You are on page 1of 11

The higher the demands to protection are, the more advanced will the

Coating system and painting specification be. This, in turn, increases


the demands to the execution of the work - consequently to the degree
of quality control/ painting inspection

Level of Inspection
Three levels of inspection are cognized. British standard, BS 5493:1977,
defines them as follows :-

1. Full:- All operations observed by an inspector and passed


as complying with the specification before the next stage is
started. ( for Larger projects, this may require a team of inspectors.

2. Intermittent :- Part of all operations observed by an inspector and passed


as complying with the specification before the next stage is started. .

3. Occasional :- All operations observed initially by an inspector for setting


standards of workmanship. Ad hoc visits by an inspector thereafter.
Duties of the inspector :-

The duties of the paint coating inspector may be very briefly given as:-

- Spotting causes for possible later defects.


- Ensure that said causes are removed, or the defects corrected

The multitude of tasks belonging to paint coatings inspection may be conveniently


divided according to the progress of work. Five distinct phases some of them recurrent
require the inspectors attention.

1. Before surface preparation


Before the start of any surface preparation it would be advantageous to examine, at least
the surface to be treated, preparation equipment, and possibly also structural details.

Surface condition (steel) Important Check points :-


- Rust grades (eg. A,B,C or D according to SIS 05 59 00: 1967
- Laminations or inclusions
- Presence of water, Oil, Grease, Soluble salts, soot or other contaminants not
removed by mechanical cleaning.
- Sharp or rough edges.
- Rough or porous welds, weld spatter, arc strikes, excessive weld fumes (usually greasy
etc.)
2. During Surface Preparation :-
While surface preparation is in progress, relevant equipment checks are made at
regular intervals.
- Cleanness and
- Profile/ Anchor pattern
are monitored to the extent this is possible.

3. Before paint application :-


main areas, on which the inspector should focus his attention before any paint is applied, would
include the storage, mixing and issue of paints, working conditions and application equipment,
surface condition and the microclimate.

4. During paint application : -


During the application of paints, most of the checkpoints from foregoing phase remain valid.
in addition :
- wet film thicknesses and
- workmanship
are monitored to the extent possible.

5. After paint application:-


Always checked, after application of the final coat of paint are
- General appearance and
- Total dry film thickness applied
Checks may, in some cases and for particular jobs, be made on:
- Continuity ( free from pinholes)
- Adhesion / Cohesion
- Smoothness ( this is sometimes desired on the
underwater hull of the ships
INSPECTION INSTRUMENT
Surface Preparation

Elcometer 125
ISO Surface Comparator
Shot & Grit
Visual Assessment
Tactile Assessment
( touch )

Comparators, for determining surface roughness and profile


(anchor pattern)
INSPECTION INSTRUMENT
Surface Preparation
INSPECTION INSTRUMENT
Surface Preparation

Elcometer 122/124
Testex Tape & Dial Gauge
Different courses available

Replica of the profile


Measure total thickness
Subtract 50 microns (thickness of
hard plastic window)
e.g. 125 micron total thickness = 75
micron peak-to-valley height
INSPECTION INSTRUMENT
Surface Preparation

Elcometer 127
Keane-Tator Surface Profile
Comparator
Shot, Grit and Sand

Rugotest

Elcometer 129
Rubert Surface Comparator

Shot
Grit

Rugotest Surface
Comparator
Dual Rubert
INSPECTION INSTRUMENT
Surface Preparation

Elcometer 123
Surface Profile Gauge

Take average of several readings


Zero on Glass

Elcometer 224
Surface Profile Gauge

Take average of several readings


Built in memory & averaging facility
Digital Output
Digital display with data summary
Batch collection
INSPECTION INSTRUMENT
SALT DETECTION EQUIPMENT
Soluble Salts - The Problem
Salt Detection Methods
Salt Detection in Abrasives & Water

Bresle Patch (Elcometer 135/B)


Apply patch
Insert 3 ml of distilled water
Pump liquid to release salts
Extract solution
Test solution with conductivity meter
Available as a kit

Elcometer 130
(SCM400)
Wet filter paper with 1.6 ml water
Place paper on test site / surface for 2 min.
Place paper on electrode & close lid
Display shows salt level in g/cm
Know more www.blastlineinstitute.com

Thanks.

You might also like