Vietnam Brewery Limited

Our journey towards


Leading in operational excellent

STEAM & AIR SAVING


Step 1: Investigation

Presented by Pham Minh Trung

No one learns without doing

Steam & Air Saving Practice Pham Minh Trung


1
Agenda

Part 1: Objectives & Targets


Part 2: Key Technical Issues
Part 3: Action Plan
Part 4: Detected Problems First step
Part 5: Next Step

Steam & Air Saving Practice Pham Minh Trung


2
Objectives & Targets

-To reduce fuel cost


-Steam: 80 Mj/hl by 2006
-Water: 5 hl/hl by 2006
-Electricity: 8 kw/hl by 2006
-Better SHE
-Reduce problem of automation
-and more ..
Ask Boon Hee !

Steam & Air Saving Practice Pham Minh Trung


3
Key Technical Issues

The major areas of energy conservation in steam


systems are the following:

Insulation hot pipings, 45C


Insulation boiler, 50C
condensate recovery, >85%, t>80C
trap flash loss,
steam trap leakage,
external steam leakage,
pressure loss due to improper piping sizing

pipe redundancy.

Steam & Air Saving Practice Pham Minh Trung


4
Key Technical Issues

Thermal conductivities

St.St. 304 13.97 W.m. C


St.St. 316 12.97 W.m. C
Carbon steel 45.31 W.m. C
Wrought iron 60.36 W.m. C
Cast iron 51.88 W.m. C
Aluminium 224.8 W.m. C

Steam & Air Saving Practice Pham Minh Trung


5
Action Plan
A-Step 1: Investigation

Note: -EM will involve in all items to evaluate and decide what to correct afterwards.
-Investigation results should be reported by pictures as much as possible in order to response to the Before
& After presentation later on.
-Any air leakage detected must be repaired/ replaced immediately. Do not wait for next step.

Item Task Who Complete

1-1 To check functions of all steam traps at Brewing + Utilities Phat 18-4-03

1-2 To check functions of all steam traps at Packaging Hai 18-4-03

1-3 To measure T of claddings of hot insulated equipment (boilers, piping..) if they are hotter than Phat+ Thai 30-4-03
45C
1-4 To check all air lines and tubes for leakage or breakage at silo, brewhouses and cellars Thai 18-4-03

1-5 To check all air lines and tubes for leakage or breakage at packaging. Hai 18-4-03

1-6 To check functions of all condensate related devices (storage tanks, return pumps, piping, control Thai + Phat + 30-4-03
valves) Hai
1-7 To investigate levels of understanding of operators about the function of steam traps and heat Thai + Hai + 30-4-03
saving Phat
1-8 Un-reasonable operation processes of consumers resulting too high consumption of steam, All 30-6-03
electricity, air, water .
1-9 To investigate the correctness of boiler operation procedures: EM + US 30-5-03
-In WI
-In practice
1-10 To measure condensate return quantity US 30-4-03

Steam & Air Saving Practice Pham Minh Trung


6
Some detected problems- Brewhouse

Temp. of cladding of the water


separator is 78C
78C

The steam reducing station of the


caustic plant BH1 is un-insulated.
This system is always very hot despite
the plant has been stopped for months.

Steam & Air Saving Practice Pham Minh Trung


7
Some detected problems- Brewhouse

Main steam supply lines to CIP plant


BH2 are un-insulated. The temp. of
this area is #50C.

The temp. of this area is #50C.


Its a harm to surrounding instruments.

Steam & Air Saving Practice Pham Minh Trung


8
Some detected problems- Brewhouse

They all have skin


temperature # 160C.

The surround temp. is


arround 50C

Steam & Air Saving Practice Pham Minh Trung


9
Some detected problems- Brewhouse

Naked Condensate System !


How sexy they are !

Steam & Air Saving Practice Pham Minh Trung


10
Some detected problems- Brewhouse

Leaks everywhere !

Steam & Air Saving Practice Pham Minh Trung


11
Some detected problems- Brewhouse

How to inspect a steam traps function


with such devices ??

Steam & Air Saving Practice Pham Minh Trung


12
Some detected problems- Silo

Spoiled Indicator
and dust filter inserts
are completely clogged !

Steam & Air Saving Practice Pham Minh Trung


13
Some detected problems- Bottling

Steam & Air Saving Practice Pham Minh Trung


14
Some detected problems- Bottling

!
e re
w h
e ry
e v
a ks
Le

Steam & Air Saving Practice Pham Minh Trung


15
Some detected problems- Bottling

!
d e
n u
e
th
k e
Li
Steam & Air Saving Practice Pham Minh Trung
16
Some detected problems- Canning

and the main steam supply


We couldnt check their
performance any more with the
sighglass like this
This heating station has never
been insulated, even the main heat
exchanger
Steam & Air Saving Practice Pham Minh Trung
17
Some detected problems- Canning
This condensate pump is very hot and continuously
operating, despite the line was stopped last week.
Its skin temp. is 105C but without insulation

and the main steam supply


Its skin temp. is 165C.

Steam & Air Saving Practice Pham Minh Trung


18
Some detected problems- Utilities

.. ..and the big boiler cover


like this is always at 85C

This condensate line is directly


drained off to the gutter

Steam & Air Saving Practice Pham Minh Trung


19
Some detected problems- Utilities

Strange !!!
Steam & Air Saving Practice Pham Minh Trung
20
Next step

-Problem investigation to be continued


-Co-operation with VIC to design removable insulation
blocks for steam valves, bottle washer heat
exchangers
-Repair/modification of boilers refractory &
insulations
-Reinsulation hot pipes that have cladding surfaces
are at t>45C if any. St.st. cladding to be applied.
-Insulate all naked hot equipment.
-and more ..please see Step 2 Action Plan.