VENUE: CHENNAI
DATE:
10/24/16
INTRODUCTION
Plant capacity and type
SIGNALS ARCHITECTURE
FIELD
INSTRUMEN
TS
JUNCTIO
NBOX
MARSHALLI
NG
CABINET
SYSTEM
CABINET
NETWORK
STATION
OPERATING
STATION
ENGG
STATION
10/24/16
SEQUAN
CE
EVENT
STATION
MANKIND IS IN PURSUIT OF TRUTH,
LET US WORK TOWARDS THIS
PRINTING
SERVER
ETHERNET SIGNALS
CONNECTIIVITY
SEVER -1
CONTROLLER- 1
CONTROLLER- 2
ETHERNET
SWITCH -1
OS- 4
CONTROLLER- 3
OS- 5
OS- 1
ETHERNET
SWITCH -2
OS- 6
OS -2
OS-3
OS- 7
PRINTINTER
ASPECT SERVER- 1
10/24/16
BC # 1A
GUARD
PUMP-1
RO
CLEANING
PUMP #1
PUMP # 1
SERVICE
SERVICE AIR
WATER PUMP COMPRESSOR
#1
-1
BURNER
SYSTEMS
(INST)
PUMP # 1
#1
OVE FAN #1
GSVC FAN # 1
MB
BLOWER # 2
DCS COSOLE
PANEL(INST)
BC # 2
SOX & NOX
SYSTEM (INST)
10/24/16
ESP
DENSPHASE
VESSEL #
(1-5)
CEP # 1
SWAS SYSTEM
PRIMARY
INSTRUNENTS
SCREEN # 1A
10/24/16
AIR DRYER # 1
RO HIGH
PRESSURE
PUMP # 1
MGF FEED
PUMP # 1
SERVICE WATER
PUMP # 2
SAC FEED
PUMP # 1
DM TRANSFER
PUMP # 1
SLUDGE
TRANSFER
PUMP-1
SERVICE AIR
NEUTRALIZING UF BACKWASH
COMPRESSOR
PIT PUMP # 1
PUMP # 1
-2
DEGASSER
BC-1A VIBRO
BLOWER # 1 FEEDER # 1,2
UF FAST
FLUSHING
PUMP # 1
HRSCC FEED
PUMP#1
DE FAN &
RAV # 2
SECONDARY
SCREEN # 1
BC # 3
SWAS SYSTEM
(INST)
10/24/16
HOTWELL
PUMP # 2
FILLING
PUMP-1
BLOWER (1-3)
PUMP # 2
BLOWER # 2
CT FAN-2
FLY ASH
CONDITIONER
(1-3)
OVE FAN #2
GSVC FAN #
2
FLY ASH
INST. AIR
ACW PUMP #
OIL
CONDITIONER( COMPRESSOR
2
CENTRIFUGE
1-3)
#2
BC-1B VIBRO
OBMS - A & B
FEEDER # 3,4
APH
SYSTEM-1,2
(INST)
10/24/16
AIR DRYER-2
RO HIGH
PRESSURE
PUMP # 2
SECONDARY
SCREEN # 2
PUMP-2
PUMP # 3
PUMP # 1,2
PUMP # 2
CEP # 2
MGF FEED
PUMP # 2
GUARD PUMP2
LDO
UNLOADING
PUMP # 1,2
DEGASSER
BLOWER # 2
BORE WELL
DCF 304 ,
BC # 4 WITH
CRUSHER
#
1
MB
BLOWER-2
SUMP
305
TIPPER TRALLEY
PUMP 1, 2,3
DM PLANT
SOX & NOX
VALVES,
SYSTEM (INST)
TRANSMITTER
10/24/16
PRESSURE
GAUGE
CT FAN-3
SLUDGE
TRANSFER-2
PRESSURE
GAUGE
SERVICE AIR
COMPRESSOR
-3
UF FAST
FLUSHING
PUMP # 2
CRUSHER # 2
BELT WEIGH
SYSTEM(INST)
10/24/16
#3
PUMP # 3
MGF FEED
PUMP # 3
RO HIGH
PRESSURE
PUMP # 3
ACW
PUMP # 3
GAUGE
10
10/24/16
MONTH
PM-PLAN
PMACTUAL
CBM
BDM
APR14
NIL
NIL
35
NIL
MAY14
NIL
NIL
33
JUNE14
NIL
NIL
35
NIL
JULY14
45
15
32
NIL
AUG14
45
18
28
NIL
SEP14
45
15
36
OCT14
45
24
30
NIL
NOV14
45
28
35
DEC14
45
35
38
JAN15
45
18
16
29
FEB15
45
28
30
NIL
MAR15
45
32
13
11
11
TRIP
DESCRIPTION
DURA
TION
REMEDIAL ACTION
TOOK
APR14
(4
Trips)
NIL
NIL
NIL
NIL
1.
BOILER &
TURBINE GOT
TRIP.
3.35
hrs
MAY14
(3
Trips)
JUN14
(0 Trip)
10/24/16
2.
BOILER &
TURBINE GOT
TRIP.
3. BOILER &
TURBINE GOT
TRIP.
2.45
Hrs
UPS - 1 & 2
SYNCHRONISED
NIL
NIL
NIL
RTD TERMINATION
TIGHTNESS WAS
CHECKED
SMPS CARD
REPLACED
UPS - 2
CHECKED
NIL
12
JULY14
(1Trips)
TRIP
DESCRIPTION
1. BOILER &
TURBINE GOT
TRIP.
DURA
TION
TURBINE SHAFT
VIBRATION
19Hrs
HIGH(FRONT
JOURNAL BEARING)
NIL
NIL
REMEDIAL ACTION
TOOK
AUG14 (0
Trips)
NIL
SEP14 (O
Trips)
NIL
NIL
NIL
NIL
OCT 14 (0
Trip)
NIL
NIL
NIL
NIL
NOV 14 (0
Trip)
NIL
NIL
NIL
NIL
DEC 14 (0
Trip)
NIL
NIL
NIL
NIL
JAN 15 (0
Trip)
NIL
NIL
NIL
NIL
10/24/16
FEB
15 (1
Trip)
IN PURSUIT
OF TRUTH,
BOILER
TRIPPED
1. BOILERMANKIND
&LET US IS
WORK TOWARDS THIS
DUE TO LOOP SEAL
TURBINE GOT
NIL
13
RTD termination
ACTIVITIES
1. SA to Furnace
Damper
HV-1092
2. Oil level switch removed
APR14 then, inserting tube hole dia
was increased then reaffixed.
3. Loader -2 calibration
work done
1. UPS- 1 & 2 SMPS &
MAY14 IGBT card was failure,
so replaced
JUNE
14
10/24/16
Service air
compressor -1 Oil
separator, OIL -60
litters was replaced
DURATION
(date & time)
REMARKS
4 hrs
Positioner was
calibrated due to
moisture in air line
4 hrs
4 hrs
Loader -2 cross
checked to Weigh
bridge
18.30 hrs
8 hrs
14
MONTH
1. DeaeratorBleed
steam control valve
packing inner dia was
reduced 2 mm after
taken on line
JULY14
2.UPS - 2 card alarm
was came
3. Service air compressor
-1Loading and Un loading
cylinder to be serviced
1. Dryer 1 tower- 1
AUG14 & 2 valve inspection
work done
SEP14 1. ID fan -1
Temperature scanner
power card replaced
10/24/16
8 hrs
Valve strauckup
problem
4 hrs
4 hrs
5.30 hrs
3 hrs
Normal
15
MONTH
16
MONTH
Loading and
unloading power
cylinder connecting
rod was replaced for
IAC -2 after trail
DEC1
taken on line
4
SOX , NOX sample
inlet SOV was
replaced
CHP - A stream inter
lock was checked
UPS -1 IGBT card
was replaced and
JAN taken on line, UPS - 2
15
was checked
Swas sample cooler
cleaning work done
10/24/16
5 hrs
CONNECTING PIN
5 hrs
SOV 01 NO
6 hrs
UPS -1 IGBT 01
NO
5 hrs
17
MONTH
HP heater Level
5 hrs
transmitter impulse
line was modified
Cep recirculation
5 hrs
Flow transmitter
impulse line was
modified
ACC fan - 8 vibration
3 hrs
Vibration Switch 01
switch sensor
JAN15 sensitivity problem,
so replaced new
one.
AIR dryer- 1 & 2 By
8hrs
pass Isolation valve
was modified
Boiler main steam
2hrs
stop valve limit
switch adjustment
MANKIND IS IN PURSUIT OF TRUTH,
work done
10/24/16
LET US WORK TOWARDS THIS
18
MONT
H
19
CHALLENGES
ACTION TOOK
PRESENT
STATUS
1.Boiler Bottom
temperature
element and
thermo well
Thermo well
was damaged
Boiler bottom
side thermo
well was
modified
Working
normal
2. Boiler top
temperature
element and
thermo well
Thermo well
was damaged
3. ACC FAN - 4
Float was
OIL level switch jammed
10/24/16
Failure less
Capacitance
type level
switch to be
changed
20
10/24/16
21
REPORTS SYSTEM
DAILY
WEEKLY
MONTHLY
HISTORY
REPORT
SL.NO REPORT REPORT
CARD
1.COMPRESS
1.
NIL
PM
BOILER,
CHECKLIST TURBINE,
ORWrite various kinds
of BOP,CHP,
report you
CHECKLIST
DMPLANT
generate
such
as
daily,
weekly,
2. UPS
monthly,
history
card,
CMMS,
etc
CHECKLIS
T
3. SWAS
CHECKLIS
T
4. CEMS
SYSTEM
10/24/16
22
NEW IMPLEMENTATIONS/SYSTEMS
ADAPTED IN THE YEAR
1. Boiler bed bottom thermo well
modification work done.
2. Guard pump -2 was taken DCS mode.
3.ACW header impulse line modification
work done
4.HP heater level transmitter impulse
line modification work done.
5.CEP recirculation Flow transmitter
impulse line modification work done.
10/24/16
23
NEW IMPLEMENTATIONS/SYSTEMS
ADAPTED IN THE YEAR
6. Air dryer bypass valve
modification work done.
7. Swas system wet and dry panel
was commissioning work done. PH,
Silica, Hydrazine, Conductivity,
Phosphate analyzer calibration work
done
10/24/16
24
OFI-PLANT
ACTION TOOK
PRESENT
STATUS
1.
Combustion
control to be
taken Auto
mode
Logic to be
check
Under progress
2.
EMRV to be
taken DCS
mode
Pressure sensor
calibration done
EMRV not
commissioned
3.
WHILE EB
FAILURE PLANT
COMES TO
HOME LOAD
10/24/16
UAT not
commissioned
25
10/24/16
26
10/24/16
27
SAFETY AT WORK
MONTH
INCIDENTS
REMEDIAL ACTION
TAKEN
APRIL14
NIL
NIL
MAY14
NIL
NIL
JUNE14
NIL
NIL
JULY14
NIL
NIL
AUG14
NIL
NIL
SEP 14
NIL
NIL
OCT14
NIL
NIL
NOV
NIL
NIL
DEC14
NIL
NIL
JAN14
NIL
NIL
FEB15
NIL
NIL
MAR15
NIL
NIL
10/24/16
28
TOPIC/S
GIVEN BY
NO.OF
PARTICIPANT
S
APR14
NIL
NIL
NIL
MAY14
NIL
NIL
NIL
JUNE14
NIL
NIL
NIL
JULY14
NIL
NIL
NIL
AUG14
NIL
NIL
NIL
SEP14
NIL
NIL
NIL
OCT14
NIL
NIL
NIL
NOV14
NIL
NIL
NIL
DEC14
NIL
NIL
NIL
JAN15
NIL
NIL
NIL
FEB15
NIL
NIL
NIL
MAR15
NIL
NIL
NIL
10/24/16
29
ORG.
CHART
ACTUAL
SHORT
EXCESS
C&I
INCHARGE
01
01
C&I
ENGINEER
04
04
SHIFT
TECHNCICA
N
04
04
HELPER
10/24/16
30
10/24/16
31
OFI-TEAM
TRAINING
CLASS TO BE
CONDUCTED.
SEMINAR CLASS
TO BE
CONDUCTED.
INTER
RELATIONSHIP
& DISCUSSION
DEVELOPMENT
WITH OTHER
SITE TECH
PERSON
10/24/16
ACTION TOOK
PRESENT
STATUS
32
OUR REQUIREMENTS
10/24/16
33
QUESTIONS?
10/24/16
34
THANK YOU
10/24/16