KBR STANDARD PROJECT

IPMS CHAINS
FURNACES

Chain D-KDEL: Furnace Drawings


Includes: General Arrangement Drawings
Standards & Specification
Steel Design Drawings (Manual)
Pressure Parts - Design Drawings
Pipe Supports - Design Drawings
Support Castings - Design Drawings
Refractory - Design Drawings
Equipment & Bought-out Items - Analytical
Erection Packages, Operating & Maintenance Manual
100%

DD-STT

CPM
CHAIN

DD-ICM

Prepare & Issue Deliverable

DD-STT

DD-PRC

10%

IPMS
CHAIN

75%

Prepare
Duration_15d_

MILESTONES:
DD-STT
DD-PRC
DD-IST
DD-ICM

Start Document
Complete Prep
Start Document Issue
Complete Issue

DD-IST

DD-ICM

75%

100%

Finalize & Issue


Duration_5d__
Work Package Sub Types: MB1, MB2, MB3, MB4, MB5, MB6, MB7, MB8, MB9, MBX
Document Sub Types: MB1G, MB1D, MB2D, MB3D, MB4D, MB5D, MBDS

Chain M-KSST: Furnace Structural Steel


MD-BST
30%

CPM
CHAIN

MILESTONES:
MD-BST
MD-BCM
DD-STT
DD-DRC
DD-DCS
DD-FFC

DD-STT

DD-DRC

MD-BST

DD-STT

30%

Plant Layout
Release
Model
Duration_15_

30%

DD-FFC
15%

Finalize Design
& Prepare
Drawing

MD-BCM

DD-DCS

55%

Plant Layout
Release
Model

0%

IPMS
CHAIN

MDBCM

DD-DRC
85%

Finalize Design
& Prepare
Drawing

Complete IFC Model and Drawing


Check and Issue Drawing for
Construction

DD-DCS

DD-FFC

85%

100%

Complete IFC Model and Drawing


Check and Issue Drawing for
Construction

Duration_20_

Start Plant Layout Release Model


Plant Layout Release Model Completed (Primary and secondary members designed - not
checked. Ready for Piping Plant Layout Release.)
Start Drawing (start IFC drawing extraction)
Drawing Ready for Check
Drawing Check Started
IFC Model completed and Drawing checked and Issued for Construction

Duration_15_

IFC

Work Package Sub Types: MBM, MBX


Document Sub Types: MBX

Chain P-TPK:
Procurement (Acquisition) Chain
Tags and Equipment

CPM
CHAIN

AW-INT
DD-STT
DD-RFQ

DD-RFQ

Issue
Eng.
Scope

FQ-ISS

FQ-ISS

Issue
Inquiry

10%

FQ-REC

Evaluate Bids /
Make
Recommendation

0%

30%

FQ-REC

AW-ISS

AWINT

Issue
Interim
Award
(NOC)

15%

0%

Transport
& Deliver

PP-REL
PP-DES

Assemble
& Issue
ERW
5d

(5-20d)

DD-RFQ
10%
RF-ISS
10%
Prep &
Issue
RFQW
2d

RF-ISS
10%
FQ-ISS
10%
Prep &
Issue
RFQ
2d

FQ-BID
FQ-ISS
10%
10%
FQ-BID
FQ-TEC
10%
40%
Supplier
Prep
Bids
20d

Technical
Evaluation
10d

(10-20d)

PP-PHY

Receive & Accept


Initial
Supplier Data
20%

Issue
Formal
Award

Fab &
Ship

DD-STT
0%
DD-RFQ
10%

AW-ISS

FQ-TEC
FQ-REC
AW40%
40%
INT
FQ-REC
AW-INT
DD-REQ
40%
40%
40%
55%
Issue
Issue
Eval Bids
Interim
ERW for
& Issue
Award
Purchase
Recomend
(NOC) 2d
10d
2d

(10-15d)

PP-DES
MM-RAS

DD-REQ
55%
RQ-ISS
55%
Issue
REQ for
Purch
7d

PP-REL
100%
PP-DES
100%

RQ-ISS
55%
AW-ISS
55%
Issue
Forma
l
Award7d

PP-DES
100%
MM-RAS
100%

Receive & Accept


Final
Supplier Data
25%
PP-PHY
AW-ISS
55%
DD-ISC
55%
Supplier
Prep/
Submit
Initial Data

PP-CRT
DD-ISC
55%
PP-PHY
75%
Review
Initial
Supplier
Data
10d

(10-60d) 30d

PP-PHY
75%

Supplier
Prep/
MILESTONES:
Submit
DD-STT
Start Document
RQ-ISS
Req Issued to Purchase
DD-FSC Final Data
DD-RFQ
Issue ERW, RFS, or MTO
AW-ISS
Award Issue External
75%
RF-ISS
Issue RFQW
DD-ISC
Supplier Prep Initial Data
Transport
Fab &
FQ-ISS
RFQ (Inquiry) Issued
PP-PHY
Receive Initial Supplier Data
(10-30d) 20d
& Deliver
Ship
FQ-BID
Bids Return
DD-FSC
Supplier Prep Final Data
IPMS
60d
10d
FQ-TEC
Engineering Tech Review Complete
PP-CRT
Receive Final Supplier Data
Review
AW-INT
Issue Interim Award
PP-REL
Fab & Ship
CHAIN
Final
FQ-REC
Recommend Issue
PP-DES
Materials Shipped
Supplier
Work Package Sub Types: MB1, MB2, MB3, MB4, MB5, MB6,
DD-REQ
Update Reqmts for Purchase
MM-RAS
Receipt At Jobsite
Data 10d
MB7, MB8
NOTES:
1. Percentages shown are for Engineering Progress Only.
DD-FSC
Document Sub Types:MB1P, MB2P, MB3P, MB4P, MB5P,
2. Dotted boxes represent non-Engineering responsibilities only.
PP-CRT
75%
MB6P,
MB7P,
MB8P
3. International projects may require Consolidation yard milestone.
100%
4. Activity content & durations must be reviewed and modified to fit each projects requirements.