Ltd - 71
INPT-R&D
Advantages
ABB Ltd - 72
Disadvantages
ABB Ltd - 73
INPT-R&D
INPT-R&D
Resistive dividers
ABB Ltd - 74
Types of Dividers
Capacitance dividers
Mixed dividers
ABB Ltd - 75
INPT-R&D
INPT-R&D
ABB Ltd - 76
Advantages
Disadvantages
INPT-R&D
ABB Ltd - 77
VC2 = C1/(C1+C2) V
1000 kV divider
INPT-R&D
Advantage
ABB Ltd - 78
Disadvantage
Pure capacitive dividers are sensitive to input voltage with short rise
time
It forms series resonance circuit with lead inductance in the low voltage
arms
INPT-R&D
ABB Ltd - 79
1 MV
3 MV
3.5 MV
ABB Ltd - 80
INPT-R&D
Advantages
ABB Ltd - 81
INPT-R&D
Disadvantage
ABB Ltd - 82
INPT-R&D
Rise time and response time are important so that measuring circuit
will transfer the same voltage to be measured
INPT-R&D
ABB Ltd - 83
Selection of Dividers
INPT-R&D
Methods of measurements
Method of
measurement
DC
Mean
AC
peak
rms.
Sphere gap
peak
waveform
X
X
Voltage transformer
X
X
Capacitive divider
Mixed divider
Resistive divider
Oscilloscope/wave
analyzer
ABB Ltd - 84
waveform
Peak voltmeter
Electrostatic voltmeter
peak
Impulse
INPT-R&D
ABB Ltd - 85
Accuracy requirements
Alternating voltage
Harmonics < 10 %
Direct voltage
INPT-R&D
Accuracy requirements
ABB Ltd - 86
ABB Ltd - 87
INPT-R&D
Test procedures
Uncertainty
INPT-R&D
ABB Ltd - 88
The rate of rise should be 2% per second above 75% of the estimated final test
voltage
The test voltage should be maintained for the specified time and then reduced
INPT-R&D
ABB Ltd - 89
The value of the test voltage reached at the instant of the disruptive
discharge shall be recorded
The value of the test voltage reached just prior to the disruptive
discharge should be recorded
The requirements of the test are generally satisfied if this voltage is not
higher than the assured disruptive discharge voltage on each one of a
specified number of voltage applications
INPT-R&D
Procedure A
ABB Ltd - 90
3 impulses of specified shape and polarity at the rated withstand voltage level
are applied to the test object
Procedure B
15 impulses of the specified shape and polarity at the withstand level are applied
to the test object
Test object passes if not more than two disruptive discharge occurs in the self
restoring part of the insulation and no indication of failure in the non-restoring
insulation
INPT-R&D
ABB Ltd - 91
Procedure C
If more than one disruptive discharge occurs, test object failed the
test
INPT-R&D
For self restoring insulation the 10% impulse disruptive discharge voltage U10 is
evaluated by using statistical test procedures
Direct evaluation of U10 or U50 and indirect evaluation of U10 can be done.
In direct method number of test voltage are applied to find 10% disruptive
discharge voltage
In indirect method
ABB Ltd - 92
up-and-down method
Test object is passed if U10 is not less than the specified impulse withstand
voltage
ABB Ltd - 93
INPT-R&D
ABB Ltd - 94
INPT-R&D
ABB Ltd - 95
INPT-R&D
Test procedures
Uncertainty
INPT-R&D
ABB Ltd - 96
Concept of Uncertainty
Error
Uncertainty
This concept says that any quantity is known to exist within a definite
interval (nominal value and a range around that) with a given degree of
confidence.
INPT-R&D
ABB Ltd - 97
Definitions
INPT-R&D
ABB Ltd - 98
Components of uncertainty
Systematic components
Random components
INPT-R&D
ABB Ltd - 99
Old way
INPT-R&D
New way
Here 0.5 V is the total uncertainty in estimating the voltage value. And
there is 95% confidence that the measurement lies within the range 9.5
to 10.5 V