PILING WORKS
c) the bottom of
the toes (other
driven piles)
PILING WORKS
Categories under First Division
Broadly, the categories under the First Division of this class are:
(a) Plant and equipment.
(b) Piles comprising:
(i) Bored piles.
(ii) Driven cast in situ concrete piles.
(iii) Caisson piles
(iv) Micropiles.
(v) Precast reinforced concrete piles.
(vi) Precast pre-stressed concrete piles.
(vii) Steel H-piles.
(viii) Steel pipe piles.
(ix)Timber piles.
(x) Precast pre-stressed concrete sheet piles.
(xi) Interlocking steel sheet piles.
(c)Miscellaneous work.
(d)Pile tests
General Measurement Rules
Measurement Rules M1
Bored & driven depth shall be measured
along the axes of piles from the
Commencing Surface :
Measurement Rules M1
Bored & driven depth shall be measured
along the axes of piles from the
Commencing Surface :
Measurement Rules M1
Bored & driven depth shall be measured
along the axes of piles from the
Commencing Surface :
Measurement Rules M2
Each group items for piles to be driven shall comprise :
Measurement Rules M3
Depth driven shall be measured from the cut-off levels
to the toe levels.
For driven cast in-situ and precast piles, the driven
depths shall be measured to the underside of shoes
which are at the bottom of casings or toes.
Measurement Rules M4
Reinforcement is measured in tonne and, to allow for
measurement of less than 1 tonne, the quantity shall be
stated up to two decimal places.
PILING WORKS
C1
COVERAGE RULES Include disposal of excavated and
surplus materials
C2
Include piling records
C3
Pre-boring are deemed to include
backfilling between the pile and the bore
C4
A1
C6
Include all necessary piling equipment, transportation,
handling, assembling and removal off the site.
C7
Moving and handling to include handling all piling plant
and equipment about the site as often and whenever
necessary
J2** 1. Bored piles
2. Driven cast in-situ
2.PILES concrete piles
M5 : To measure :
Total depth bored /driven/excavated
and state total no of pile points
An item for the total concreted length
of pile
MEASUREMENT
RULES M6 : Length of permanent casings:
bored pile (cut-off bottom of
casing)
driven cast in-situ (cut-off level
toe levels)
b total depth bored and an item for the total concreted length of
piles (Rule M5).
2.PILES 4. Micropiles
1 Depth bored - m
2 Boring through rock - m
3 Steel pipe as reinft - m
4 Reinft straight bars n.e 20mm dia - t
5 Reinft straight bars ex 20mm dia - t
6 Reinft helical bars - t
7 Grouting m3
8 Cut-off piles - nr
C13 : Boring through rock incl. artificial hard material
A9 : State diameter
A10 : Material, grade & size of reinft stated
A11 : Grouting state grout design mix and/or strength
J25* &J26* 5.Precast reinforced concrete piles
1. Supply - nr
2. Depth driven - m
3. Pre-boring - m
4. Jointing - nr
5. Filling hollow pipes
with concrete - m
6. Cut-off piles including
preparing heads - nr
A13 : Piles to state Initial/extension piles . Initial piles to state type of shoe
1.Supply
nr
2.Depth driven m
3. Jointing nr
4.Cut-off piles - nr
A17 : Supply state mass per metre, cross sectional dimension &
grade of steel
A18 : Details of treatment, coatings and cathodics protection stated
A19 : Type of jointing stated
A20 : Jack-in method stated if required
J31*
1.Timber piles
3.PILES
2. Depth driven m
1. Supply
3. Jointing
nr
4. Cut-off pile
D6 The length of timber piles are the total number of piles of stated
lengths
1. Supply. (nr) nr
2. Depth driven m2
m
3.Cut-off piles
D7 : DEFINITION RULES
Special piles are interlocking steel corner, junction, closure and taper piles
A28 : Item description for pile test must be stated the test loads.
Where the load is applied to raking piles item descriptions for
load tests also must be stated
sh_Piling Works