TASKS ANALYSIS
Data da Reviso: 1
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
Welcome!
Safety Orientations
Data da Reviso: 2
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
1 OBJECTIVE, TARGET AND PRE-REQUIREMENT
Training Objective
Disseminar o mtodo de considerar, na Anlise Integrada de Processos, as tarefas realizadas pelo
mantenedores das reas de produo.
Target Audience:
Leadership (Managers and Leaders) of Production and Maintenance in our analysis process,
Responsible of the 5 quality dimensions (Health and Safety, Environment, Quality, Costs and Deliver)
and Management System that support the process and maintainers.
Pre-requirements:
Module 2 MS (Process Analysis)
GG10-01-OI (Usage of the Task Risk Determination Matrix 5X5 Matrix)
Data da Reviso: 3
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
2 PROCESS ANALYSIS BASIS FOR THE QUALITY PLANE
CONCEPTS REVISION:
Process: Collection of ordered and connected steps, with beginning and end defined, that aggregate value to
the products and services delivered, attending the requirement of the Stakeholders.
Process Step: Task collections, with product, supplier and client identified.
Task: Distinctive activities collection, in sequence and connected, that has the objective of producing a
specific result.
Activity : The smallest subdivision in a tasks execution.
RETURN
Data da Reviso: 4
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
3 BUSINESS DEFINITION
The Business Definition in the maintenance cells of the production areas must follow the previewed in the
MS Module 2 Process Analysis.
The Business exists for the attendance of the Stakeholders needs. In the Maitenance Case, the
Production is mandatorily one of the Stakeholders.
Authority Accountability
x x
x KPI
Critical Parameters
e
n sur
e
CIs CIs
Data da Reviso: 5
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
Example
MAINTENANCE
SUPPLIERS INPUTS PRODUCT/SERVICES CLIENTS
le
op
MAINTENANCE PRODUCTION
SAAE WATER
Pe
SERVICES AREA
PLANNED MAINTENANCE
PIECES - Preventive Maintenance, SPARE PARTS
WAREHOUSE - Predictive Maintenance,
- Programmed Corrective Maintenance
EQUIPMENTS UTILITIES
3
AUTONOMOUS MAINTENANCE
ENGINEERING AND INFRAESTRUCTURE
IMPROVEMENT AND TECHNOLOGY - Initial Cleaning,
- Combat to the locals with difficult
- access and dirty places,
- Revision and standardization,
- Training for general inspection,
- Autonomous Inspection,
- Organization and Managing of the
VERIFICATION ITEMS - work place KPIS
- Autonomous Planning Control
- Refuse to Risky task - Total Accidents (WLTA, Property Damage and LTA)
- Number of reports 5 - Environmental conformity index
- Control and Monitoring of wastes - Productivity
- water consumptions and generation of liquid effluents MAJOR REFORMS CONTROL - - Maintenance Interruption
monitoring - Fixed Cost for Maintenance
- Area Security evaluation
- Planning and big stops control - Variable Cost for Maintenance
- Attendance to the General Inspection panned
- Stops program
- QL overtime
- Stops planning
- Performance Evaluation
- Coordination and accompaniment of the
- Training Matrix Attendance
- stops
- Maintenance FA
- Planning and evaluation meetings
- Attendance to the Maintenance Plans
- Monthly Environment Evaluation 1
- Attendance to the Autonomous Maintenance Checklist
- Attendance to the Autonomous Maintenance Auditing
- Attendance to the training matrix DATA MANAGEMENT
- Inputs consumption in STAR
- Pieces and services consumption
- Urgent purchases
- Technical Documentation,
- Maintenance Data Base (SAP PM)
- Maintenance KPIs Managing
Data da Reviso: 6
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
Example
Data da Reviso: 7
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
4 PROCESS MAP
Its not necessary to criate a Process Map for the Maintenance Cell of the production areas. The
maintenance taks, as will be seen in the following slides, must be incorporated to the Productive Process
Map that is attends.
Data da Reviso: 8
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5 MAINTENANCE TASKS ANALYSIS
The objective of the Maintenance Tasks Analysis, inside of the Process Analysis, is to know and to treat the
critical points of these tasks, aiming the Process Stabilization where they will be executed.
For this, the following steps will be executed:
Data da Reviso: 9
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.1 Know the critical parameters of the process
Data da Reviso: 10
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.1 Know the critical parameters of the process
The Critical Tasks Analysis work in maintenance, starts from the Critical Parameters of the production
process.
Critical Parameter of the process is that one that has high impact over the products parameter
(processing or finished) in the process that is being analyzed, or in the subsequent products. The definition
of the Critical Parameters must follow the MS Module 2 Process Analysis.
PROCESS Process A
PROCESS X1 : X1 : X1 : X1 :
PARAMETERS X2 : X2 : X2 : X2 :
X2 : X2 : X2 : X2 :
... ... ... ...
The process parameters are associated to the respective steps of the process and are normally designed for
the letter (x). The critical parameters of the process are highlighted in relation to the others with the symbol
(*).
Data da Reviso: 11
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.2 List the maintenance tasks relevant for these parameters
Data da Reviso: 12
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.2 List the maintenance tasks relevant for these parameters
The question to be answered is: Which one of the Maintenance Tasks are relevant for the critical
parameters of production?
These tasks must be incorporated to the Process Map, in the respective step, and classified in Routine
or Extra Routine, according to MS Module 2 Process Analysis.
Routine Tasks:
- Inspections (preventives, perfectives, etc)
- Component changes based on time/number of operations
- Lubrication tasks planned
Observations:
1 - By Relevant, understand all of that, according to the Maintenance team evaluation, has the chance to
become a critical task.
2 The concept of Auxiliary Task does not apply to the maintenance tasks.
Data da Reviso: 13
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
Example
PROCESS Casting
Data da Reviso: 14
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
Example
ER = Extra
Routine R: Setting the twist cages between M1 and M2 - Electrical Preventive
R: Lubrication lace M2 (Articulation and Rollers) - Preventive Lubrication
R: Maintaining the pulse generator of electric motors M1 - Preventive
2 Instrumentation
R: Maintaining the pulse generator of electric motors M2 - Preventive
Instrumentation
ER: Changing the pulse generator - Corrective Emergency
ER: Exchange Roller lace - Emergency / Planned
Data da Reviso: 15
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.3 Identify which one of these tasks are critical
Data da Reviso: 16
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.3 Identify which one of these tasks are critical
Once listed, the maintenance tasks relevant to the Critical Parameters of the operation, it is necessary to
identify which one of these tasks are critical .
This identification must be done through the Tasks Risk Determinination Matrix (5x5 Matrix), according to the
instruction GG10-01-OI, that is, the same flow that was already practiced for the other process tasks.
Data da Reviso: 17
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.4 Deploy the critical tasks into activities
5.5 Identify the critical activities
Data da Reviso: 18
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.4 Deploy the critical tasks into activities
5.5 Identify the critical activities
In general terms, a task in composed by 5 to 10 activities.
The objective of the deployment in the critical task in activities in to clearly see which activities make the
task critical. In the activity level, it is not necessary to use the 5x5 matrix to evaluate which one of them are
critical. Generally, in this detailing level, the team knowledge is enough. The same suggested table can be
used for the other tasks, to do the step 5.3 to 5.6.
Data da Reviso: 19
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.6 Identify the potential losses in the critical activities
Data da Reviso: 20
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.6 Identify the potential losses in the critical activities
Understand what can happen if a Critical Activity is not executed or executed incorrectly.
Evaluate the potential wastes, according to the 5 dimensions:
Data da Reviso: 21
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.7 Treat the critical task and activities
Data da Reviso: 22
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.7 Treat the critical task and activities
Actions must be elaborated for the treatment of critical activities, wiling to eliminate the task, make it to stop
being critical or standardize.
1st: Eliminate the task or its critical activities
- Can the task/activity be eliminated?
2nd: Reduce the criticality
- The critical activity can be combined with others?
- The critical activity can be reorganized inside the task?
- The critical activity can be simplified or reduced?
- Something in the critical activity can be replaced?
- The critical task or activity can be replaced in somewhere else?
3rd: Standardize
Data da Reviso: 23
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
5.7 Treat the critical task and activities
- The remaining tasks of maintenance, that doesnt deploy processes critical parameters, must have its
criticality , according to the Safety dimension, analyzed and treated according to the item described in
the Practice 4 in the Safety GBS.
- After defined, the treatment will be done in the tasks and activities that are critical, what concludes the
Process Analysis and the Standardization step will be executed when this treatment starts.
Data da Reviso: 24
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
7 MAINTENANCE CRITICAL TASKS STANDARDIZATION
The standardization aims to ensure that everyone realizes the critical tasks correctly, in a safe way, with
environment protection, quality in the products and serviced, low cost and attendance to the delivery
prompts. For the critical tasks classified in Routine (Inspections), the standardization must be done in the
Maintenance System SAP PM, highlighting the critical tasks and activities (see example).
For the critical tasks that are Extra-Routine (Remove anomalies and breaks), must be used RP (routine
procedures) and/or OS (operational standard), according to each case.
Data da Reviso: 25
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0
8 PRACTICAL EVALUATION:
TIME OUT
0 min 5 min 10 min 15 min 20 min
Data da Reviso: 26
OI OPERATIONAL INSTRUCTION GG-OI-XXX-NNN DD/MM/AAAA
Reviso: 0