Professional Documents
Culture Documents
NEERING
Danielle Yoong Li Ping
Chung Hui Ping
Ng Wei Lin
Chang Chow Tong
Lim Yun Xuan
Tan Jing Yi
Yang Hee Yan
Wong Kim Wan
Job Scope
Item
1
Member Name
Wong Kim Wan
Job Scope
Introduction and Purpose of VM study, compilation of
presentation slides
Executive Project Brief and Summary of Problem,
compilation of report
Application of VM techniques and tools (Function analysis,
5
6
Ng Wei Lin
Tan Jing Yi
study
A. Introduction
VALUE MANAGEMENT
Value management usually
integrates with reviews, workshops
and interviews to achieve the project
and clients requirements
Value planning is carried out at the
pre-construction stage to reach a
group decision regarding the
proposed design
Value engineering is carried out
during the construction stage to
study on the completed design or
PURPOSE
To make suitable adjustment to the
cost of the project without giving in
or sacrificing the function and
quality of the project
Fulfill the customers requirement
Able to propose a more effective
design as it provides a second key
design look
Whole life-cycle costing
B. Executive of
the Project
1.
2.
Objective of Client
To create a premium luxury condominium in the
heart of Kuala Lumpur with suitable materials.
To enhance the living standard of the customers t
hat is value for money.
Item
Problems
Unnecessary Cost
Dip Pool is unnecessary as there is a public pool available
Landscape is not needed as there is a terrace
These items have the potential to be the hidden
unnecessary cost in the project
Unsuitable Materials
Some materials suggested by the architect does not satisfy
the client, thus a better quality material needs to be
proposed in this VM study.
C. The Result of
Function Analysis
or any VM tools
and techniques
Functio
nal
Space
Analysi
s
Sharing
Creativity
Phase
Item
Ideas
Method
Increase Utilisation of
Space
Eliminate Unnecessary
Spaces or Functions
Category
of Ideas
1
Brainstorming
Result
Changing
design/Arrangement of
space
Increase Aesthetic
Appearance
Improve Privacy
Upgrading Sanitary
Appliances
Construct Recreational
Corner
Bath 1
Convert Private Lift Lobby to
sharing lift lobby
2 and 3
Evaluation
Phase
Item
Ideas
Increase Utilisation of
Space
Advantages
Add value to a
particular space
Disadvantages
Prolongation of
construction time
Allow fully
utilisation of extra
space
Allow fully utilise
of space
Item
To enhance living
standard
5
6
May prolong
construction period
To save cost
Eliminate Unnecessary
Spaces or Functions
Allow upgrading
of building
materials by using
the cost saved
Increase
bathrooms usage
Ris
k
Changing
design/Arrangement of
space
Occupants
opportunity cost of
having personal
private relaxation
space and private lift
lobby
Increase cooking
area
Upgrade Sanitary
Appliances
To attain value for Might cause delay
money appliances due to materials
quality
order lead time
To have private
karaoke room
Selection of
materials need to
consider project
cost and extra time
may needed
Increase personal's
area
Increase Terrace
Area
Ideas
Evaluation
of IdeasDisadvantages
Advantages
Construct
Recreational Corner To enhance living
standard
Evaluation
Possibility(Contd)
of Ideas Development from
Phase
Evaluation Process
1=Potential Idea
2=Potential Idea for
future use
3=Good idea but extra
fund is needed
4=Discard but keep on
record
mplementation Phase
Item
1
2
Ideas
Increase Utilisation of
Space
Implementation of Ideas
Construct home bar in family area
Eliminate Unnecessary
Spaces or Functions
Reason
A centre hub for
entertainment
Allow owners to work
from home
Eliminate Bath 1
Item
Ideas
Implementation of Ideas
Reason
Changing
Design/Arrangement of
Space
Increase Aesthetic
Appearance
Improve Privacy
B=Maintenance
C=Pattern Formation
D=Quality Finish
E=Durability
F=Cleanliness
A
H
G
B
C
C
D
D
E
E
F
H
G=Ease of Installation
H
H=Reliability of Supply
E
F
G
H
Weighted
Scoring
Ma
4
B=Durability
C=Energy Saving
D=Elegant Outlook
B
F
G
C
C
C
D
D
D
E=Ease of Installation
E
F=Reliability of Supply
G
F
G=Maintenance
Weighted Scoring Ma
D. Sketches of
Layout and
Implementation
Phase
Original Design
Proposed Design
E. Technical data
supporting the
selection of
alternatives
ALTERNATIVE M
ATERIALS
Area
Foyer,
living,
dining and
family area
Lighti Recesse Cove lighting Living and
ng
d
family area
fixtur lighting
GRANITE
A
Uniform
Alternative
ADVANTAGES
Good
Appearance
A beautiful natural appearance and very
distinctive look
Colour of granite will never fade
Visual appearance can be enhanced
Durable
Durability
Can
Scratch
Resistant
A very strong materials and is resistant to most scr
atches
Appearance can be maintained
Still look great for a long time
Easy
to Maintain
Resists material absorption and stains
Very easy to keep clean
Neutral detergent is the most suitable detergent fo
r cleaning
Maintenance cost will be reduced
COVE LIGHTING
One
ADVANTAGES
Aesthetics
Ideal
ight
The sources of cove lighting is hidden be
hind the ceilings or walls
F. COST PLAN/CO
ST ANALYSIS/CO
ST STUDY
G. ACTION
PLAN
H.
CONCLUSI
ON
CONCLUSION
Item
Improve Privacy
The savings for the cost per m2 for one unit is a total
of RM 413.90
5,884.54
457.23
Study, RM
RM or m2
savings
5,470.64
413.90
7%
457.23
0%
6%