Yadgir JC

Network Overview

JC BOUNDARY

Confidential

NETWORK

Reliance Jio Infocomm Limited

Sites Scope
S.No
1
2
3

Scope Type
P1
RP1
IPCOLO
Grand Total

RFR
5
13
4
22

Inst. Done
2
6
2
10

RFE Pend
4
2

SO Released

3
3

S. No

Final SAP ID

Town Name

Urban / Rural

Priority

Cluster Name

I-KA-SHHU-ENB-6000

Doranahalli

Rural

RP1

KA-SHHU-0571

I-KA-SHHU-ENB-6001

Naikal

Rural

RP1

KA-SHHU-0561

I-KA-SHHU-ENB-6003

Shahapur

Urban

RP1

KA-SHHU-0202

I-KA-SHHU-ENB-6004

Shahapur

Urban

RP1

I-KA-SHHU-ENB-6005

Shahapur

Urban

I-KA-SHHU-ENB-6006

Sirwal

Rural

I-KA-SHHU-ENB-I001

Bhimarayanagudi

I-KA-SHOP-ENB-6003

I-KA-SHOP-ENB-6004

10

Total Scope
11
21
9
41
Type

Count

Rural

KA-SHHU-0202

Urban

16

RP1

KA-SHHU-0202

RP1

KA-SHHU-0572

GrandTotal

22

Urban

IP Colo

KA-SHHU-0202

Shorapur

Urban

RP1

KA-SHOP-0600

Shorapur

Urban

RP1

KA-SHOP-0600

I-KA-YDGR-ENB-0001

Yadgir

Urban

P1

KA-YDGR-0218

11

I-KA-YDGR-ENB-I001

Yadgir

Urban

IP Colo

KA-YDGR-0218

12

I-KA-YDGR-ENB-V001

Yadgir

Urban

IP Colo

KA-YDGR-0218

13

I-KA-YDGR-ENB-0004

Yadgir

Urban

P1

KA-YDGR-0218

14

I-KA-YDGR-ENB-I002

Yadgir

Urban

IP Colo

KA-YDGR-0218

15

I-KA-YDGR-ENB-0006

Yadgir

Urban

P1

KA-YDGR-0218

16

I-KA-YDGR-ENB-0007

Yadgir

Urban

P1

KA-YDGR-0218

17

I-KA-YDGR-ENB-6001

Hattikuni

Rural

RP1

KA-YDGR-0563

18

I-KA-YDGR-ENB-6006

Yadgir

Urban

RP1

KA-YDGR-0218

19

I-KA-YDGR-ENB-6007

Yadgir

Urban

RP1

KA-YDGR-0218

20

I-KA-YDGR-ENB-6008

Yadgir

Urban

RP1

KA-YDGR-0218

21

I-KA-YDGR-ENB-6009

Yaragol

Rural

RP1

KA-YDGR-0562

22

I-KA-YDGR-ENB-9011

Thangunda

Rural

P1

KA-YDGR-0384

Confidential

Reliance Jio Infocomm Limited

Integrated & On
Air Sites

Sites Not Integrated Status

Network

Installation Done
S. No

Final SAP ID

Town
Name

Rural /
Cluster
Priority
Urban
Name

I-KA-GOGI-ENB6000

Gugi

Rural

RP1

I-KA-GRMT-ENBW001

Gurmatkal

Urban

IPColo

KA-GRMT0417

I-KA-HTGD-ENB6000

Hattigudur

Rural

RP1

KA-HTGD0603

I-KA-SHHU-ENB6002

Sagar

Rural

RP1

I-KA-SHHU-ENB6008

Chamnal

Rural

I-KA-YDGR-ENBI003

Gurmatkal

I-KA-YDGR-ENB6002

I-KA-YDGR-ENB6005

9
10

Action Plan

Responsibility

EscalatedtoFiberandCMPteamtotakeuponPriority

Fibercore

lastMileconnectivityNotAvailabletosite

FeasiblepathsuggestedtoMWTeamTOCheckandRevert

Fiber/MW

FiberNotLaidfromNLDpointtoSite

EscalatedtoFiberandCMPteamtotakeuponPriority

Fibercore

KA-SHHUConnectingSiteNotReady.MWConnectedfromHTGD-6000
0602

EscalatedtoFiberandCMPteamtotakeuponPriority

Fibercore

RP1

KA-SHHU0601

ConnectingSiteNotReady.MWConnectedfromGOGI-6000

EscalatedtoFiberandCMPteamtotakeuponPriority

Fibercore

Urban

IPColo

KA-GRMT0417

lastMileconnectivityNotAvailabletosite

FeasiblepathsuggestedtoMWTeamTOCheckandRevert

Fiber/MW

Khanhalli

Rural

RP1

KA-YDGR0384

InfraIssueandPowerProblem.SMPSandEBnotavailable

DiscussedwithCMP.Abouttoclrby25th-May

CMP

Tumkur

Rural

RP1

KA-YDGR0384

Ownerobjectionforsite.RunningasrepeaterforYDGR-9011

SiteReplacementalreadyplanned

CMP

I-KA-YDGR-ENB- Bomshathal
9012
li

Rural

P1

KA-YDGRConnectingSiteNotReady.MWConnectedfromYDGR-6002
0384

DiscussedwithCMP.Abouttoclrby25th-May

CMP

I-KA-YDGR-ENBRampurhalli
9014

Rural

P1

KA-YDGR0562

MaterialRequestedandyettoArrive

CMP

Confidential

Remarks

KA-SHHUConnectingSiteNotReady.MWConnectedfromHTGD-6000
0202

SamsungMaterialthefted.NewMaterialRequired.

Reliance Jio Infocomm Limited

Sites Not Integrated Status

Network

SO Released
S. No

Final SAP ID

Town Name

Rural / Urban

Priority

Cluster Name

Remarks

Action Plan

Responsibility

I-KA-YDGR-ENB-9005

Badiyal

Rural

IPCOLO

YDGR-0680

Surveycompleted

SOReleased

SHQPlanningTeam

I-KA-YDGR-ENB-9007

Kudlur

Rural

IPCOLO

YDGR-0680

Surveycompleted

SOReleased

SHQPlanningTeam

I-KA-YDGR-ENB-9008

Malhar

Rural

IPCOLO

YDGR-0680

Surveycompleted

SOReleased

SHQPlanningTeam

RFE
S. No

Final SAP ID

Priority

Cluster Name

Remarks

I-KA-YDGR-ENB-6003

P1

KA-YDGR-0680

AcquisitionPending

I-KA-YDGR-ENB-6004

P1

KA-YDGR-0680

AcquisitionPending

I-KA-YDGR-ENB-9006

P1

KA-YDGR-0680

AcquisitionPending

I-KA-YDGR-ENB-9009

P1

KA-YDGR-0680

AcquisitionPending

I-KA-YDGR-ENB-9010

P1

KA-YDGR-0680

AcquisitionPending

I-KA-YDGR-ENB-9018

P1

KA-YDGR-0384

AcquisitionPending

Confidential

Reliance Jio Infocomm Limited

Sites Not
Integrated

CLOT (Cluster Optimization Test) Status

Network

CLOT Details
S.No Town Name

Cluster No

Cluster Type

No of Sites

Site IDs

KA-YDGR-0218

Large

10

YDGR-001,I001,VOO1,0004,I002,0006,0007,6006,6007,6008

KA-YDGR-0562

Small

YDGR-6009,9014

KA-YDGR-0563

SCFT

YDGR-6001

KA-YDGR-0680

Large

YDGR-6003,6004,9005,9006,9007,9008,9009,9010

KA-YDGR-0384

Small

YDGR-6002,6005,9011,9012,9018

KA-SHHU-0202

Large

SHHU-6003,6004,6005,I001,GOG-6000

KA-SHHU-0561

SCFT

SHHU-6001

KA-SHHU-0571

SCFT

SHHU-6000

KA-SHHU-0572

SCFT

SHHU-6006

10

KA-SHHU-0601

SCFT

SHHU-6008

11

KA-SHHU-0602

SCFT

SHHU-6002

1
2
3

YDGIR

SHAHAPUR

12

GURMATKAL

KA-GRMT-0417

Small

GRMT-W001,YDGR-I003

13

SHORAPUR

KA-YDGR-0600

Small

SHOP-6003,6004

KA-HTGD-0603

SCFT

HTGD-6000

14

HATTIGUDUR
Total
Confidential

41
Reliance Jio Infocomm Limited

CLOT (Cluster Optimization Test) Status

Network

CLOT Drive Test Status


Status
Pass

Large Cluster
2

Small Cluster
-

SCFT Cluster
4

1
3

1
3
4

3
7

Fail
NotAttempted
Total

Remarks
AverageDL-25Mbps/UL-5Mbps
PoorcoverageobservedAddl.siteandre-drive
reqd
SitesNotOnAir
14

CLOT w.r.t eNode-B


Availability
Cluster Type

eNode-B's OA

eNode-B's NOA

eNode-B's
reqd.

Large Cluster

14

SCFT Cluster

Small Cluster

19

Total

Note: OA-OnAir,NOA-NotOnAir

Confidential

Reliance Jio Infocomm Limited

New Sites Proposals and Recommendations


Network
19- Business Potential Areas are
highly recommended for eNode-B
availability on priority.

Recommendations
BusinessPotential
Covered
MustHave
NicetoHave
Grand Total

Coverag eNode-B
Poor
Small
e
Not Planned Coverag
RF
cell
Availabl Availabl But Not e site Survey availabl Grand
e
e
On Air Reqd
Done
e
Total

19

19
11
25
4
4
2
1
47
1
137

139
2
313

315
14
494
4
4
3
1
520

4- Locations identified poor coverage


and KPI effecting cells where Addl.
Site is Required.
1- Small cell recommended for
macro conversion which is highly
business potential area.
137- locations are recommended for
RF coverage where eNode-B not
available and population is >2500
Jio Pulse Updated

Confidential

Reliance Jio Infocomm Limited

ODSC / ISC / IBS Recommendations

Network

Proposed

Scope

Agreements
done

RFC

RFE 1

RFE 2

RFR

HOTO

College Wi-Fi

20

ISC & IBS

72

ODSC

Identified the locations where throughputs of DL <20Mbps and UL < 2Mbps.


Included Pilgrim and tourism areas.

Confidential

Reliance Jio Infocomm Limited

JC Network Statistics

Network

KPI Statistics based on SNP Info


KPI

Mar-16

APR-16

May-16 (week-3)

RCA

Actions Taken

NWAvailability

87.23%

92.14%

96.77%

2-SitesSectorandBanddownformore
thanonemonth

WithCMPsupport
ReplacedFaulty
hardwareandrestored

Accessibility

96.1%

98.9%

99.3%

Retainability

97.2%

97.9%

98.6%

Mobility

99.3%

99.2%

100%

During850installations,GSMantenna
werechangedandElectricaland
mechanicalTiltarenotchangedinto
original

DLAvg.

38.7Mbps

56.2Mbps

41.7Mbps

ULAvg.

6.4Mbps

8.1Mbps

9.1Mbps

Physicalauditdonefor
allsites,ReleasedUp
Tilt,Overshooting
electricalTilts
Reduced.Reduced
repeatedoutages
Worstcellanalysison
dailybasisand
correctionsinNW.

Action Plan

1- site is effecting NW availability which are


Down due to Samsung material theft.

Coordinated with CMP . New Material requested .

Confidential

Reliance Jio Infocomm Limited

10

Suggestions and Support Required


Network
Suggestions
S. No
1

2
3
4
5

Observations

Suggestions
Instructed vendors to be cautious and perform standard
Frequent reporting of Alarms during Insallations in sites and pre-check of all connections and Alarms
new installtions
while exit from site
Replaced damaged cables by laying new cable duct with CMP
support and suggested to lay cable ducts in new sites in remote
Repeated Ouragesin Monkeys
places to avoid outages and HW failure during Monsoon period
effected sites
even
Regular PM's need to be carried out in all sites by FT's and
No Maitenance of Hygiene and PM's maintain Hygiene to avoid HW failures, Outages and Alarm free
at Sites
which will Improve KPI's
eNode-B running with High
FT's to clean enode-B chillers on regular basis and reduce the
Temperatures
running Temp of eNode-B
Performing Worst analysis on daily basis and suggesting
KPI Worst cell Analysis
Necessary corrections and changes in NW.

Support Required
MinSpareslikecableties,Tapes,WhetherProofandtoolkitavailabilitywithJCTeamforAlarmclearanceandSiterestorations.
2-TestSIMsrequirementforPerformingtowndrives,ThroughputchecksandKPIMaintenance
SingleloginPlatformrequiredforNWtoolslike(LSMR,JCP,Citrix)andKPITrendAvailabilityatleastforlastthreemonthsinSNPTool.
Flexibletransportationreqd.forsitevisitanddriveoptimization.
Confidential

Reliance Jio Infocomm Limited

11

Thank You